Laserfiche WebLink
SWRCB , January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By : ❑ Sump Manufacturer ❑ Industry Standard X Professional Engineer <br /> ❑ Other (Sped) <br /> Test Method Used : ❑ Pressure ❑ Vacuum X Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Caldwell Level Change Indicator Equipment Resolution : . 002 <br /> ,.a M _ _ <br /> , . 11 <br /> Sump # 1 -87 Sump # 241 Sump # 3 -Diesel Sump # <br /> Sump Diameter: 48 " 48 " 48" <br /> Sump Depth : 71 " 67" 68" <br /> Sump Material : Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 10" 14" 14" <br /> Highest Piping Penetration : <br /> Height from Tank Top to Lowest 22„ 21 > 22„ <br /> Electrical Penetration : <br /> Condition of sump prior to testing : Dry Dry Dry <br /> Portion of Sump Tested ' Water Level 26 " Water Level 25 " Water Level 26" <br /> Does turbine shut down when <br /> sump sensor detects liquid (both Yes Yes Yes <br /> product and water)? * <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail -safe Yes Yes Yes <br /> shutdown? * <br /> Was fail-safe verified to be No No No <br /> operational ?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes <br /> and starting test : <br /> Test Start Time : 8 : 52 8 : 02 8 : 07 <br /> Initial Reading (RI) : . 001 . 001 . 001 <br /> Test End Time : 9 : 22 8 : 32 8 : 37 <br /> Final Reading (RF) : . 001 . 001 . 001 <br /> Test Duration : 30 Minutes 30 Minutes 30 Minutes <br /> i <br /> Change in Reading (RF-RI) : 0 0 0 <br /> Pass/Fail Threshold or Criteria : . 005/30 Minutes . 005/30 Minutes . 005/30 Minutes <br /> Test Result: Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes <br /> 4 <br /> Was sensor properly replaced and I Yes Yes <br /> verified functional after testing? <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> i <br /> ' If the entire depth of the sump is not tested, specify how much was tested . If the answer to � of the questions indicated with an <br /> asterisk ( * ) is "NO" or "NA", the entire sump must be tested . ( See SWRCB L& 160) <br />