Laserfiche WebLink
t - - - - - _ STATE ROUTE 26 <br /> J� (EAST FREMONT AVENUE) - <br /> STATE ROUTE � STATE ROUTE 26AVE) <br /> V / x- <br /> o <br /> �xL x <br /> � � <br /> ( � <br /> Xxolo x-1° �� X GENERAL NOTESi <br /> J_j <br /> I. CONTRACTOR SHALL COORDINATE UNDERGROUND REQUIREMENTS WITH ALL <br /> OTHER TRADES TO AVOID CONFLICT. <br /> a 2. CONTRACTOR TO 51TE SURVEY EXI5TING CONDITIONS AND LOCATIONS OF <br /> EXI5TING UNDERGROUND SYSTEMS, WHERE (N) TRENCHWORK OCCURS PRIOR <br /> TO BIDDING. CONTRACTOR SHALL TAKE PROPER PRECAUTIONS TO ENSURE <br /> (E) UNDERGROUND 5Y5TEM5/0ONDUIT/PIPE5 ARE NOT DAMAGED DURING <br /> INSTALLATION. CONTRACTOR 15 RESPONSIBLE FOR ANY REPAIRS REQUIRED <br /> IN THE EVENT THE (E) UNDERGROUND SYSTEMS ARE DAMAGED A5 A RESULT <br /> SAFE DISPERSAL AREA <br /> 9,450 Sq. Ft OF THE (N) ELECTRICAL TRENCHWORK. <br /> ° . <br /> 3 Pi <br /> 3. SEE SINGLE LINE DIAGRAM FOR WIRE SIZES AND CONDUIT REQUIREMENTS. <br /> o <br /> 4. CONTRACTOR TO COORDINATE SITE PLAN TO COMBINE ALL UNDERGROUND <br /> CONDUIT IN COMMON TRENCH AS NECESSARY. VERDE DESIGN <br /> 5. ALL EMPTY CONDUIT SHALL BE PROVIDED WITH NYLON PULL CORD AS LANDSCAPE ARCHITECTURE <br /> NOTED IN THE SPECIFICATIONS. CIVIL ENGINEERING <br /> SPORT PLANNING& DESIGN <br /> b. ALL ELECTRICAL WORK SHALL BE INSTALLED PER 2016 NEC. <br /> 1843 Iron Point Rd #140 <br /> A Folsom,CA 95630 <br /> 4 . 11 1111 1 7. PRIOR TO ALL (N) TRENCHES, CONTRACTOR TO USA ALL (E) ELECTRICAL tel: 916.415.6554 <br /> __________________ __________________ CONDUITS AND OTHER UTILITIES TO FAMILIARIZE THEMSELVES WITH THE <br /> FIELD CONDITIONS AND ADJUST (N) TRENCHES ACCORDINGLY. fax:408.985.7260 <br /> x® www.VerdeDesignlnc.com <br /> o � fi 8 � 8. IN-GRADE PULL BOX IDENTIFIED WITH 'P' SHALL HAVE LID LABELED <br /> 13 <br /> 'ELECTRICAL'. <br /> 0 4 x ° _ _ o cl. IN-GRADE PULL BOX IDENTIFIED WITH '55HALL HAVE LID LABELED 'SIGNAL'. <br /> _ i STAMP <br /> i <br /> � 10. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SAW GUTTING AND p,NDSCgp <br /> - - REMOVAL OF EXISTING 5URFAGE5 TO FACILITATE UNDERGROUND SYSTEMS. �- <br /> o � L L <br /> o ; - - N ; THE CONTRACTOR SHALL PATCH AND REPAIR ALL DAMAGED AND OUT <br /> 'P <br /> W ' - - ' SURFACES TO MATCH ADJACENT. C'y <br /> _ _ <br /> CL A _ _ 0 1 � No. 4089 � <br /> >_ w _ _ o Q <br /> z o M <br /> II. CONTRACTOR SHALL COORDINATE FINAL LOCATION OF ALL IN-GRADE PULL W � <br /> o <br /> o o = _ o _ BOX WITH LANDSCAPE ARCHITECT. THE INTENT 15 TO VOID RELOCATING igna ure <br /> A O <br /> 11111111111 1 <br /> o - - PULL BOXES. <br /> < __ __ * EXPIRATION DATE: <br /> o 12. ALL POWER SYSTEM CONDUITS STUB IN "ELECTRICAL" PULL BOX AND ALL , JULY 2021 <br /> J' Q <br /> b m t COMMUNICATION SYSTEMS CONDUIT IN "51GNAL" BOXES AS REQUIRED BY qTF � <br /> m " OF � <br /> O A <br /> CAS <br /> AVYNVVV <br /> F e - - CODE. <br /> o <br /> CL flL v CONSULTANT <br /> Z m - - <br /> 2 INIIIIIN <br /> o m x w = = o = <br /> w M o i i QRO SIONq. <br /> ^' <br /> E16 <br /> 0 <br /> - - 1 9 N M <br /> O r #_ — i = = i * Exp. 06 0/21 <br /> v = = v <br /> F <br /> J CTRL F <br /> z <br /> CAL�F� <br /> M o <br /> mL------------------ ------------------J <br /> a <br /> 0 <br /> 0 ® \ SAFE DISPERSAL AREA <br /> d 3,587 Sq. Ft <br /> LU <br /> jx x x x xWx <br /> [L <br /> SHEETS NOTES: <br /> � American Consulting Engineers <br /> J B o O ROUTE NEW FIBER TO (E) MDF AND TERMINATE A5 REQUIRED. Electrical, InC. <br /> m } <br /> / O UTILIZE EXISTING 4"C - SPARE TO ROUTE NEW FIBER TO ATHLETIC Sano The Alameda, sure 200 408/236-2312 <br /> Q � �'F San Jose, Ca 95126 Fax: 408/236-2316 <br /> N / o ;i ® JOB E19147.00 <br /> 4 CONCESSION # <br /> (E)SIGNAL <br /> aF1PULL BOX#9 O4 (E) CAMERA TO BE REMOVED AS A RESULT OF (E) LIGHT POLES TO <br /> i? o%, ® I o E� BE DEMOLISHED. PROTECT CAMERA AND RETURN TO DISTRICT. <br /> 4 11 <br /> W o 0 o O5 (E) CAMERAS TO REMAIN. THE CONTRACTOR SHALL NEED TO TEST <br /> w ®: :.®vv®v ®Oe®.°.,°° . CAMERAS TO ENSURE OPERATIONAL PRIOR TO RECONNECTING <br /> z CAMERA GABLES AS A RESULT OF (N) 30 BOX BEING REPLACED <br /> a . <br /> o ® ® ® ® AND RELOCATED. SEE ELO DEMO WORK. <br /> a o SAFE DISPERSAL AREA <br /> (E)2"G 5 Sq. F ® <br /> z ` ' O (E) 50"x30"xb" 516NAL PULL CAN WITH PA/ INTERCOM, FA, DATA/ <br /> V) I tW 5I6NAt °; TEL. TH15 BOX WA5 INSTALLED WITH THE LOW VOLTAGE SYSTEMS <br /> o TO(E) IDF-IG <br /> - - PULL BOX N5 - NOTED FOR THE (E) CHILD CARE PORTABLE. <br /> W <br /> e a e O TO (E) FAGP AND MDF. <br /> U_ (E) IDF-IG OF BLDG.G <br /> o <br /> W o e GA <br /> p FARM STREET <br /> z (E) GP-IC <br /> I L o <br /> L (E)PANEL IHGI I p <br /> LU <br /> 1 <br /> O FARM STREET <br /> � - - - - - - - � - - - - - - - - - FAR, <br /> LU <br /> " 1 <br /> a (E)SIGNAL <br /> N PULL BOX a LL BOX#I2 <br /> o o J SHEET TITLE <br /> z <br /> 4 `�'�I j CONDUIT SCHEDULE ELECTRICAL <br /> Z f/ " CAMPUS NEW SITE PLAN <br /> o lE) x POWER SYSTEMS COMMUNICATION SYSTEMS <br /> w <br /> N I <br /> FULLIBOX PBI I (N) (1) - 4"C - POWER. II (E) (1) - 4"MT (CLOCK, PAGING, INTERCOM, INTRUSION). <br /> EL <br /> (E)SIGNAL II 0 O (N) (3) - 4"GO - SPARE. O (E) (I) - 4"MT (DATA, TELEPHONE). PROJECT NAME <br /> o PULL BOX - - <br /> (E)TELEPHONE MPOE I �u - (E) (2) - 4"MT (SPARE). <br /> r�(E)SIL II > SPARE (E) (4) 4"00 - SPARE. (E) (1) - :2"MT (SPARE). <br /> Li <br /> o PULL BOX <br /> E 1 - 1"MT EMS SPARE . <br /> a FRANKLIN HIGH SCHOOL <br /> � � TO(E) IHGI -50,26 � � � (E) (U - 2"MT (FIRE ALARM SPARE). <br /> — THRU LOP-IG <br /> 12 (E) (I) - 2"G (I) D3 (DATA). <br /> ATHLETIC IMPROVEMENTS <br /> 4a (E)4"MT-TELEPHONE L m o <^ x (E) (1) - 2"C (CLOCK, PAGING, INTERCOM, INTRUSION). <br /> a Z E . <br /> A II I L I _tl x (E) (1) - 2"0 (1) T4 (TELEPHONE). <br /> E I - 2"G (SPARE). <br /> a � A \ / (E)POLE LIGHTS <br /> o j (E) (U - I G (EMS). <br /> 3 ' (E)MDF 4 SIGNAL OI 2 II (E)4"MT-DATA I © ° M <br /> BACKBOARD. (E)4"MT-TEL. TO REMAINING POLES (E) (I) - I"G (FA). <br /> {�`� PROJECT ADDRESS <br /> a z VERIFY LOCATION. LIGHTS TOWARDS (E)2"G j <br /> m <br /> _ �, GYMNASIUM 4600 E. FREMONT ST. <br /> C3 I � (E)FAGP LJ - n <br /> Z - LJ R <br /> N - - - (E)SIGNAL PULL BOX' E 3 STOC KTO N CA 95 215 <br /> r, (E)2"MT-FA (E)4"MT-DATA (E)WALL MOUNTED / <br /> LUJ (E)4"MT-TELEPHONE PULL CAN. <br /> (EI GAME (TYPJ <br /> O11- 2 3 <br /> �7_ I (E)PB lx SUBMITTAL DATE <br /> 0 1 E DD/50% SUBMITTAL 03/06/2020 <br /> a <br /> EL <br /> Ld o / DSA 100% SUBMITTAL 05/01/2020 <br /> a (E)CONDUITS 12 I (E) ,"G o / (E)2 G <br /> r 11�F IN SUSPENDED <br /> M CEILING <br /> (E)5I6NAL ° <br /> " PULL BOX J <br /> o <br /> Q Z EAST MINER AVENUE C 2 O (PULL BOXY <br /> i (E)4"G 2 11 <br /> 0 �m <br /> 9 0 <br /> Qwo a m NO. REVISIONS DATE <br /> ° } (E)PB <br /> rn w / Q <br /> �M z / Q <br /> Z I E <br /> o m , <br /> N - - - - o `�'� � <br /> aw <br /> MINER AVE x Q <br /> Ld <br /> o r a ,„ Q <br /> - (E)2"C-CAMERA <br /> Zo ` " ° <br /> V)� f / <br /> EL It! f �^ ° x ° O (E) <br /> w xio / <br /> Z� " �/ DRAWN BY CHECKED BY <br /> 6 (E)PB MG SB/ SF <br /> ww <br /> W o ° DATE ISSUED SCALE <br /> ofa �'` x <br /> 05/01 /2020 AS NOTED <br /> on <br /> vvia PROD. NO. <br /> L <br /> d`` 1 <br /> ELECTRICAL CAMPUS NEW SITE PLAN NORTH 1911000-1211 <br /> 0 0 0' 35' 70' 140' 210' <br /> SHEET NO. <br /> Ld OfE 1 .3 SCALE: I" = 50'-O" El .3 <br /> —JafOF <br /> <0 <br /> DRAWING NAME: \\ACEEDC2\projects\projects\Year 2019\E19147 Franklin HS Additional Athletic Improvement\ATHLETICS (Ball Fields & POOL)\E1.3_Electrical Campus Site Plan_New.dwg <br /> PLOT DATE: 04-30-20 PLOTTED BY: sbuhay <br />