Laserfiche WebLink
employed and accessible by not mor¢ than one flight of stairs. The plans shall indicate [he <br /> location of the toilet facilities and the travel distance from work ar¢as. <br /> 13. This project will ba required to comply with the Model Water Efficient Landscape Ordinance <br /> requirements of the California Coda of Regulations,Title 22, Division 2, Chapter 2.7 <br /> I. FIRE CODE REQUIREMENTS: Th¢ following California Fira Code (CFC) requirements wilt be <br /> applicabi¢ to the proposed project. Tha following conditions shall ba addr¢ssed prior to submittal <br /> of a building permit application to the Building Inspection Division. <br /> 1. CFC 507 Fire Protection Wat¢r Supply-Fire flow and hydrants shall be provided for the <br /> propos¢d project by the use of CFC Appendix B <br /> 2. If Fire Prot¢ction Systems are required they shall be installed according to the CFC, Chapter 9 <br /> and the appropriate standards and guides adopted in Chapter 35 of the California Building <br /> Code and-the California Electrical Coda. <br /> 3. CFC, Section 503 Fire Apparatus Access Roads-shall be provided as required in this section. <br /> 4. CFC, Stiction 906 Portable Fire Extinguishers-provide portable fire extinguish¢rs as required <br /> by this section. <br /> 5. CFC, Section 506 Kay Box-A Knox Box shall be installed according to the Iocai fire <br /> department's Instructions. Make application for the key box at the fire district having jurisdiction <br /> of this project. If there is an electronically controlled-acc¢ss gate at this site a Knox key switch <br /> will also be required. <br /> 6. CFC, Section 500'1.3.3.1 Properties of Hazardous Materials-a complete list of hazardous <br /> materials used and/or stored at this site shall be provided. <br /> 7. A complete review, at building permit submittal, will require compliance with applicable codes <br /> and ordinances. <br /> 8. CFC, Section 1 O5 Permits:Operational Permits may be r¢quired priorto occupancy. <br /> m. AGRICULTURAL MITIGATION:Agricultural mitigation Is required for this project pursuant to PA- <br /> 14000017 8 PA-1400018. Agricultural mitigation- shall b¢ satisfied by granting a farmland <br /> conservation ¢as¢ment or other farmland conservation easement mechanism as set forth in <br /> Subsection (d)of[Section 9-1080.3]to or for the b¢n¢fit of a Qualifying Entity.The number of acres <br /> of agr(cultural mitigation land shall be at least equal to the number of acres that will be changed to <br /> anon-agricultural use [1:t ratio]. Agricultural mitigation is required prior to issuance of a building <br /> permit. <br /> 2 DEPARTMENT OF PUBLIC WORKS (Contact [209] 468-3000, sae.memo dated OSEaber�2�2020 <br /> 20.2022) <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (Contact: [209] 468-3420, see memo dated Oetabar'� <br /> 2g2g June 7.20221 <br /> 4. SAN JOAQUIN COUNCIL OF GOVERNMENTS(Contact:[209]235-0600,see memo dated November <br /> 25, 2019) <br /> 5. CITY OF STOCKTON (Contact:[209] 937-8750, see m¢mo dated January 27, 2020) <br /> 6. SAN JOAQUIN COUNTY MOSQUITO AND VECTOR CONTROL DISTRICT(Contact:[559]230-5937, <br /> sea letter dated October 19, 2020. <br /> PA-1 900197—Conditions of Approval 4 <br />