Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page4 of 6) <br /> VIII , MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring, Y N NA <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, O ❑ ❑ <br /> functionally tested , and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with ❑ ❑ <br /> their proper operation ? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested , and confirmed operational? © ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ® ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ® ❑ <br /> disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® ❑ LE:]] <br /> Which sensors initiate positive shut down ? (Check all that apply.) Sump ® Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e . g . , modem) operational? <br /> For any answer of "N " above, describe in Section IX how and when these deficiencies were or will be corrected, <br /> IX . COMMENTS <br /> Replaced TLS battery for PM purpose . <br /> X. IWTANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control . (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> This section must be completed ifin4ank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and tennination , including testing for © 11 [1round faults? <br /> Were all in -tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally © El F1tested , and confirmed operational ? <br /> Was accuracy of system's product level readings tested ? © ❑ ❑ <br /> Was accuracy of system' s water level readings tested ? © ❑ ❑ <br /> Were all probes reinstalled properly? ✓❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> For any answer of "N " above, describe in Section XI how and when these deficiencies were or will be corrected. <br /> XL COMMENTS <br /> i <br /> i <br /> i <br /> E <br /> t <br /> r <br /> I <br /> i <br /> i <br /> Y = Yes, N = No, NA = Not Applicable <br /> i <br /> i <br />