Laserfiche WebLink
Log:, of att., OVieikand. Amendments ePik'i . . ..: . . . , . <br />Non-Technical Amendments <br />Non-technical amendments are not certified by a Professional Engineer. <br />Examples of changes include, but are not limited to, phone numbers, name changes, or any non- <br />technical text change(s). <br />Technical Amendments <br />Technical amendments are certified by a Professional Engineer (§112.5(c)). <br />Examples of changes include, but are not limited to, commissioning or decommissioning containers; <br />replacement, reconstruction, or movement of containers; reconstruction, replacements, or installation of <br />piping systems; construction or demolition that might alter secondary containment structures; changes of <br />product or service; or addition/deletion of standard operation or maintenance procedures related to <br />discharge prevention measures. It is the responsibility of the facility to determine, and confirm with the <br />regulatory authority as necessary, what constitutes a technical amendment. The preamble of the rule <br />states that an amendment is required only "when there is a change that materially affects the facility's <br />potential to discharge oil" (67 FR 47091). <br />An amendment made under this section will be prepared within six (6) months of the change and <br />implemented as soon as possible but not later than six (6) months following preparation of the <br />amendment. <br />Technical Amendments affecting various pages within the plan can be RE. certified on those pages, <br />certifying those amendments only, and will be documented on the log form below. <br />Management Review <br />Management will review this SPCC Plan at least each five (5) years and document the review on the form <br />below (§112.5(b)). <br />Review/Amend <br />Date <br />Signature <br />(Specify) <br />Amend <br />Plan <br />(will/will <br />not) <br />Description of <br />Review <br />Amendment <br />AffectedP.E. <br />Page(s) <br />Certification <br />(YIN) <br />2/14/2014 f will insp by D.K. Barber All Y <br />1 / 1, 1 2"401q ' <br />, <br />ke I. fl fN.S i'y . ../t/ 1,4 <br />12/16/2020 -- ---r will Inspection schedule iv, v, 5, Y <br />12, 17, <br />18, 19, <br />App B <br />— <br />• <br />2ta KR1;:ikA(;), KANT