My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3010
>
1600 - Food Program
>
PR0503284
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 9:09:32 AM
Creation date
9/24/2020 8:50:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0503284
PE
1619
FACILITY_ID
FA0022671
FACILITY_NAME
WALMART #2025
STREET_NUMBER
3010
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
23860010
CURRENT_STATUS
01
SITE_LOCATION
3010 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />A <br />B <br />NEW ROOF -MOUNTED <br />CONDENSING UNITS. <br />REF OEM SUBMITTALS. <br />NEW ROOF PENETRATION <br />16"x8" CLEAR <br />RCU1 RCU2 <br />1RCU1RCU1.31.1RCU1 <br />RCU1.21RCU2 <br />RCU2.2RCU1.1 <br />8' IDD5SU-VCT <br />(EXISTING) <br />RCU1.2 <br />12' IDD5SU-VCT <br />(EXISTING) <br />RCU2.2 <br />4DR RL-VCT <br />(EXISTING) <br />RCU1.3 <br />12' IDD5SU-VCT <br />(NEW) <br />RCU2.1 <br />3DR RL-VCT <br />(NEW) <br />15.619 <br />15.619 <br />15.619 <br />15.619 <br />15.619 <br />EXISTING SELF-CONTAINED CASE CONVERTED <br />TO RCU FED. RE -USE EXISTING CONDENSATE <br />PUMP AND EVAP PAN HEATER. DEMO CASE - <br />MOUNTED CONDENSING UNIT. INSTALL <br />INCLUDED CONTROLLER AND TXV. (TYP 3) <br />15.629 <br />COORDINATE ROUTING OF <br />REFRIGERATION PIPING TO <br />AVOID CONFLICT WITH EXISTING <br />LIGHTING AND DUCTWORK (TYP) <br />CONDENSATE PUMPED TO <br />EVAPORATOR PAN MOUNTED <br />ON TOP OF CASE (TYP) <br />OGP STORAGE <br />6 <br />R2 <br />3 <br />R2 <br />15.610 <br />(TYP) <br />15.617 <br />1 <br />R2 <br />15.601 <br />15.602 <br />(TYP) <br />INSTALL LLSV <br />AT CASE. <br />2 <br />R2.1 <br />4 <br />R2 <br />15.624 <br />(TYP) <br />2 <br />R2 <br />5 <br />R2 <br />15.603 <br />15.612 <br />(TYP) <br />(SIM) <br />INSTALL LLSV <br />AT CASE. <br />2 <br />R2.1 <br />INSTALL LLSV <br />AT CASE. <br />2 <br />R2.1 <br />NEW ROOF -MOUNTED <br />CONDENSING UNITS. <br />REF OEM SUBMITTALS. <br />INSTALL LLSV <br />AT CASE. <br />1 <br />R2.1 <br />INSTALL LLSV <br />AT CASE. <br />1 <br />R2.1 <br />AIRFLOW (TYP)ROOF SLOPE1/4" \1'-0"8 <br />A <br />B <br />CONTRACTOR SHALL CARRY OUT ALL <br />NECESSARY MODIFICATIONS TO <br />CONVERT EXISTING SELF -CONTAINED <br />CASES TO RCU FED. REFER TO CASE <br />MANUFACTURER INSTRUCTIONS. <br />CONTRACTOR SHALL REPROGRAM <br />EXISTING DIXELL CONTROLLER <br />ACCORDING TO MANUFACTURER <br />INSTRUCTION. (TYP 3) <br />2 <br />R2.1 <br />1 <br />R2.1 <br />1 <br />R2.1 <br />OGP STORAGERIBDXLRIBDXL <br />RIBDXLFAXTELSHEET: <br />DRAWN BY: <br />CHECKED BY: <br />DOCUMENT DATE: <br />ISSUE BLOCKCONSULTANTSSTIPULATION FOR REUSEJOB NUMBER:STORE NO:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.PROTO: <br />ARCHITECT OF RECORD: <br />8131 METCALF AVENUE <br />SUITE 300 <br />OVERLAND PARK, KS 66204 <br />www.brrarch.com <br />TEL: 913-262-9095 <br />FAX: 913-262-9044 <br />EXISTING CONDITIONS WERE TAKEN FROM <br />ORIGINAL DRAWINGS AND MAY NOT REFLECT <br />EXACT "AS -BUILT" CONDITIONS. CONTRACTOR <br />SHALL FIELD VERIFY ALL EXISTING CONDITIONS <br />PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR <br />SHALL CAREFULLY COORDINATE NEW WORK AND <br />DEMOLITION WITH ALL OTHER DISCIPLINES AND <br />EXISTING CONDITIONS. <br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE <br />TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br />NOT RELIEVE THE RESPONSIBILITY OF PERFORMING <br />THE WORK PROPERLY. NO ADDITIONAL <br />COMPENSATION SHALL BE ALLOWED BECAUSE OF <br />CONDITIONS THAT OCCUR DUE TO FAILURE TO <br />FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.WWW.HENDERSONENGINEERS.COMR1 <br />FRONT <br />REFRIGERATION <br />PLAN 2080622025TRACY, CA06/24/2006/24/202025-248MAP <br />04/24/2004/24/20TRACY, CA3010 W GRANT LINE RDMARIAH B. MEYER <br />TREVOR G. JONES20806220258345 LENEXA DRIVE, SUITE 300LENEXA, KS 66214913.742.5000 913.742.5001 <br />TGJ <br />COMPLY WITH CLEAN AIR ACT, TITLE VI, SECTION 608 <br />AND CODE OF FEDERAL REGULATION TITLE 40, PART 82 <br />WHEN ADDING OR REMOVING REFRIGERATED <br />EQUIPMENT. RECORD ALL EQUIPMENT IDENTIFICATION <br />NUMBERS, MODEL AND SERIAL NUMBERS, THE AMOUNT <br />OF REFRIGERANT RECOVERED FROM EACH UNIT, THE <br />DATE OF DECOMMISSIONING, COMPANY NAME AND <br />SIGNATURE OF ON-SITE SUPERVISOR. <br />EPA CLEAN AIR ACT <br />11.02.15 <br />* MODIFY CIRCUIT <br />** NEW CASE, COIL, CIRCUIT OR VALVE <br />**** CHANGE EXISTING PIPE SIZE AS INDICATED <br />^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS <br />NOT EXPECTED. THIS IS FOR REFERENCE <br />ONLY AND IS TO BE USED IN THE EVENT THAT <br />A PIPING CONFLICT CAUSES THE NEED FOR A <br />RISER. IF THE RISER LENGTH EXCEEDS 4 FEET, IT <br />MUST BE APPROVED BY ENGINEER OF RECORD. <br /># CONTRACTOR TO FIELD VERIFY EXISTING <br />RISER SIZE. IF EXISTING PIPE SIZE DOES NOT <br />MATCH SCHEDULE, REPLACE EXISTING RISER <br />WITH NEW SIZE AS SHOWN. <br />PIPING SYMBOLS <br />24 HOURS PRIOR TO SHUTTING DOWN ANY <br />REFRIGERATION SYSTEMS, HVAC SYSTEMS OR ENERGY <br />MANAGEMENT CONTROLS SYSTEMS, SEND EMAIL TO <br />NSRM@WALMART.COM. THE E -MAIL SHALL STATE WHAT, <br />WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG <br />IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A <br />FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE <br />WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND <br />RUNNING. <br />KEYNOTES <br />15.601 SLOPE REFRIGERANT LINES BACK TO <br />COMPRESSORS AT 1" PER 20' OF RUN. LOCATE <br />HIGHEST POINT OF REFRIGERATION LINES JUST <br />BELOW BOTTOM CHORD OF JOIST OR BEAM. <br />COORDINATE ELEVATION TO AVOID CONFLICTS <br />WITH DUCTWORK, LIGHTING, SKYLIGHTS, ETC. <br />15.602 SUPPORT HORIZONTAL RUNS OF REFRIGERANT <br />LINES ON 1-5/8" X 1-5/8" UNISTRUT CHANNELS ON <br />MAXIMUM OF 6 FOOT CENTERS. <br />15.603 AT ALL POINTS WHERE SUCTION LINES RISE, <br />PROVIDE A SUCTION LINE TRAP AT THE BASE OF <br />THE RISER. <br />15.610 PROVIDE 0.020" PVC JACKET ON ALL <br />REFRIGERATION LINES EXTERIOR TO BUILDING. <br />15.612 PROVIDE INTERMEDIATE SUCTION LINE TRAP IN <br />WALL OR VOID SPACE. INTERMEDIATE TRAP <br />SHOULD BE PLACED AT THE MIDPOINT OF ANY <br />SUCTION LINE RISE WHICH EXCEEDS 16 FEET. <br />15.617 COORDINATE REFRIGERATION LINE <br />PENETRATIONS THROUGH ROOF. REINFORCE <br />ROOF STRUCTURE AS NECESSARY. CUT ROOF <br />OPENING FOR THE REFRIGERATION PIPE <br />PENETRATION AND SUPPLY ROOF CURB WITH <br />WEATHERTIGHT SHEETMETAL COVER. <br />PROPERLY FLASH, PATCH, AND REPAIR ROOF AS <br />REQUIRED FOR NEW PENETRATION. <br />COORDINATE EXACT SIZE AND LOCATION OF <br />ROOF PENETRATIONS WITH STRUCTURAL <br />DRAWINGS. <br />15.619 REFRIGERATION CONTRACTOR SHALL FURNISH <br />AND INSTALL LIQUID LINE SOLENOID VALVE AT <br />CASE/EVAPORATOR. PROVIDE CONTROL WIRING <br />FROM SOLENOID VALVE BACK TO THE ROOF <br />MOUNTED CONDENSING UNIT. <br />15.624 ROUTE REFRIGERATION LINES ON TOP OF CASE <br />FOR ALL TOP FED CONNECTED CASES. SLOPE <br />BACK TO COMPRESSOR AT 1" PER 20'-0" OF RUN. <br />REFER TO TOP FED PIPING DETAIL. <br />15.629 COORDINATE REFRIGERATED CASE THERMAL <br />EXPANSION VALVE (TXV), AND WALK-IN <br />EVAPORATOR TXV AND DISTRIBUTOR NOZZLE <br />REQUIREMENTS WITH ORIGINAL EQUIPMENT <br />MANUFACTURER AS REQUIRED FOR <br />CONVERSION TO NEW REFRIGERANT. <br />CONTRACTOR SHALL PROVIDE REPLACEMENT <br />VALVES/NOZZLES AS NECESSARY. <br />1/4" = 1'-0" 1 REFRIGERATION PLAN <br />REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL <br />FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO <br />REFRIGERATION EQUIPMENT. <br />ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A <br />WALMART APPROVED CONTRACTOR. <br />REFERENCE ARCHITECTURAL DRAWINGS FOR ALL NEW <br />CASES BEING INSTALLED FOR CONNECTION LOCATION OF <br />UTILITIES. (TOP FED VS BOTTOM FED) <br />VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES <br />WITH FINAL MERCHANDISE PLAN. <br />REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED <br />FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT <br />LIMITED TO): REFRIGERATED CASES, WALK -IN COILS, <br />ASSOCIATED VALVES, REFRIGERATION AND <br />CONDENSATE PIPING, HANGERS AND SUPPORTS, AND <br />CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL <br />OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH <br />PENETRATIONS TO MATCH EXISTING. REFER TO <br />ARCHITECTURAL DRAWINGS. <br />ALL EXISTING REFRIGERATED CASES ARE TO REMAIN <br />UNLESS NOTED OTHERWISE. <br />GENERAL NOTES <br />1. PLANS INDICATE GENERAL ROUTING OF <br />REFRIGERANT LINES, WITH A SINGLE LINE <br />SHOWN INDICATING BOTH SUCTION AND LIQUID <br />LINE ROUTING FOR EACH SYSTEM. <br />2. REFRIGERATION SYSTEM INSTALLATION SHALL <br />BE IN COMPLETE CONFORMANCE WITH <br />SPECIFICATIONS, AND WITH ALL REQUIREMENTS <br />OF REFRIGERATION EQUIPMENT <br />MANUFACTURER. <br />3. REFRIGERATION DRAWINGS ARE PROVIDED AS <br />AN AID TO BIDDERS AND TO INDICATE DESIRED <br />ROUTING OF REFRIGERATION LINES; <br />CONTRACTOR SHALL ASSUME FULL <br />RESPONSIBILITY FOR CORRECT INSTALLATION <br />OF PIPING AND ACCESSORIES TO PROVIDE A <br />COMPLETE AND FULLY OPERATING SYSTEM. <br />4. REFER TO SPECIFICATION 15600 FOR <br />INSULATION THICKNESS. INSIDE DIAMETER OF <br />INSULATION SHALL MATCH PIPE DIAMETER TO <br />MINIMIZE AIR GAPS BETWEEN PIPING AND <br />INSULATION. PROVIDE FACTORY PRE - <br />MANUFACTURED FITTINGS AT ALL TRAPS AND <br />ELBOWS. WHERE PRE -MANUFACTURED <br />FITTINGS ARE UNAVAILABLE MITER CUT ALL <br />FITTINGS TO ENSURE PROPER SEAL BETWEEN <br />INSULATION SEGMENTS. <br />5. PIPE INSULATION SHALL MATCH EXISTING <br />COLOR UNLESS NOTED OTHERWISE ON PLANS <br />OR SPECIFICATIONS. <br />6. BUILDING COMPONENTS ABANDONED BY THE <br />SCOPE OF WORK SHALL BE SECURED TO <br />PREVENT FALLING, LOOSENING, OR CREATING <br />DAMAGE OF ANY KIND IN THE FUTURE. <br />7. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD <br />OR REPLACE CASES, EVAPORATORS, ETC. THEN <br />24 TO 48 HOURS AFTER THE WORK IS <br />COMPLETED AND ALL FINAL ADJUSTMENTS <br />HAVE BEEN MADE, PROVIDE AND CHANGE <br />LIQUID LINE FILTER CORES, OIL SYSTEM FILTER <br />USING SPORLAN OF STYLE FILTER, AND <br />REPLACE SUCTION FILTERS. FILTERS ARE TO BE <br />RATED FOR WAX REMOVAL. CONTRACTOR TO <br />PROPERLY DISPOSE OF OIL AND COMPONENTS <br />REPLACED. REFER TO SPECIFICATION 15600. <br />8. REFER TO GROCERY ARCHITECTURAL <br />DRAWINGS FOR ADDITIONAL WORK BY <br />REFRIGERATION CONTRACTOR. <br />9. COMPLETE ASSET TAGGING PROCESS FOR ALL <br />NEW REFRIGERATED CASES. REFER TO <br />SPECIFICATIONS. <br />01.31.18 <br />XX.XXX <br />CONNECT TO EXISTING <br />CONTINUATION <br />ELBOW -TURNED DOWN <br />CONDENSATE DRAIN LINE (CD) <br />CLEANOUTS (CO) <br />EVAPORATOR COIL <br />REFRIGERATION KEYNOTE REFERENCE <br />REFRIGERATION PIPING (ABOVE) <br />CO <br />(DETAIL REFERENCE)DETAIL NUMBER <br />EXISTING TO REMAINETR <br />X <br />XX <br />XXX <br />XXX <br />ELBOW TURNED UP <br />ISOLATION VALVE <br />REFRIGERATION SYMBOLS <br />MODEL NUMBER <br />SHEET NUMBER <br />CIRCUIT NUMBER (CIRCUIT INFO) <br />REFRIGERATION PIPING (BELOW) <br />TYPICAL(TYP) <br />10.12.17 <br />CONDENSING UNIT <br />GENERAL NOTES <br />1. INSTALL CONDENSING UNIT IN ACCORDANCE WITH <br />MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br />REFER TO ARCHITECTURAL AND STRUCTURAL <br />DRAWINGS FOR INSTALLATION REQUIREMENTS <br />AND ADDITIONAL INFORMATION. <br />2. CONTRACTOR SHALL INSTALL CONDENSING UNIT <br />MANUFACTURER FURNISHED LIQUID LINE <br />SOLENOID VALVE CONTROLLED VIA FACTORY <br />INSTALLED TIME CLOCK AT CONDENSING UNIT. <br />3. CONTRACTOR SHALL INSTALL THE THERMOSTAT <br />BULB FOR CONDENSING UNIT CONTROL. MOUNT <br />IN THE DISCHARGE AIR PLENUM IN THE CENTER <br />OF THE CASE. <br />Updated: 7/8/2020 <br />THIS IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. <br />^^ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS. <br />BY ENGINEER OF RECORD. <br />THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED <br />REFERENCE ONLY AND TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES <br />^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR <br />RCU2.2 7/8 7/8 1/2 47 <br />RCU2.1 7/8 5/8 1/2 21 <br />1RCU2 1 1/8 7/8 1/2 19 <br />RCU1.2 1/2 3/8 ^ 1/2 10 <br />RCU1.1 1/2 3/8 ^ 1/2 2 <br />1.1RCU1 5/8 1/2 1/2 21 <br />RCU1.3 1/2 3/8 1/2 47 <br />1RCU1 5/8 5/8 1/2 15 <br />DESIGNATION SUCTION AS REQUIRED LIQUID LENGTH^^ <br />PIPE HORIZONTAL SUCTION RISER TOTAL <br />VERTICAL ESTIMATED <br />PIPING SCHEDULE SYSTEM RCU <br />1/4" = 1'-0" 2 REFRIGERATED CASE CONTROLS <br />NON -RESIDENTIAL MECHANICAL CALGREEN NOTES: <br />1. CONTRACTOR SHALL INSTALL ALL REFRIGERANT PIPING IN ACCESSIBLE LOCATIONS AND <br />COMPLY WITH THE REQUIREMENTS SET FORTH IN THE 2019 CALGREEN CODE SECTION 5.508.2.1. <br />2. CONTRACTOR SHALL PRESSURE TEST THE REFRIGERANT PIPING PRIOR TO EVACUATION AND <br />CHARGING PER THE REQUIREMENTS OF THE 2019 CALGREEN CODE SECTION 5.508.2.5. REFER <br />TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />3. CONTRACTOR SHALL EVACUATE REFRIGERATION PIPING PRIO R TO CHARGING PER THE <br />REQUIREMENTS OF THE 2019 CALGREEN CODE SECTION 5.50 8.2.6. REFER TO SPECIFICATIONS <br />FOR ADDITIONAL REQUIREMENTS. <br />ADD SHEET TO SET <br />1 <br />1 07/17/20 CCD#1
The URL can be used to link to this page
Your browser does not support the video tag.