My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 3:11:20 PM
Creation date
9/28/2020 9:19:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
FACILITY_NAME
H&S Energy Products,#3034
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br /> Test Method By : o Manufacturer • Industry Standard o Professional Engr o Other ( see below ) <br /> Test Method Uses : • Pressure o vacuum o Hydrostatic Other ( see below ) <br /> Measuring Equipment Used : Pressure Gauge ( range 0 to 15 psig ) <br /> Description Line # 1 Line #2 Line #3 <br /> Tank product Gasoline - 87 Gasoline - 89 Gasoline - 91 <br /> Pipe manufacturer Ameron Ameron Ameron <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 <br /> Secondary pipe diameter (inches) 3 3 3 <br /> Method of secondary pipe isolation Termination Boot Termination Boot Termination Boot <br /> Location of secondary pipe isolation STP / UDC STP / UDC STP / UDC <br /> Estimated length of piping run (feet) <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr: min ) 0 : 05 0 :05 0 :05 <br /> Test start time 10:59 AM 10: 12 AM 10 :00 AM <br /> Initial pressure (psig) 5 .0 5.0 5.0 <br /> Test end time 11 :59 AM 11 : 12 AM 11 :00 AM <br /> Final pressure (psig) 5 . 0 5 .0 5 . 0 <br /> Test duration (hr: min) 1 : 00 1 : 00 1 :00 <br /> Change in pressure (psig) 0 . 0 0 . 0 0.0 <br /> Pass/Fail threshold (psig) 0 . 5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments : <br /> © 2017 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.