Laserfiche WebLink
Table of Contents <br />Page <br />1.0 Introduction and Applicability - 40 CFR 112.1(d) 1 <br />2.0 General Facility Information & Contacts 3 <br />3.0 Schedule for Implementation -40 CFR 112.3(a) 5 <br />4.0 Amendments to Plan by Regional Administrator -40 CFR 112.4 5 <br />5.0 Amendments to Plan by Owner -40 CFR 112.5 5 <br />6.0 Overview of Facility Oil Storage - 40 CFR 112.7(a)(3) 6 <br />6.1 Discharge Management- 40 CFR 112.7(a)(3) 6 <br />6.2 Prediction of Spill Characteristics - 40 CFR 112.7(b) 10 <br />6.3 Containment and/or Diversionary Structures or Equipment- 40 CFR 112.7(c) 12 <br />7.0 Oil Spill Contingency Plan -40 CFR 112.7(d) 12 <br />8.0 Inspections and Records -40 CFR 112.7(e) 12 <br />9.0 Personnel Training and Spill Prevention Procedures -40 CFR 112.7(f) 13 <br />10.0 Security - 40 CFR 112.7(g) 14 <br />11.0 Facility Loading/Unloading Rack - 40 CFR 112.7(h) 14 <br />12.0 Brittle Fracture Evaluation -40 CFR 112.7(i) 14 <br />13.0 Conformance with State and Local Applicable Requirements-40 CFR 112.7(j) 14 <br />14.0 Facility Drainage -40 CFR 112.8(b) and 112.8(c)(3) 15 <br />14.1 General Facility Drainage 15 <br />14.2 Drainage from Containment Areas 15 <br />15.0 Bulk Storage Containers -40 CFR 112.8(c) 16 <br />15.1 Tank Design and Overview 16 <br />15.2 Secondary Containment 16 <br />15.3 Buried Storage Tanks 16 <br />15.4 Integrity Testing 17 <br />15.5 Internal Heating Coils 19 <br />15.6 Overfill Prevention 19 <br />15.7 Observation of Disposal Facilities for Effluent Discharge 20 <br />15.8 Visible Oil Leak Corrections from Tank Seams and Gaskets 20 <br />15.9 Mobile or Portable Oil Storage Containers 20 <br />16.0 Facility Transfer Operations -40 CFR 112.8(d) 20 <br />Appendices <br />CERTIFICATION OF THE APPLICABILITY OF THE SUBSTANTIAL HARM CRITERIA <br />MONTHLY INSPECTION CHECKLISTS <br />INCIDENT REPORT <br />SPILL RESPONSE DUTY CARD OIL HANDLING EMPLOYEES <br />SPILL RESPONSE DUTY CARD INCIDENT COMMANDER <br />UNLOADING TANK TRUCKS TO ABOVEGROUND STORAGE TANKS <br />G CERTIFIED INSPECTOR REPORTS <br />Tables Page <br />SUMMARY OF OIL STORAGE 6 <br />POTENTIAL SPILL SCENARIOS 11 <br />TANK INTEGRITY TESTING PROGRAM 16 <br />Figures Follows Page <br />SITE LOCATION MAP 2 <br />SITE PLAN 2 <br />1,1,1 i li