My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013457
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARDINAL
>
731
>
2600 - Land Use Program
>
PA-1900061
>
SU0013457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 8:32:27 AM
Creation date
10/28/2020 8:30:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013457
PE
2626
FACILITY_NAME
PA-1900061
STREET_NUMBER
731
Direction
S
STREET_NAME
CARDINAL
STREET_TYPE
AVE
City
STOCKTON
Zip
95215-
APN
15911024
ENTERED_DATE
6/30/2020 12:00:00 AM
SITE_LOCATION
731 S CARDINAL AVE
RECEIVED_DATE
6/26/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 3 - <br /> Community Development Department <br /> PA- 1900061 ( UP ) <br /> c . Applicant shall submit a " Storm Water Pollution Prevention Plan " ( SWPPP ) to Public Works <br /> for review . A SWPPP preparation guide is available at the Department of Public Works ._ A <br /> copy of the approved SWPPP and all required records , updates , test results and inspection <br /> reports shall be maintained on the construction site and be available for review upon <br /> request . The post construction chapter of the SWPPP must identify expected pollutants <br /> and how they will be prevented from entering the storm system . The chapter shall also <br /> contain a maintenance plan , a spill plan , and a training plan for all employees on proper <br /> use , handling and disposal of potential pollutants . <br /> d . Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system . The property owner shall also be responsible for the payment <br /> to the County of an annual system inspection fee established by Resolution of the Board of <br /> Supervisors . <br /> e . A Maintenance Plan shall be submitted and the execution of a Maintenance Agreement with <br /> San Joaquin County will be required for the owner/operator of stormwater controls prior to the <br /> release of the building permit . <br /> f . Standard Best management Practices for the type of development proposed shall be <br /> incorporated into the site storm drainage design . <br /> AC : CH <br /> 3of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.