Laserfiche WebLink
t <br /> California Integrated Waste <br /> State of California Management Board <br /> CIWMB 188 Closed Disposal Site Inspection Report Page of 2 <br /> (Rev 8105) <br /> d.rrz <br /> San Joaquin County Environmental Health Department <br /> � nk <br /> v <br /> 39-CR-0033 3/14/07 ` <br /> Time Inspection Time <br /> e In: <br /> Facility Name Received By(Operator) <br /> World Enterprises I I Mailed to operator <br /> Facility Location Owner <br /> Turnpike Road,South of Downing I l <br /> Inspector Inspector Signature Also Present <br /> Natalia Subbotnikova <br /> THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF DIVISION 30 OF THE PUBLIC RESOURCES CODE(PRC),AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS(CCR). <br /> THE STANDARDS BELOW ARE CONSIDERED IN COMPLIANCE UNLESS OTHERWISE MARKED WITH ONE OF THE FOLLOWING:V=VIOLATION A=AREA OF CONCERN <br /> i <br /> 20750-SITE MAINTENANCE 00 20820-DRAINAGE/EROSION 00 <br /> 21180-POSTCLOSURE MAINTENANCE Q O 21150-DRAINAGE/EROSION CONTROL 00 <br /> 21190-POSTCLOSURE LAND USE 00 <br /> oil <br /> 20790.LEACHATE CONTROL 00, <br /> 20918-EXEMPTIONS 00 20830-LITTER CONTROL 00 <br /> 20919-GAS CONTROLS O Q 21160-LF GAS CONTROL/LECHATE CONTACT 00 <br /> 20919.5-EXPLOSIVE GAS CONTROL !� QM= owls= 111,11 <br /> 20921-GAS MONITORING AND CONTROLS 00 20530-SITE SECURITY Oe 0 <br /> 20923-MONITORING O O 21135-SECURITY AT CLOSED SITES 00 <br /> 20925-PERIMETER MONITORING NETWORK 010, 21137-STRUCTURAL REMOVAL 00 <br /> 20931-STRUCTURE MONITORING 00 <br /> 20932-MONITORED PARAMETERS 00 21130-EMERGENCY RESPONSE PLAN 00 <br /> 20933.MONITORING FREQUENCY —50 21170-RECORDING O O <br /> 20934-REPORTING 00 21200-CHANGE OF OWNERSHIP O Q <br /> 20937-CONTROL 00, <br /> 21880-CERTIFICATION OF CLOSURE 00 <br /> 20650-GRADING OF FILL SURFACES O O 21890-REVISION OF APPROVED PLANS FOR C/PC MAINTENANCE 00 <br /> 21140-FINAL COVER O O <br /> 21142-FINAL GRADING O O O O <br /> 21145-SLOPE STABILITY 00 OQ <br /> 00 <br /> Comments(Note:for additional or continued comments use the C/WMB 03 or attach additional pages.) <br /> Routine quarterly inspection conducted this date,see continuation sheet for further detail. <br /> INSTRUCTIONS ON BACK <br /> 0 - Middle-LEA Bottom-Operator <br />