My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
242
>
1900 - Hazardous Materials Program
>
PR0538220
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 4:39:32 PM
Creation date
11/18/2020 12:33:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0538220
PE
1926
FACILITY_ID
FA0022089
FACILITY_NAME
DFA Medici Associates, LP
STREET_NUMBER
242
Direction
N
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13925005
CURRENT_STATUS
02
SITE_LOCATION
242 N SUTTER ST # 700
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DKD Property Management Company Personnel & Management Policies <br /> OPERATIONAL PROCEDURES MANUAL Section 615. <br /> Part I Page 6 of 7 <br /> Upon receipt of the original Safety & Hazard Inspection Report — Leased Office Space the <br /> Director of Property Management will review the report with the Regional Property Manager or <br /> Building Manager/Administrator and prioritize the repairs according to the degree of the hazard <br /> and the budget for completion. The repair(s) should be made within 15 days from the date of <br /> the inspection. Corrections of hazards in common areas not under the control of the Company <br /> should be addressed to the managing agent in writing by the Director of Property Management. <br /> Note: Correction of hazards that pose an immediate threat to the health or safety of <br /> persons or property should be corrected or eliminated immediately. The Building <br /> Manager/Administrator or Regional Property Manager should report the hazard <br /> immediately by phone to the Director of Property Management who will report the hazard <br /> to the managing agent. <br /> If there are minor deficiencies that are not an immediate threat to the health or safety of <br /> persons or property that DKD is responsible for correction of;however, must be approved by the <br /> Vice President, CFO or Vice President, COO due to the cost of repairs, email or forward a copy <br /> of the applicable page(s) of the Safety & Hazard Inspection Report — Leased Office Space to <br /> the Vice President, CFO or Vice President, COO for input and/or approval. <br /> Important: Only the Vice President, COO may defer the correction of a deficiency. <br /> Based on the discussion with the Regional Property Manager or Building <br /> Manager/Administrator, the Director of Property Management will provide instructions to: <br /> 1. Schedule and complete or assign the correction of deficiencies within 15 days from the date <br /> of the inspection, noting the date the correction is made under "RESPONSE/CORRECTIVE <br /> ACTION TAKEN" and initialing the notation. <br /> 2. Attach any documentation to the original Safety & Hazard Inspection Report— Leased Office <br /> Space once all the deficiencies have been corrected (except for any non-urgent deferred <br /> deficiencies approved by the Vice President, COO), <br /> 3. Sign and date under"REVIEWED BY". <br /> 4. Forward the original Safety & Hazard Inspection Report — Leased Office Space with <br /> attached documentation to the Vice President, COO. <br /> Corporate Approval <br /> Upon receipt of the Safety & Hazard Inspection Report — Leased Office Space, the Vice <br /> President, COO will review it with the documentation for completeness and to assure that all <br /> deficiencies have been corrected. <br /> 1. If there are any corrections to deficiencies overlooked or documentation missing, provide <br /> instruction to, or request information from the Director of Property Management or Building <br /> Manager/Administrator. <br /> 2. Initial approval for any non-urgent deficiencies deferred with your consent. <br /> 3. Sign under"CORPORATE APPROVAL BY" and insert the date. <br /> DKD OPM 1 03/01/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.