ROOM FINISH SCHEDULE 4 3 2 THROUGHOUT LIFE OF CONSTRUCTION,
<br /> MAINTAIN REQUIRED EGRESS WIDTH AND
<br /> ROOM FLOOR BASE TYPICAL SUBSTRATES FINISHES CEILING PROVIDE DEBRIS BARRIERS TO PROTECT
<br /> CUSTOMERS. --
<br /> NUMBER ROOM NAME FINISH FINISH 1 2 3 4 1 2 3 4 FINISH COMMENTS •
<br /> 100 PREP ROOM FT-3 BT-7 PER PLAN PER PLAN PER PLAN PER PLAN FRP-1 FRP-1 FRP-1 FRP-1 ACT-2 SCHEDULED FINISH
<br /> AND AND AND AND
<br /> PARTITION PARTITION PARTITION PARTITION 1/2" GYP. BD. OR PLYWOOD
<br /> NOTES ON NOTES ON NOTES ON NOTES ON ABOVE CEMENT BOARD
<br /> G003 G003 G003 G003 PROVIDE AT FOOD PREP ONLY:
<br /> 101 WALK-IN FT-3 BT-7 NONE NONE NONE NONE FACTORY FACTORY FACTORY FACTORY FACTORY COOLER PANELS PROVIDED AND 1/2" CONCRETE BACKER Architect of Record:
<br /> COOLER INSTALLED BY BOX MANUFACTURER BOARD 12" HIGH AROUND Mariah B.Meyer
<br /> INTERIOR SIDE OF ALL WALLS. 8131 Metcalf Avenue
<br /> Suite 300
<br /> SECURE WITH1-1 2" Overland Park,KS 66204
<br /> GALVANIZED R00 ING NAILS. www.brrarch.com
<br /> 102 WALK-IN FT-3 BT-7 NONE NONE NONE NONE FACTORY FACTORY FACTORY FACTORY FACTORY FREEZER PANELS PROVIDED AND TAPE JOINT TO GYPSUM
<br /> BOARD OR PLYWOOD Tel:913-262-9095
<br /> FREEZER INSTALLED BY BOX MANUFACTURER Fax:913-262-9044
<br /> SEALANT
<br /> 103 SALES QT-1 BS-1 1/2" GYP 1/2" GYP 1/2" GYP 1/2" GYP REF PLAN REF PLAN REF PLAN REF PLAN FV TO MATCH
<br /> BD BD BD BD EXISTING
<br /> ADJACENT TILE PER w wzFINISH PLAN
<br /> oSALES FINISHES U zwo a
<br /> COORDINATE w o°��W1Wo °z Z
<br /> w—2 U w W w�w
<br /> COLOR MATCH
<br /> WITH LOVE'S PM c° o WWIEa�°TWO oEz
<br /> CUSTOMER aF-�-~0 U
<br /> O � ZQf.7HU��w >
<br /> „ „ „ „ i i i i i LL a n nZoi-zo>wW��a
<br /> 104 CUSTOMER QT-1 BS-1 1/2" GYP 1/2" GYP 1/2" GYP 1/2" GYP LM-1/PT-3 LM-1/PT-3 LM-1/PT-3 LM-1/PT-3 ACT-2 PLASTIC LAMINATE TO 4'-0" GYP. BD. LAUNDRY z >a 2 o-c%,<�E a W z"o.o
<br /> LAUNDRY BD BD BD BD PAINT ABOVE PT-3, INSTALL LAMINATE O >U Z N o Z U U w w Z
<br /> c�wa��woOw-�c�oa
<br /> HORIZONTALLY, BATT INSULATION IN ALL 104 z a o o w=J w z o
<br /> WALLS FROM SLAB TO ROOF DECK _j a a a w M w LU O a N a
<br /> QT-1 w 0owocow<w w�wow
<br /> PER PLAN PER PLAN PER PLAN PER PLAN PT-10 89 SF o w z, o w w X::)w z 0 0 0
<br /> 105 SHOWER CT-l/ BS-1 PER ELEVS PER ELEVS PER ELEVS PER ELEVS PT-4 SOUND BATT INSULATE WALLS, REFER TO O c i °o a o a a a DO
<br /> CT-2 AND AND AND AND FINISH PLAN, REFLECTED CEILING PLAN
<br /> PARTITION PARTITION PARTITION PARTITION AND INTERIOR ELEVATIONS FOR FLOOR, ALIGN TO MATCH BASE D
<br /> NOTES ON NOTES ON NOTES ON NOTES ON BASE, WALL, AND CEILING FINISH EXISTING PATTERN
<br /> G003 G003 G003 G003 CONSULTANT LOGO
<br /> 106 SHOWER CT-1/ BS-1 PER PLAN PER PLAN PER PLAN PER PLAN PER ELEVS PER ELEVS PER ELEVS PER ELEVS PT-4 SOUND BATT INSULATE WALLS, REFER TO I I 1 1 7 3" = 1' 0"
<br /> CT-2 AND AND AND AND FINISH PLAN, REFLECTED CEILING PLAN tt/1 , 7
<br /> PARTITION PARTITION PARTITION PARTITION AND INTERIOR ELEVATIONS FOR FLOOR,
<br /> NOTES ON NOTES ON NOTES ON NOTES ON BASE, WALL, AND CEILING FINISH PATCH AND REPAIR
<br /> 0003 G003 G003 G003 TO MATCH EXISTING
<br /> 107 SHOWER CT-l/ BS-1 PER PLAN PER PLAN PER PLAN PER PLAN PER ELEVS PER ELEVS PER ELEVS PER ELEVS PT-4 SOUND BATT INSULATE WALLS, REFER TO FINISH FLOOR.
<br /> CT-2 AND AND AND AND FINISH PLAN, REFLECTED CEILING PLAN
<br /> PARTITION PARTITION PARTITION PARTITION AND INTERIOR ELEVATIONS FOR FLOOR, D
<br /> NOTES ON NOTES ON NOTES ON NOTES ON BASE, WALL, AND CEILING FINISH S OW R
<br /> G003 G003 G003 G003
<br /> 108 SHOWER CT-l/ BS-1 PER PLAN PER PLAN PER PLAN PER PLAN PER ELEVS PER ELEVS PER ELEVS PER ELEVS PT-4 SOUND BATT INSULATE WALLS, REFER TO CU S ER LAUNDRY PLAN 109 T
<br /> CT-2 AND AND AND AND FINISH PLAN, REFLECTED CEILING PLAN 6 _ 21 SF
<br /> ---
<br /> PARTITION /4" = 1'-0"
<br /> PARTITION PARTITION PARTITION PARTITION AND INTERIOR ELEVATIONS FOR FLOOR, 2 S
<br /> NOTES ON NOTES ON NOTES ON NOTES ON BASE, WALL, AND CEILING FINISH
<br /> G003 G003 G003 G003 w
<br /> 109 SHOWER CT-1/ BS-1 PER PLAN PER PLAN PER PLAN PER PLAN PER ELEVS PER ELEVS PER ELEVS PER ELEVS PT-4 SOUND BATT INSULATE WALLS, REFER TO (D O
<br /> CT-2 AND AND AND AND FINISH PLAN, REFLECTED CEILING PLAN o Q
<br /> PARTITION PARTITION PARTITION PARTITION AND INTERIOR ELEVATIONS FOR FLOOR, U v
<br /> NOTES ON NOTES ON NOTES ON NOTES ON BASE, WALL, AND CEILING FINISH a o
<br /> G003 G003 G003 G003 LULU
<br /> 110 STORAGE QT-1 BS-1 1/2" GYP 1/2" GYP 1/2" GYP 1/2" GYP PT-7 PT-7 PT-7 PT-7 NONE PLYWOOD TO RUN FROM FLOOR TO 12'-0" p SHOW R _
<br /> U)
<br /> BD OVER BD OVER BD OVER BD OVER 108 T— Q cn w
<br /> 1/2 1/2 1/2 1/2 17 SF
<br /> w ❑
<br /> PLYWOOD PLYWOOD PLYWOOD PLYWOOD Q M w w
<br /> 2 S r , N lii w
<br /> 111 DIESEL DESK QT-1 BS-1 1/2" GYP 1/2" GYP 1/2" GYP 1/2" GYP PT-10 PT-10 PT-10 PT-10 ACT-1 SEE INTERIOR ELEVATIONS FOR WALL v N o
<br /> BD BD BD BD FINISHES AND MILLWORK
<br /> STORE DIESEL z O o
<br /> (D—
<br /> LAUNDRY -DESK----
<br /> w z w ~
<br /> 00
<br /> 0 S OWER 0 aQ
<br /> 112 . 111
<br /> 112 STORE EP-1 BS-1 1/2" GYP 1/2" GYP 1/2" GYP 1/2" GYP PT-7 PT-7 PT-7 PT-7 NONE PLYWOOD TO RUN FROM FLOOR TO 9'-0" 107 T-
<br /> LAUNDRY BD OVER BD OVER BD OVER BD OVER . EP-1 QT-1 PT-10 _ 17 SF N
<br /> 1/2" 1/2" 1/2" 1/2" I 157 .SF 245 SF o
<br /> PLYWOOD PLYWOOD PLYWOOD PLYWOOD 2 S 0
<br /> M
<br /> MATERIAL LEGEND - INTERIOR TILE TRANSITION
<br /> MARK DESCRIPTION MODEL COMMENTS PT-10 S OW R m
<br /> CT-1 SUSPENDED ACOUSTIC CEILING "ARMSTRONG" FISSURED MINABOARD #7556, 24"x48", WHITE GRID. 106 T-
<br /> CT-2 SUSPENDED VINYL CEILING "ARMSTRONG" CLEAN ROOM #870, 24"x48"x5/8" OR, WHITE VINYL COVERED _ 17 SF Z
<br /> 5/8" GYP. BD. ON WHITE GRID. _ p O
<br /> S-1 RUBBER BASE "ROPPE" BLACK - (4") 2 S
<br /> T-7 COVED BASE EQ. TO FT-3, COVED BASE TILE 6"x6" - OQ76 GREY
<br /> P-1 EPDXY SIKADUR 55 SLV RE: SPECS ALIGN TO MATCH
<br /> RP-1 FRP "MARLITE ", P151 LIGHT GREY, 1/8" FIBERGLASS REINFORCED PANELS. BATTEN EXISTING PATTERN ISSUE BLOCK
<br /> JOINTS. DO NOT PAINT WALL BEHIND FRP T- NO. DATE DESCRIPTION
<br /> T-3 SURFACE-TREAD DALTILE -6"x6" SURETREAT, OQ76 GREY AT WALK-IN COOLER; GROUT: MAPEI "BLACK" 17 SF--
<br /> M-1 LAMINATE FORMICA "NEUTRAL TWILL" 8826-58 SUPPLIED BY MILLWORK CONTRACTOR; INSTALLED BY GENERAL CONTRACTOR; STORAGE 105 1111111
<br /> N WOOD TOP TRIM. MATCHING CORNER, END PIECES, & ACCESSORIES TO MAKE 110
<br /> `�' COMPLETE SYSTEM. INSTALLERS SHALL USE APPROVED ADHESIVE - "TITEBOND CT-1
<br /> cn GREENCHOICE ADVANCED POLYMER PANEL ADHESIVE. DO NOT PAINT WALL QT-1 7 S
<br /> Q BEHIND LAMINATE 111 SF C
<br /> I-LLJ T-1 QUARRY TILE SUMMITVILLE , STRATA 2, #54 DRIFTWOOD, 6'x6 - F-113-90 DRY SET
<br /> o MORTAR METHOD, "HYDROMENT" NATURAL FLOOR GROUT, WITH HYDROMENT
<br /> o ACRYLIC MORTAR ADMIXTURE. PROVIDE "HYDROMENT" ULTRASET AT SLAB WOMEN'S
<br /> Q JOINTS PER DETAIL 3 A141 RESTROOM
<br /> T-1 CERAMIC FLOOR TILE "DAL TILE" TRAVATA TOASTED ALMOND TV91 18x18 SIZE TILE ON FLOOR (MAPEI GREY#2 GROUT) FLOOR PATTERN - BRICK ALIGN TO MATCH
<br /> w EXISTING PATTERN 113
<br /> J
<br /> D T-2 PORCELAIN MOSAIC FLOOR "DAL TILE" CONTINENTAL SLATE, MOROCCAN BROWN CS55 - 3"x3" BULLNOSE TRIM S-43C9 3"-12" SHOWER CURB
<br /> o TILE
<br /> T-3 CERAMIC WALL TILE "DAL TILE" TRAVATA TOASTED ALMOND TV91 13"x13" SIZE TILE ON WALLS (MAPEI NAVAJO BROWN 35-GROUT) PER - __
<br /> Un INTERIOR ELEVATIONS ~ CHECKED BY: PDB
<br /> T-4 CERAMIC WALL TILE DAL TILE 6x6 MATTE ARTISAN BROWN 0744. MAPEI GROUT, COLOR DRAWN BY: NC
<br /> Q "NAVAJO BROWN 35"
<br /> ___j
<br /> w T-2 PAINT SHERWIN WILLIAMS SW 7016 "MINDFUL GRAY" - OR PPG1007-3 "GHOST DIESEL DESK /STORAGE PLAN- SH0WER PLAN DOCUMENT DATE: 09/01/20
<br /> WRITER"
<br /> Cn T-3 PAINT SHERWIN WILLIAMS SW 9168 "ELEPHANT EAR" - SATIN OR PPG CUSTOM 54 PROTO TYPE: REMODEL
<br /> COLOR MATCH TO SW 9168 1/4 = 1'-0 1/4' = 1'-0"
<br /> T-4 PAINT SHERWIN WILLIAMS SW 7690 "TOWNHALL TAN"
<br /> PROTO CYCLE: 2020 QUARTER 1
<br /> Q T-7 PAINT SHERWIN WILLIAMS SW 7567 "NATURAL TAN" LATEX OR PPG1075-3 "CASUAL ELEGANCE" _
<br /> T-8 PAINT SHERWIN WILLIAMS SW 7750 "WHEAT PENNY" SALES FLOOR SOFFIT
<br /> T-9 PAINT SHERWIN WILLIAMS SW 1128 "URBAN PUTTY" LATEX I PROFESSIONAL SEAL
<br /> T-10 PAINT SHERWIN WILLIAMS SW 6114 "BAGEL"
<br /> T-11 PAINT SHERWIN WILLIAMS SEMI GLOSS SW 7040 "SMOKEHOUSE" PATCH AND REPAIR
<br /> TO MATCH EXISTING
<br /> S-5 SOLID SURFACE DUPONT - CORIAN - "SONORA" VANITY AND BENCH BASES TO BE PLYWOOD LAMINATED "STUDIO TEAK"Cn FINISH FLOOR.
<br /> Q R-3 SCHLUTER TRIM "SCHLUTER" TRIM - RENO RAMP - AERP 125 B65 - ANODIZED ALUMINUM, SATIN/ MAT MATCHING, CORNER, END PIECES, & ACCESSORIES TO MAKE A COMPLETE SYSTEM PREP WALK—IN WALK—IN GSC
<br /> o D-1 WOOD RED OAK DARK WALNUT FINISH BY MILLWORK CONTRACTOR I I I ' I I I I I ' ' '
<br /> T-1 WALL TILE "DAL TILE" #K-111 GLOSS BLACK, 4 1/4"x 4 1/4" F113-90 DRY SET MORTAR METHOD, ROOM COOLER FREEZER •7 MALAR
<br /> WITH LED HYDROMENT ACRYLIC MORTAR ADMIXTURE ON SUBSTRATE PER SCHEDULE. 100 101 102 MEYER
<br /> TAUPE COLORED GROUT
<br /> C 440
<br /> O 20�
<br /> N -LAM PLASTIC LAMINATE "WILSONART" #D50-6 KHAKI BROWN, WALL PANEL SYSTEM ON WOOD FRAMING. FRAMING BY MILLWORK CONTRACTOR FT-3 FT-3 FT-3
<br /> L o 2 BY G.C., WALL PANEL SYSTEM BY OWNER 221 SF 157 SF 160 SF S'
<br /> " Q 2
<br /> � �
<br /> N EXISTING TILE, AT ALIGN TILE JOINT WITH SAWN SCHEDULED PAVERS
<br /> N SIM EP-1 OR KEYED FLOOR SLAB JOINT
<br /> � TR-3 HYDROMENT ULTRA-SET
<br /> Cn Q 0 ALIGN TO MATCH
<br /> GROUT VOIDS SOLID EXISTING PATTERN
<br /> -dtl - ° n.d - '•s -
<br /> C �° d a
<br /> M Q _ -_ _ - _ -_ _ _ - _ FINISH PLANS SCHEDULES
<br /> ° I-1II-1I1=1 1=1I1=1I1=1I1=1I1=1I1=1 I-1I1=1I1=1II-1II-1II-1 I-1I =— _
<br /> Cn 777III—III=III=III=III=III = — _ = SAWN OR KEYED AND DETAILS
<br /> o > a a Q a ° i 1,-0„ 1,-0„ CONCRETE FLOOR
<br /> N > SLAB JOINT
<br /> DETAIL.Ir Ir lir
<br /> FRESH KITCHEN ADDITION
<br /> TILE TRANSITION TI LE EXPANSION JOINT 1 1/4„ = 1,-0„ SHEET:
<br /> N "a)
<br /> O >
<br /> 0- -1 3 12 = 1 0 1 1/2 = 1 -0 A1 41
<br /> z
<br /> Copyright Notice:Th's dm,,g was prepared for use on a spectt site contemporaneousN w'th
<br /> BRR Original printed on recycled paper is issue date and t is not suitable for use on a different project site or at a later rine.use of the
<br /> tl m"`g for and
<br /> o ampE on another projed requ'res the servtes of property frensetl
<br /> architects and eng'neerse Reproduction of this draw'ng for reuse on another project's not
<br />
|