My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1829
>
2300 - Underground Storage Tank Program
>
PR0546066
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:27:27 PM
Creation date
10/12/2020 8:08:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0546066
PE
2351
FACILITY_ID
FA0026050
FACILITY_NAME
7 ELEVEN STORE #41187
STREET_NUMBER
1829
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
CURRENT_STATUS
03
SITE_LOCATION
1829 N WILSON WAY
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> COUNTY <br /> 5 . Provide written notification to ust@sjgov . org to arrange the following inspection appointments . <br /> All appointments must be scheduled 48 hours in advance . <br /> a) Inspection for brine leaks prior to tank placement in excavation . All tank pre- installation tests shall be <br /> performed according to tank manufacturer instructions . <br /> b) Verification of tank set, anchorage , appropriate backfill , and appropriate additional corrosion protection <br /> of tank anchors (turnbuckles , eye bolts , etc . ) . Additional corrosion protection is required on all exposed <br /> metal prior to covering . <br /> c) Primary tank test, according to manufacturer' s specifications . <br /> d ) Primary piping soap test of all piping and penetrations ( product, vapor recovery , and vent) : One- hour <br /> pneumatic pressure test at 110 % of operating pressure , or 40 psi , whichever is greater, in accordance <br /> with manufacturer installation instructions . <br /> e) Verification of secondary piping slope at 1 /8 inch per foot or greater, to a containment sump with an <br /> audible/visual alarm . <br /> f) Secondary piping soap test of all piping and penetrations ( product , vapor recovery , and vent) : One- <br /> hour pressure test at the manufacturer' s recommended specification . <br /> g ) Verification of all pipe setbacks , cross-overs , and burial depth according to the manufacturer' s <br /> installation instructions and verification of appropriate piping backfill . <br /> h ) Integrity testing of all sumps per the manufacturer' s installation instructions , prior to backfill . <br /> i ) Verification of leak monitoring communication for all installed vacuum , pressure , or hydrostatic (VPH ) <br /> components including piping , sumps , under dispenser containment sumps ( UDCs ) , and all chase lines . <br /> Communication at end points of each vacuum zone and each vacuum monitored sump must be <br /> verified independently in operating condition . <br /> j ) Verification of the dispenser footprints contained by the UDCs . Any potential leaks from piping and <br /> fuel filters must drain directly into UDCs . <br /> k) Enhanced Leak Detection ( ELD ) testing , after facility is in operating condition . Appropriate test <br /> notification , tester certifications , and test method disclosure is required . Passing ELD test results must <br /> be received prior to receiving fuel . <br /> 1 ) Verification of VPH components installation ( shroud boots and band clamps for spill containers , <br /> appropriate rubber-type gasket or clamps on lids on all fill , vent and STP sumps , etc . ) . <br /> m ) Verification of overfill prevention prior to first fuel delivery : Measurement of drop tubes to verify 95 % <br /> tank volume shut off and/or verification that external audible/visual alarm activates when tank is 90 % <br /> full . <br /> n ) Spill bucket test, prior to first fuel delivery : Verify minimum 5 -gallon capacity and pass a one hour <br /> hydrostatic test (or equivalent) . Proper drainage method must be verified . <br /> o ) Monitoring system functionality , prior to first fuel delivery : Functionality of the monitoring system must <br /> be verified to ensure it meets the requirements of California Code of Regulations ( CCR) Title 23 and <br /> California Health & Safety Code ( HSC ) Chapter 6 . 7 . <br /> p) Leak detector test , after first fuel delivery : Leak detector must be tested to confirm that the device can <br /> detect a leak of 3 gallons per hour at 10 psi . Leak detector monitored line volumes shall be appropriate <br /> for the make and model of the installed leak detectors , and shall be verified at the time of installation . <br /> q ) Monitoring system functionality , after first fuel delivery , in operating condition : Functionality of the <br /> monitoring system must be verified to ensure it meets the requirements of CCR Title 23 and HSC <br /> Chapter 6 . 7 . <br /> 6 . A valid California Department of Tax and Fee Administration ( CDTFA) number must be obtained and <br /> provided to EHD prior to fuel drop . This number must be uploaded into the California Environmental <br /> Reporting System ( CERS ) at https : Hcers . calepa . ca . gov . <br /> 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.