My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013457
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARDINAL
>
731
>
2600 - Land Use Program
>
PA-1900061
>
SU0013457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 8:32:27 AM
Creation date
10/28/2020 8:30:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013457
PE
2626
FACILITY_NAME
PA-1900061
STREET_NUMBER
731
Direction
S
STREET_NAME
CARDINAL
STREET_TYPE
AVE
City
STOCKTON
Zip
95215-
APN
15911024
ENTERED_DATE
6/30/2020 12:00:00 AM
SITE_LOCATION
731 S CARDINAL AVE
RECEIVED_DATE
6/26/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 2 - <br /> Community Development Department <br /> PA- 1900061 ( UP ) <br /> Upon satiSfaGfien of the abov-e-mquirernents , the follewing Conditions of AppFeval shall apply, <br /> RECOMMENDATIONS : <br /> 1 . The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards . Retention basins shall be fenced with six (6 ) foot high chain link fence <br /> or equal when the maximum design depth is 18 inches or more . Required retention basin <br /> capacity shall be calculated and submitted along with a drainage plan for review and approval , <br /> prior to release of building permit . ( Development Title Section 9 - 1135 ) <br /> 2 . A copy of the Final Site Plan shall be submitted prior to release of building permit . <br /> 3 . The Traffic Impact Mitigation Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee will be based on the current schedule <br /> at the time of payment . The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record . <br /> ( Resolutions R - 00 -433 ) <br /> 4 . The Regional Transportation Impact Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee will be based on the current schedule <br /> at the time of payment . ( Resolution R - 06 - 38 ) <br /> 5 . The Water Supply Facilities Impact Mitigation Fee shall be required for this development . The <br /> fee is due and payable prior to issuance of the building permit . The fee will be based on the <br /> current schedule at the time of payment . ( Development Title Section 9 - 818 . 4 and Resolutions R - <br /> 91 - 327 , R - 94 - 185 and R - 97 - 5 . <br /> 6 . The owner shall execute an Irrevocable Offer to Dedicate Road to result in a forty -two (42 ) foot <br /> wide right- of-way from the centerline of Cardinal Avenue to the property line across the parcel ' s <br /> frontage . (A fee based on the current fee schedule is required for processing per Development <br /> Title Table 9 - 240 . 2 in addition to a copy of the Grant Deed and a legal description of the parcel to <br /> be offered for dedication . ) ( Development Title Section 9 - 1150 . 5 ) <br /> 7 . This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase I National Pollutant Discharge Elimination <br /> System ( NPDES ) permit and shall comply with the following conditions : <br /> a . A registered professional engineer shall design a system or combination of systems to treat , <br /> filter or infiltrate the 85th percentile storm as defined in the County ' s Post- Construction 2009 <br /> SWQCCP . The system design shall follow standards as outlined in the 2009 Storm Water <br /> Quality Control Criteria Plan and comply with the conditions of the County Phase I NPDES <br /> permit . Plans and /or calculations of the proposed system shall be submitted to the County for <br /> review and approval prior to clearance for plan check . <br /> b . All Priority New Development and Significant Redevelopment Projects must meet the <br /> volume reduction requirement outlined in the County ' s SWQCCP . <br /> 2of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.