Laserfiche WebLink
ip= SAN a-JOAQUIN <br />C0L'!NTY <br />Environmental Health Department <br />Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: <br />CONCRETE INC <br />Facility Phone: <br />(209) 839-4169 <br />Date: <br />November 17, 2020 <br />Facility Address: <br />1728 LINNE RD, TRACY, CA 95376 <br />CERS ID: <br />10182761 <br />Inspection Contact: <br />Rudy Belmonte <br />Title: <br />Batchman <br />Phone: <br />(209) 839-4169 <br />Inspection Type: <br />ROUTINE INSPECTION - Operating Permit 12832-ASTFAC <br />Program: <br />10 K - </=100 K GAL CUMULATIVE <br />Consent For: <br />❑x Ins ection ❑x Photos ❑ Sam les <br />Consent Given By: <br />I Rudy Belmonte, Batchman <br />CCR = California Code of Regulations HSC = Health and Safety Code CFR = Title 40 Code of Federal Regulations <br />V = Violation R = Repeat violation COS = Corrected on site during inspection <br />Aboveground Petroleum Storage Act <br />101 <br />HSC 25270.6(b) <br />Failed to pay APSA program annual fees <br />o V o R o COS <br />102 <br />HSC 25270.4.5(a) <br />Failed to prepare a written SPCC Plan in accordance with CFR Part 112 <br />c V o R o COS <br />103 <br />HSC 25270.6(a) <br />Failed to file HMBP or annual facility tank statement <br />a V o R o COS <br />104 <br />HSC 25270.8 <br />Failed to report spills or releases of 42 gallons (one barrel) or more <br />o V o R o COS <br />105 <br />CFR 112.1(b)(3), 112.2 <br />Failure to properly close tanks when making a claim of permanently closed <br />o V o R o COS <br />106 <br />HSC 25404.1.2 <br />Failed to submit a certification and written response within 30 days for minor violations <br />o V o R o COS <br />107 <br />HSC 25270.2(a)(4) <br />Failure to prepare SPCC plan when facility no longer meets oil -filled electrical equipment exclusion <br />o V o R o COS <br />108 <br />HSC 25270.4.5(a) <br />Failure of conditionally exempt facility to conduct inspections or install secondary containment <br />o V a R o COS <br />109 <br />HSC 25270.2(o)(1)(C) <br />iv III <br />Failure to have secondary containment and/or leak detection if TIUGA piping cannot be viewed <br />o V o R a COS <br />110 <br />HSC 25404(e)(4) <br />Failed to report program data in the California Environmental Reporting System (CERS) <br />o V o R o COS <br />111 <br />HSC 25270.2(a)(8) <br />Failure of a TIUGA with less than 55 gallons capacity to have secondary containment and a log <br />o V o R c COS <br />112 <br />CFR 112.20(e) <br />Failure to complete and maintain a Substantial Harm Criteria certification <br />o V o R o COS <br />Requirement to Prepare and Implement a SPCC Plan <br />201 <br />CFR 112.3(d) <br />Failure to have a licensed PE properly review and certify the SPCC plan <br />_; V R u COS <br />202 <br />CFR 112.3(e)(1) <br />Failed to maintain a copy of the Plan on site <br />o V o R o COS <br />203 <br />CFR 112.3 <br />Failure to implement the SPCC Plan <br />o V o R o COS <br />204 <br />CFR 112.3(g) <br />Failure to prepare SPCC Plan when facility no longer meets Qualified Facility criteria <br />o V o R a COS <br />205 <br />CFR 112.3, 112.6 <br />Failure to prepare SPCC Plan that meets all applicable requirements <br />o V o R o COS <br />206 <br />CFR 112.3(d)(1) <br />Failure of owner to assure that the PE makes all required attestations in the Plan <br />n V ❑ R - COS <br />Amendment of SPCC Plan by Owners or Operators <br />301 <br />CFR 112.5(a) <br />Failed to amend Plan as necessary <br />a V o R c COS <br />302 <br />CFR 112.5(b) <br />Failed to review Plan once every five years and/or implement any resulting amendments <br />o V o R � COS <br />303 <br />CFR 112.5(c) <br />Failed to have a PE certify technical amendments <br />o V o R o COS <br />304 <br />CFR 112.5(a), 112.5(b) <br />Failure to implement SPCC plan amendments within 6 months <br />a V o R o COS <br />Qualified Facility - Tier I <br />401 CFR 112.6(a), 112.6(b) Tier I Qualified Facility Plan not certified by the owner or a PE a V o R o COS <br />402 CFR 112.6(a)(2) Owner of Tier I Qualified Facility failed to self certify technical amendment o V o R o COS <br />403 CFR 112.6(a)(3)(i) Plan failed to predict direction/rate of flow/total quantity of oil potentially discharged o V o R o COS <br />FA0009536 PRO540694 SC001 11/17/2020 <br />EHD 28-01 Rev. 9/16/2020 Page 1 of 5 Aboveground Petroleum Storage Act OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />