Laserfiche WebLink
DocuSign Envelope ID:72F38DE1-5850-4316-87c'^ 98FE0389CECC <br /> the construction,roadway, grading, site work and buildings,landscaping in an efficient manner. <br /> Construction of the roadway frontage improvements would be completed along with the grading, <br /> site improvements and buildings. IAA would like to be able to construct the structures when the <br /> site and contractor are ready,regardless of the status of the roadway construction. <br /> One of the structures is a Pre Engineered Manufactured Building(PEMB) and is being delivered <br /> to the site this week. Due to on-going manufacturing and shipping delays industry wide,this <br /> building was ordered in anticipation of permits being issued by now and the delays in permit <br /> approvals will add to the storage costs including site security until the building can be erected. <br />