Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by © Manufacturer 0✓ Industry Standard © Professional Engineer <br /> Test Type 0 Pressure F] Vacuum ❑r Hydrostatic <br /> Test Equipment Used: Vacuum Decay Mechanical Gauge <br /> Tank ID 87 Gasoline 91 Gasoine Diesel <br /> Tank Manufacturer Modern Modern Modern <br /> Tank Capacity 12K 10K 8K <br /> Test Start Time 09:23 09:25 09:30 <br /> Initial Reading -7 Hg -7 Hg -7 Hg <br /> Test End Time 10:23 10:25 10:90 <br /> Final Reading -7 Hg -7 Hg -7 Hg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/- 0 +/- 0 +/- 0 <br /> Tightness Test Results M✓ Pass 0 Fail 0✓ Pass © Fail ® Pass © Fail © Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 0 Vacuum © Hydrostatic <br /> Test Equipment Used: Pressure Decay Mechanical Gauge <br /> Pipe Run ID 87 Product 91 Product Diesel Product <br /> Pipe Manufacturer Ameron Ameron Ameron <br /> Test Start Time 9:27 9:32 9:39 <br /> Initial Reading 5 psig 5 psig 5 psig <br /> Test End Time 10:27 10:32 10:39 <br /> Final Reading 5psig 5 psig 5 psig <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/- 0 +/- 0 +/- 0 <br /> Tightness Test Results Pass El Fail 0 Pass rj Fail Pass ID Fail 0 Pass 0 Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results [M Pass 0 Fail C Pass r] Fail I 0 Pass 0 Fail C Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />