Laserfiche WebLink
SWRCB , January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By : ❑ UDC Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other ('Specify) <br /> Test Method Used : ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used : Equipment Resolution : <br /> y <br /> UDC # 1 /2 UDC #3/4 UDC #5/6 UDC # 7/8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material : steel steel steel steel <br /> UDC Depth : 10.00" 10. 00" 10. 00" 10.00" <br /> Height from UDC Bottom to Top 0 .00" 0.00" 0.00" 0.001, <br /> of Highest Piping Penetration : <br /> Height from UDC Bottom to 0 .00" 0.00" 0 .00" 0.00" <br /> Lowest Electrical Penetration : <br /> Condition of UDC prior to clean clean clean clean <br /> testing : <br /> Portion of UDC Tested ' 7 .00" 7.00" 7.00" 7.00" <br /> Does turbine shut down when U Yes ❑ No Lv] NA <br /> UDC sensor detects liquid (both n Yes U No Z NA i=1 Yes ❑ No 'Z NA ❑ Yes ❑ No ✓' NA <br /> product and water)?' <br /> Turbine shutdown response time n /a n/a n/a n /a <br /> Is s stemro rammed for fail- ❑ Yes U No Z NA <br /> � ❑ Yes U No i1 NA ❑ Yes [I No 1/1 NA ^ Yes E! No iii NA <br /> safe shutdown? <br /> Was fail -safe verified to be U Yes ❑ No Z NA <br /> ❑ Yes ❑ No Z NA E-1YesU No (� NA Cl Yes ❑ No Fv] NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time : <br /> Initial Reading i) : <br /> Test End Time : <br /> Final Reading (RF) : Please see incon results <br /> Test Duration : <br /> Change in Reading ( RF-Rj) : <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: 0, Pass ❑ Fail L11 Pass 0Fail C7 Pass " ❑ Fail Z Pass ❑ Fail <br /> Was sensor removed for testing? k Yes ❑ No ❑ NA C! Yes ❑ No U NA rel Yes ❑ No ❑ NA Ir Yes ❑ No ❑ NA <br /> Was sensor properly replaced and C1 Yes ; No U NA Ev 7 Yes ❑ No ❑ NA 2 Yes U No ❑ NA <br /> verified functional after testing? Yes F., No ❑ NA <br /> Comments — (include information on repairs made prior to testing, and recorrrrnended folloiv-vp for,failed tests) <br /> ' If the entire depth of the UDC is not tested, specify how much was tested . If the answer to an of the questions indicated with an <br /> asterisk ( ) is "NO" or "NA" , the entire UDC must be tested . (See SWRCB L& 160) <br /> i <br /> 1 <br /> E <br />