Laserfiche WebLink
Table 3A <br />TANK INTEGRITY TESTING PROGRAM- SCOPE & FREQUENCY <br />KRC TRACY PLANT <br />Inspection/ <br />T est <br />#1 2 <br />, ,L.' 4. 4 <br />#3 <br />Tank Volume Volume (GA) I 10,000 500 Est. 200 GA <br />Tank Type Horz Tnk <br />UL 2085 <br />Harz Tnk UL 2085 <br />Rectangular <br />Utility Co Elect <br />Transformer <br />Contents Diesel Diesel Off Highway Heat Transfer <br />CRDM Sides, Base <br />Seepage <br />Sides, Base <br />Seepage <br />Sides, Base <br />Seepage <br />RFS AST design and <br />PCC footing <br />AST design and <br />PCC footing <br />Concrete Pad <br />STI Category Category 1 Category 1 Category 1 <br />Visual inspection by facility personnel (as <br />per checklist App B) <br />M <br />A <br />M <br />A <br />M <br />A <br />External inspection by certified inspector (as <br />per STI Std SP-001) <br />20yr* N/A N/A <br />Tank tightness test <br />meeting req'ts of <br />40 CFR 280 (USTs) <br />n/a n/a n/a <br />Legend: <br />CRDM: Continuous Release Detection Method <br />RPB: Release Prevention Barrier <br />M: Monthly Q: Quarterly <br />A: Annual <br />Or earlier as recommended by certified inspector <br />based on findings from external inspection