Laserfiche WebLink
MONITORING AND 100RTING PROGRAM NO. 0 7 <br /> SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br /> FOR POST-CLOSURE AND CORRECTIVE ACTION MONITORING <br /> CORRAL HOLLOW MUNICIPAL SOLID WASTE LANDFILL <br /> SAN JOQUIN COUNTY <br /> analyzed for the constituents of concern specified in Table V every five years. All <br /> monitoring parameters shall be graphed so as to show historical trends at each <br /> sample location. <br /> 4. Facility Monitoring <br /> a. Facility Inspection <br /> Annually,prior to the anticipated rainy season,but no later than 30 <br /> September, the Discharger shall conduct an inspection of the facility. The <br /> inspection shall assess damage to the drainage control system, <br /> groundwater monitoring equipment(including wells, etc.), and shall <br /> include the Standard Observations contained in section F.41. of Order No. <br /> Any necessary construction, maintenance, or repairs shall be <br /> completed by 31 October. By 15 November of each year,the Discharger <br /> shall submit an annual report describing the results of the inspection and <br /> the repair measures implemented, including photographs of the problem <br /> and the repairs. <br /> b. Storm Events <br /> The Discharger shall inspect all precipitation, diversion, and drainage <br /> facilities for damage within 7 days following major storm events. <br /> Necessary repairs shall be completed within 30 days of the inspection. <br /> The Discharger shall report any damage and subsequent repairs within 45 <br /> days of completion of the repairs, including photographs of the problem <br /> and the repairs. <br /> The Discharger shall implement the above monitoring program on the effective date of this <br /> Program. <br /> Ordered by: <br /> GARY M. CARLTON, Executive Officer <br /> (Date) <br /> WWA: 16 April 2001 <br />