My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013726
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELLEN
>
930
>
2600 - Land Use Program
>
PA-2000180
>
SU0013726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 9:23:38 AM
Creation date
11/19/2020 2:04:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013726
PE
2625
FACILITY_NAME
PA-2000180
STREET_NUMBER
930
Direction
N
STREET_NAME
ELLEN
STREET_TYPE
ST
City
STOCKTON
Zip
95215-
APN
14328020
ENTERED_DATE
10/28/2020 12:00:00 AM
SITE_LOCATION
930 N ELLEN ST
RECEIVED_DATE
10/6/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQU ( N COMMUNITY DEVELOPMENT DEPARTMENT <br /> -- COUNTY.-___ <br /> USE PERMIT <br /> x <. FILE NwBEM2000180 <br /> Owner Information Applicant Information <br /> Name:ELLEN STREET INVESTMENTS Name: Mike Smith Engineering, Inc. <br /> Mailing Address: 7633 Southfront Rd., Suite 160 Mailing Address: P.O. Box 611 <br /> Livermore, CA 94551 Lodi, CA 95241 <br /> Phone: 925-447-0292 Phone: 209-334-2332 <br /> Email: smazza@gseconstruction.com Email: mike@mseng.comcastbiz.net <br /> Project Description <br /> (Attach additional sheets as necessary) <br /> Phase project for Office, Maintenance, and Storage Yard for construction co. <br /> 900 SF roof cover for equipment and material storage. <br /> Project includes paving existing gravel surface, striping new parking spaces,and construction storm drain pond. <br /> This Phase to begin immediately <br /> Phase II 7,050 SF two storey office, Fabrication Shop, Storage Building. <br /> Project includes new paved surface&nNew parking spaces. <br /> This phase to begin within 5 years. <br /> Fabrication Shop Description: <br /> Build and assemble equipment and utilities to be used in waste water treatment construction projects. <br /> All non-combustible construction. <br /> Includes cutting and welding <br /> Will the project include more than one(1)phase?(maximum of 2 phases)Yes H No❑ <br /> Length of time(maximum of 5 years): 5 Years <br /> Note:For questions regarding phasing, contact the Planning Division at 209-468-3121. 11 <br /> Property Information <br /> Assessor Parcel Number Property Address Property Williamson Act Contract(Y or N) <br /> Size <br /> 143-280-20 930 Ellen St., Stockton 2.05 Ac No <br /> Page 1 of 6 <br /> Updated 0512712020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.