My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
10/7/2020 11:53:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By : ❑ Sump Manufacturer V�, Industry Standard 0 Professional Engineer <br /> 0 Other (Specify) <br /> Test Method Used : 0 Pressure 0 Vacuum Ell Hydrostatic <br /> 0 Other (Spec) <br /> Test Equipment Used : INCON Equipment Resolution : <br /> Sump # $ 7 Sump # Q1 n Sump # Q1 S Sump # diesel <br /> Sump Diameter : 48.00" 48.00" 48 .00" 48.00" <br /> Sump Depth : 55 .00" 57. 00" 60.00" 62.00 <br /> Sump Material : fiberglass fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 14.00" 14 .00" 14.00" 14 . 00" <br /> Highest Piping Penetration : <br /> Height from Tank Top to Lowest <br /> Electrical Penetration : 12.00" 12.00" 12 .00" 12 . 00" <br /> Condition of sump prior to testing : clean clean clean clean <br /> Portion of Sump Tested ' 18.00" 18. 00" 18. 00" 18 .00" <br /> Does turbine shut down when 0 yes 0 No 0 NA <br /> sump sensor detects liquid (both 0 Yes D No V NA 0 Yes 0 No P NA 0 Yes 0 No Fv1 NA <br /> product and water)?' <br /> Turbine shutdown response time n/a n /a n /a n/a <br /> Is s stemrogrammed for fail-safe 0 Yes 0 No Z NA <br /> F1 Yes C� No [✓; NA 0 Yes r] No FNA ❑ Yes P No � NA <br /> shutdown?* � <br /> Was fail-safe verified to be 0 Yes 0 No fel NA 0 Yes 0 No 1Z NA 0 Yes 0 No nZ NA 0 Yes 0 No Cry NA <br /> operational?` <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test : <br /> Test Start Time : <br /> Initial Reading (RI) : <br /> Test End Time : Please see incon results <br /> Ple <br /> Final Reading (RF) : <br /> FT:est :Duration . <br /> hange in Reading (RF-Rr) : <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: U Pass 0 Fail Ci Pass 0 Fail Z Pass 0 Fail D Pass 0 Fail <br /> Was sensor removed for testing? ' Yes ❑ No ❑ NA W yes ❑ No ❑ NA D/ Yes 0 No 0 NA Yes ❑ No �1 NA <br /> Was sensor properly replaced and [7 Yes 0 No 0 NA yes No ❑ NA <br /> p p y p ! V Yes 0 No 0 NA 1% Yes [-] No ❑ NA <br /> verified functional after testing? <br /> Comments — (include igforniation on repass made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested, specify how much was tested . If the answer to ainy of the questions indicated with an <br /> asterisk ( * ) is "NO" or "NA" , the entire sump must be tested . (See SWRCB LG - 160) <br /> I <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.