My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 6:53:08 PM
Creation date
9/24/2020 9:39:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By : X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : X Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Pressure Gauges in Psi/Nitrogen Equipment Resolution : 1 / 10- 15 Psi <br /> Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # <br /> Piping Material : Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3 " 3 " 3 " <br /> Length of Piping Run : Approx. 245 ' Approx. 255 ' Approx. 145 ' <br /> Product Stored : Regular 87 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> i in -run isolation : Piping Sump # 1 Piping Sump #2 Piping Sump #3 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test : <br /> Test Start Time : 8 : 00 8 : 05 8 : 10 <br /> Initial Reading (Rj) : 5 Psi 5 Psi 5 Psi <br /> Test End Time : 9 : 00 9 : 05 9 : 10 <br /> Final Reading (RF) : 5 Psi 5 Psi 5 Psi <br /> Test Duration : 1 Hour 1 Hour 1 Hour <br /> Change in Reading (RF-RI) : 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No loss in Psi No loss in Psi No loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments — (inchide information on repairs made prior to testing, and recommended follolil-zip for failed tests) <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.