My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
10/7/2020 11:53:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By : ❑ UDC Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other ('Specify) <br /> Test Method Used : ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used : Equipment Resolution : <br /> y <br /> UDC # 1 /2 UDC #3/4 UDC #5/6 UDC # 7/8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material : steel steel steel steel <br /> UDC Depth : 10.00" 10. 00" 10. 00" 10.00" <br /> Height from UDC Bottom to Top 0 .00" 0.00" 0.00" 0.001, <br /> of Highest Piping Penetration : <br /> Height from UDC Bottom to 0 .00" 0.00" 0 .00" 0.00" <br /> Lowest Electrical Penetration : <br /> Condition of UDC prior to clean clean clean clean <br /> testing : <br /> Portion of UDC Tested ' 7 .00" 7.00" 7.00" 7.00" <br /> Does turbine shut down when U Yes ❑ No Lv] NA <br /> UDC sensor detects liquid (both n Yes U No Z NA i=1 Yes ❑ No 'Z NA ❑ Yes ❑ No ✓' NA <br /> product and water)?' <br /> Turbine shutdown response time n /a n/a n/a n /a <br /> Is s stemro rammed for fail- ❑ Yes U No Z NA <br /> � ❑ Yes U No i1 NA ❑ Yes [I No 1/1 NA ^ Yes E! No iii NA <br /> safe shutdown? <br /> Was fail -safe verified to be U Yes ❑ No Z NA <br /> ❑ Yes ❑ No Z NA E-1YesU No (� NA Cl Yes ❑ No Fv] NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time : <br /> Initial Reading i) : <br /> Test End Time : <br /> Final Reading (RF) : Please see incon results <br /> Test Duration : <br /> Change in Reading ( RF-Rj) : <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: 0, Pass ❑ Fail L11 Pass 0Fail C7 Pass " ❑ Fail Z Pass ❑ Fail <br /> Was sensor removed for testing? k Yes ❑ No ❑ NA C! Yes ❑ No U NA rel Yes ❑ No ❑ NA Ir Yes ❑ No ❑ NA <br /> Was sensor properly replaced and C1 Yes ; No U NA Ev 7 Yes ❑ No ❑ NA 2 Yes U No ❑ NA <br /> verified functional after testing? Yes F., No ❑ NA <br /> Comments — (include information on repairs made prior to testing, and recorrrrnended folloiv-vp for,failed tests) <br /> ' If the entire depth of the UDC is not tested, specify how much was tested . If the answer to an of the questions indicated with an <br /> asterisk ( ) is "NO" or "NA" , the entire UDC must be tested . (See SWRCB L& 160) <br /> i <br /> 1 <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.