My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1995- 2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1333
>
4400 - Solid Waste Program
>
PR0440009
>
CORRESPONDENCE_1995- 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 2:45:18 PM
Creation date
11/2/2020 9:50:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1995- 2001
RECORD_ID
PR0440009
PE
4445
FACILITY_ID
FA0000428
FACILITY_NAME
CENTRAL VALLEY WASTE SERVICES
STREET_NUMBER
1333
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
MULTIPLE APNS - SEE COMMENTS
CURRENT_STATUS
01
SITE_LOCATION
1333 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t t � • <br /> Californts <br /> removel ty.stemi <br /> August 5, 1994 <br /> Mr. Edward Padilla <br /> Environmental Health Specialist <br /> Public Health Services - San Joaquin County <br /> P.O. Box 388 <br /> Stockton, California 95201-0388 <br /> Dear Mr. Padilla: <br /> am writing this letter to sumrnarize some of the issues we dealt with on our <br /> meeting of August 1 . <br /> 1 . Temperature Readinos <br /> In order to effectively reduce pathogen levels (Section 17887), CWRS <br /> will monitor and record temperatures of the active compost seven (7) <br /> days per week during the peak season, from roughly July 15th through <br /> September 15th. The remainder of the year, CWRS will monitor <br /> temperatures during normal workdays - 5 days per week. However, in <br /> December, in order to test the ability of the windrows to sustain <br /> temperatures above 55 degrees Celsius in the coldest months, we will <br /> take temperature readings for a 15 consecutive day period. If the <br /> temperature of the compost remains above the 55 degree C limit, we <br /> will continue the practice of rneasuring temperatures 5 days/week until <br /> July 15th. <br /> 2. Metals Analysis <br /> As per Section 17887(a)(1 )(A) CWRS will take one composite sample <br /> of finished compost per 5,000 cubic yards produced and have it <br /> analyzed for the 10 metals listed in Table 1 of the above-referenced <br /> section. Based on our annual compost production of approximately <br /> 20,000 cubic yards, the metals analysis will be performed quarterly. <br /> You will be receiving the most recent test results within the next week. <br /> A tentative schedule for future metals testing is as follows: <br /> October '15, 1994 <br /> January 15, 1995 <br /> 1333 E.TURNER ROAD P.O. BOX 241001 LODI,CALIFORNIA 95241-9501 (209) 369-8274 <br /> 9900 KENT STREET ELK GROVE,CALIFORNIA 95624-9400 (916)685.4061 <br /> Printed On Recycled Poper 3``O% <br /> 4 �N <br /> ICCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.