My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2802
>
2300 - Underground Storage Tank Program
>
PR0516736
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 11:36:54 AM
Creation date
9/28/2020 9:28:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0516736
PE
2361
FACILITY_ID
FA0012764
FACILITY_NAME
SAFEWAY FUEL CENTER #1769
STREET_NUMBER
2802
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2802 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 5 of 6) <br /> 11 Will IS i ISO:! <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ® ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified : ® 3 GPH ❑ 0 . 1 GPH ❑ 0 .2 GPH <br /> Was the testing apparatus properly calibrated ? [1 ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ [1] <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected ? ❑ ❑ 1 91 <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected ? [� ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected ? ® ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ® ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks ? Q ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? Q ❑ <br /> For any answer of "N " above, describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> 87 has 2 Turbines with PLLD's <br /> XIV. VACUUM / PRESSURE I HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> [� Check this box if VPN monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring, <br /> System Type (Mark all that apply. ) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces ? ❑ Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = NotApplicable, VPH = VacuumPressure/Hydrostatic, ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.