Laserfiche WebLink
MONITORING SYSTEM CERTIFICATION <br /> CERTIFICATION / TEST DATE : December 06 , 2017 <br /> Al . FACILITY A2 . OWNER <br /> Name Colonial Energy #40134 Name Colonial Energy, LLC . <br /> Address 1434 W. Yosemite Avenue , Manteca , CA 95337 Address 2860 N . Santiago Blvd . 2nd Floor, Orange, CA 92867 <br /> Phone # 916=285=7402 Phone # 714 =761 -5426 <br /> Contact Station Manager Contact Victor Hassan <br /> F . IN -TANK GAUGING / SIR EQUIPMENT : ■ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed . <br /> This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring . <br /> Complete the following checklist : <br /> ❑ Yes ❑ No * Has all input wiring been inspected for proper entry and termination , including testing for ground faults ? <br /> ❑ Yes ❑ No * Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No * Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No * Was accuracy of system water level readings tested ? <br /> ❑ Yes ❑ No * Were all probes reinstalled properly? <br /> ❑ Yes ❑ No * Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected . <br /> G . LINE LEAK DETECTORS ( LLD ) : ❑ Check this box if LLDs are not installed . <br /> Complete the following checklist : <br /> ■ Yes ❑ No * For equipment start-up or annual equipment certification , was a leak simulated to verify LLD performance? <br /> ❑ N/A (check all that apply) Simulated leak rate: ■ 3 g . p . h . ; ❑ 0 .1 g .p. h . ; ❑ 0 .2 g .p .h . <br /> ■ Yes ❑ No * Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No * Was the testing apparatus properly calibrated ? <br /> ■ Yes ❑ No * For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No * For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ■ N/A <br /> ❑ Yes ❑ No * For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ■ N /A or disconnected? <br /> ❑ Yes ❑ No * For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ■ N/A or fails a test? <br /> ❑ Yes ❑ No * For electronic LLDs, have all accessible wiring connections been visually inspected ? <br /> ■ N/A <br /> ■ Yes ❑ No * Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected . <br /> H . COMMENTS <br /> © 2017 Walton Engineering, Inc. <br /> Page 3 of 3 <br />