Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: INCON STS <br /> Sump/UDC ID 87 STP 91 STP Diesel STP UDC 1-2 <br /> Sump Manufacturer Unknown Unknown Unknown Bravo <br /> Sump Depth (inches) 48 52 46 9 <br /> Sump Bottom to Top of 18 18 17 Bottom <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:51 10:51 10:18 11:44 <br /> Initial Reading 2.2018 2.6591 4.0787 0.5511 <br /> Test End Time 11:06 11:06 10:33 11:59 <br /> Final Reading 2.2016 2.6574 4.0784 0.5503 <br /> Change in Reading 0.002 0.0017 0.0003 0.0008 <br /> Pass/Fail Criteria +/- 0.002 +/- 0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results Ej Pass rl Fail Ej Pass r] Fail © Pass © Fail 0 Pass EFail <br /> Sump/UDC ID UDC 3-4 UDC 5-6 UDC 7-8 <br /> Sump Manufacturer Bravo Bravo Bravo <br /> Sump Depth (inches) 9 9 9 <br /> Sump Bottom to Top of Bottom Bottom Bottom <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 12:26 11:44 11:44 <br /> Initial Reading 1 .5553 1.6837 0.8942 <br /> Test End Time 12:41 11:59 11:59 <br /> Final Reading 1 .5556 1.6834 0.8929 <br /> Change in Reading 0.0003 0.0003 0.0013 <br /> Pass/Fail Criteria +/- 0.002 +/- 0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results © Pass Q Fail © Pass Q Fail ©✓ Pass © Fail I Pass Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />