My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4600
>
3600 - Recreational Health Program
>
PR0360045
>
WORK PLANS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 4:52:57 PM
Creation date
9/24/2020 3:19:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3600 - Recreational Health Program
File Section
WORK PLANS
RECORD_ID
PR0360045
PE
3616
FACILITY_ID
FA0002104
FACILITY_NAME
SUSD-FRANKLIN HIGH SCHOOL
STREET_NUMBER
4600
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14331006
CURRENT_STATUS
01
SITE_LOCATION
4600 FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_L L I' C12110 WOMEN 0 M <br /> ♦■ M L I <br /> II / ® ■ <br /> L— <br /> I 'G -11 r- <br /> - <br /> Q' �/GONGE5510 <br /> / I <br /> rn <br /> ° / ♦ ■ 1 <br /> / ♦ Q, ■ <br /> ° v won os.wnan uie , 0 <br /> / VERDE DESIGN <br /> ❑ ° / <br /> / ♦ ° / ;,� LANDSCAPE ARCHITECTURE <br /> CIVIL ENGINEERING <br /> ♦ I „ SPORT PLANNING& DESIGN <br /> 1843 Iron Point Rd #140 <br /> _ r♦♦ O Folsom,CA 95630 <br /> ❑ ♦ / �\ ♦ tel: 916.415.6554 <br /> fax:408.985.7260 <br /> ® ♦ \ www.VerdeDesignlnc.com <br /> 4 I I/2"G -ID <br /> ♦ GONGE ON ` n ° <br /> „ a <br /> i \ G <br /> o --------- / ♦ �°,� \ .J STAMP <br /> DS <br /> Zr / ♦ v , Q�v SAN0 LJ <br /> w <br /> ° ♦ \ � � No. 4089 � <br /> aII/2" IDF IN <br /> 4 / \ LQ C�7 <br /> o SO LJ <br /> I o <br /> p ♦ O v 2"G -111 IN' , Signature <br /> o I // ♦ v 4 1 \ NGESSION IXPIRATION DATE: <br /> 4 2 \ �� / P <br /> o �Z ■ ■ � ■ ■ � ■ ■ � ■ ■ EM� ■ ■ � ■ ■ � ■ ■ � ■ ■ ®I //acPs // JULY 2021 Q. <br /> 4 ` 1 �9TF�F A1-�F���\ <br /> w / C <br /> o <br /> �� w<-,fl k/ ♦ v v (Y�') ■ CONSULTANT <br /> C <br /> o ' ' o © F5 — — o // / 2 4 \ I 4 <br /> c ,.. �_ ■ i lwP v / Q E16890 <br /> 1 ■ \ / O \ 1 I Exp. 06/30/ <br /> 4' ` <br /> } i 5 ■ `♦ v \\ 1 1/2" -IDF`W <br /> ® .. ..® o I ♦ E .. e O p \\ GONGE ION ♦ 4 T O \F� <br /> a — ° °,g ■ / O Q F F CAL <br /> ° ° ■ / / 2 4 5 <br /> (n f Q o \ <br /> a <br /> ■ — ® ♦` , / <br /> o <br /> ♦♦ I _ <br /> ♦�♦♦ — - - 46 °Ofk <br /> O PA KING Sr CP20008's O I a <br /> Ld <br /> American Consulting Engineers <br /> w o Electrical Inc. <br /> ® 1590 The Alameda, Suite 200 408/236-23o <br /> 12 <br /> Q Os 0 Co m / \ 5 San Jose, Ca 95126 Fax: <br /> p 408/236-2316 <br /> viNi ■ 507 o x �X - - - o- - - - - - - - - - - - -° � // JOB # E19147.00 <br /> — — <br /> a I � ® ■ - - -- -- e e- e e e- -_ - -- -- L ■ v O <br /> a of ■ I ❑❑ I 2 / $ <br /> Ofx ❑ / 4 ef8 <br /> s <br /> • � <br /> ■ L Of <br /> a <br /> vi <br /> ■ �� / <br /> o 0 <br /> NLLI <br /> I ° 3 <br /> ■ I 2 �/ 00 O <br /> ■ <br /> (n I ° / <br /> 0 <br /> ■ - ------o e-e-e-e-e-e ------ <br /> Z <br /> o ■ <br /> J ■ �/ / <br /> 2 <br /> — L — — L <br /> All <br /> 3 I <br /> z ■ ` OHO\ � SHEET TITLE <br /> o ■ <br /> 0000000000 0000000000 0000000000 0000000 <br /> o/ <br /> F- <br /> C) <br /> I 0000000000 0000000000 0000000000 0000000 0 O ELECTRICAL EGRESS <br /> � A.PN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O <br /> Z X4,3,3 ■ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 <br /> 40,6 ■ o 0 0 1 / \ \ <br /> /j LIGHTING PLAN <br /> Q -e---------o-------- ------ <br /> a o <br /> w ■ \ <br /> o \ b <br /> W PROJECT NAME <br /> o � o <br /> w ■ b <br /> z I v <br /> . v zg'• o FRANKLIN HIGH SCHOOL <br /> ATHLETIC IMPROVEMENTS <br /> o <br /> Ujw <br /> c�i I ?g•. o 0�vo . <br /> 0o 0 o O O o00 0 0 0 0 0 0,o.. �.. ?g.. �.. ?g• .. ,�.. .. ?g.. Wig.. kol- <br /> ix <br /> zg'• o a ?g.. ?g.. ?g., o ?g.. 0 .. �.. ?g <br /> Y1 — — — — — — — _ — — — 7A•• p JO.. JO,, zq,• ° ?4" O ,T6.• 0 <br /> `77 <br /> z — 7\1� _ ( ) \7 <br /> PROJECT ADDRESS <br /> a <br /> 4600 E. FREMONT ST. <br /> z ELECTRICAL EGRESS LIGHTING PLAN STOCKTON, CA 95215 <br /> 0 <br /> w <br /> E 1 .2 50 ALE: I" = 40'-O" <br /> U_ SUBMITTAL <br /> 0 <br /> DATE <br /> NORTH <br /> o <br /> DD/50% SUBMITTAL 03/06/2020 <br /> Of <br /> GENERAL NOTES: SHEETS NOTESi CONDUIT SCHEDULE <br /> (L <br /> w <br /> DSA 100% SUBMITTAL 05/01/2020 <br /> z <br /> z <br /> m 1. CONTRACTOR SHALL COORDINATE UNDERGROUND REQUIREMENTS WITH ALL 11. CONTRACTOR SHALL COORDINATE FINAL LOCATION OF ALL IN-GRADE PULL OI LOCATE (E) POWER PULL BOX AND STUB NEW CONDUIT AS SHOWN. POWER SYSTEMS <br /> OTHER TRADES TO AVOID CONFLICT. BOX WITH LAND50APE ARCHITECT. THE INTENT 15 TO VOID RELOCATING <br /> W PULL BOXES. O2 <br /> 0 CONTRACTOR TO TRENCH DEEPER TO AVOID (E) 4"G PG$E PRIMARY. OI (N) (2) 1 1/4"C - LIGHTING <br /> 2. CONTRACTOR TO SITE SURVEY EXISTING CONDITIONS AND LOCATIONS OF EXISTING PC74E 15 ROUGHLY 36 DEEP. CONTRACTOR TO VERIFY CONDUITS (N) (1) 1 1/4"00 - SPARE <br /> 12� EXISTING UNDERGROUND SYSTEMS, WHERE (N) TRENGHWORK OCCURS PRIOR 12. ALL POWER SYSTEM CONDUITS STUB IN "ELECTRICAL" PULL BOX AND ALL CAN CROSS. PROVIDE (N) CONDUIT HAS IS" SEPARATION FROM (E) P64E <br /> <Z TO BIDDING. CONTRACTOR SHALL TAKE PROPER PRECAUTIONS TO ENSURE COMMUNICATION SYSTEMS CONDUIT IN "516NAL" BOXE5 AS REQUIRED BY CONDUIT. O (N) (1) 1 1/4"C - LIGHTING <br /> (E) UNDERGROUND 5Y5TEM5/CONDUIT/PIPE5 ARE NOT DAMAGED DURING CODE. (N) (1) 1 1/4"GO - SPARE <br /> W INSTALLATION. CONTRACTOR 15 RESPONSIBLE FOR ANY REPAIRS REQUIRED O CONTRACTOR SHALL P051TION FIXTURE SUCH THAT THE FIXTURE READ DOES NO. REVISIONS DATE <br /> N W IN THE EVENT THE (E) UNDERGROUND SYSTEMS ARE DAMAGED A5 A RESULT 13. ALL PULL BOXES SHALL BE TRAFFIC RATED 5101-1UNLE55 NOT HANG OVER THE CONCRETE PAVEMENT TO AVOID FIRE LANE. O (N) (4) I I/4"0 - LIGHTING <br /> F OF THE (N) ELECTRICAL TRENCHWORK. OTHERWISE NOTED. SEE DETAIL FOR SPECIFICS. (N) (1) 1 1/4"GO - SPARE Q <br /> } O NEW SECURITY CAMERA. UTILIZE IN-GRADE 516NAL BOX TO ROUTE GABLES <br /> 00 3. SEE SINGLE LINE DIAGRAM FOR WIRE SIZES AND CONDUIT REQUIREMENTS. 14. COORDINATE PULL BOX ORIENTATION WITH LANDSCAPE ARCHITECT TO IPF. SEE E2.1 FOR IN-GRADE 516NAL BOX LOCATION. O (N) (2) 1 1/4"C - LIGHTING - BATTING GAGE Q <br /> W o TO BE SQUARE WITH SURFACE CURB, CONCRETE WALKWAY, <br /> Cn <br /> W 2 4. CONTRACTOR TO COORDINATE 517E PLAN TO COMBINE ALL UNDERGROUND DRAINAGE, ETC. O PROVIDE (N) TIMER SWITCH IN HEAVY DUTY, NEMA-3R, LOCKABLE, GASKET <br /> aw CONDUIT IN COMMON TRENCH AS NECESSARY. BOX. TIMER SHALL BE WATT5TOPPER "T5-400" TIME SWITCH. CONTRACTOR O (N) I 1/4"G - LIGHTING - BATTING GAGE Q <br /> �o I5. ALL WALKWAY LIGHTING POLE SHALL BE NUMBERED TO IDENTIFY POLE. SHALL PROVIDE ALL REQUIRED ACCESSORIES, CONDUIT, GABLES, ETC. FOR <br /> o� 5. ALL EMPTY CONDUIT SHALL BE PROVIDED WITH NYLON PULL CORD AS PROVIDE STANDARD ADHESIVE NAME PLATE PER MANUFACTURES COMPLETE INSTALLATION. Q <br /> NOTED IN THE SPECIFICATIONS. <br /> RECOMMENDATION. <br /> D 16. ALL WALKWAY POLE5 ARE 15' IN HEIGHT WITH FLUSH BASE. PROVIDE AND Q <br /> 00 <br /> 6. ALL ELECTRICAL WORK SHALL BE INSTALLED PER 2016 NEC. INSTALL AS NOTED ON POLE BASE DETAIL. <br /> Q�of 7. PRIOR TO ALL (N) TRENCHES, CONTRACTOR TO USA ALL (E) ELECTRICAL 1-1. LIGHTING ON EMERGENCY GIRGUITS SHALL BE ROUTED IN EMERGENCY <br /> aw CONDUITS AND OTHER UTILITIES TO FAMILIARIZE THEMSELVES WITH THE CONDUIT. DO NOT SHARE WITH NON-EMERGENCY CIRCUITS. <br /> azo <br /> N FIELD CONDITIONS AND ADJUST (N) TRENCHES ACCORDINGLY. „ DRAWN BY CHECKED BY <br /> < 15. N-a BOXES WITH EMERGENCY CIRCUITS SHALL BE LABELED EMERGENCY MG SB/ SF <br /> z 8. IN-GRADE PULL BOX IDENTIFIED WITH 'P' SHALL HAVE LID LABELED LIGHTING" <br /> z0 'ELECTRICAL'. Iq. IN-GRADE PULL BOX IDENTIFIED WITH "L" SHALL HAVE LID LABELED DATE ISSUED SCALE <br /> Qa Q. IN-GRADE PULL BOX IDENTIFIED WITH 'S' SHALL HAVE LID LABELED 'SIGNAL'. "LIGHTING". OSLO 2020 AS NOTED <br /> a 20. ALL IN-GRADE PULL BOXES SHALL BE 81324 UNLE55 OTHERWI5E NOTED. PROJ. NO. <br /> zw 10. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SAW GUTTING AND 1911000-1211 <br /> Fn.. REMOVAL OF EXI5TING SURFACES TO FACILITATE UNDERGROUND SYSTEMS. <br /> 0o THE CONTRACTOR SHALL PATCH AND REPAIR ALL DAMAGED AND GUT SHEET NO. <br /> 0 o SURFACES TO MATCH ADJACENT. C • <br /> L OF <br /> U <br /> DRAWING NAME: \\ACEEDC2\projects\projects\Year 2019\E19147 Franklin HS Additional Athletic Improvement\ATHLETICS (Ball Fields & POOL)\E1.2-Electrical Lightting Site Plan NEW.dwg <br /> PLOT DATE: 04-30-20 PLOTTED BY: sbuhay <br />
The URL can be used to link to this page
Your browser does not support the video tag.