Laserfiche WebLink
SWRCB , January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By : ❑ Piping Manufacturer i7/1 Industry Standard ❑ Professional Engineer <br /> Other (Specify) <br /> Test Method Used : 1/1 Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used : Equipment Resolution : <br /> Piping Run # $7 Piping Run # 91 n Piping Run # 91 S Piping Run # diesel <br /> Piping Material : fiberglass fiberglass fiberglass fiberglass <br /> Piping Manufacturer: amron amron amron amron <br /> Piping Diameter: 3 .50" 3.50" 3. 50" 3.50" <br /> Length of Piping Run : 125' 125' 125' 60' <br /> Product Stored : gasoline gasoline gasoline diesel <br /> Method and location of clam shell in sump clam shell in sump clam shell in sump clam shell in sump <br /> piping-run isolation : <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time : 10 :00am 10: 15am 10: 15am 9:45am <br /> Initial Reading (Rt) : 5. 00" 5.00" 5.00" 5.00" <br /> Test End Time : 11 : 00am 11 : 15am 11 : 15am 10:45am <br /> Final Reading (RF) : 5 .00" 5.00" 5.00" 5.00" <br /> Test Duration : 60 minutes 60 minutes 60 minutes 60 minutes <br /> Change in Reading (RF-R,) : 0 . 00" 0.00" 0.00" 0.00" <br /> Pass/Fail Threshold or 0. 00" 0.00" 0.00" 0 .00" <br /> Criteria : <br /> Test Result : Z Pass ❑ Fail 2 Pass ❑ Fail 9 Pass ❑ Fail W Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recommended folloiv-ilp for•failed tests) <br /> had to install 1 /4" plugs at bottom of clam shells in 87 ,91 n & 91 s to seal off air. there are Schrader style valves at the top of the clam shells to be able to <br /> .,.0 air Chi i..Lq am testing - - <br /> i <br /> i <br /> i <br />