My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
1600 - Food Program
>
PR0517445
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2023 11:37:32 AM
Creation date
12/2/2020 4:01:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0517445
PE
1625
FACILITY_ID
FA0013430
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24517054
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYMBOL MATERIAL DESCRIPTION <br /> "DRYVIT" OUTULATION SYNTHETIC PLASTER WALL SYSTEM ON 2 1/8" "DRYVIT" <br /> OA EIFS INSULATION BOARD. "AMARILLO WHITE"#113 QUARTZPUTZ FINISH. FIELD VERIFY <br /> TO MATCH EXISTING ADJACENT EIFS, COORDINATE COLOR MATCH WITH LOVE'S <br /> PROJECT MANAGER <br /> © PAINT METAL COPING, FIELD VERIFY TO MATCH EXISTING ADJACENT COPING. <br /> COORDINATE COLOR MATCH WITH LOVE'S PROJECT MANAGER. <br /> Architect of Record: <br /> N1 NICHIHA STONE VENEER "NICHIHA"VINTANGE BRICK, COLOR: "ALEXANDRIA BLUFF" Mariah B.Meyer <br /> 8131 Metcalf Avenue <br /> Suite 300 <br /> Overland Park,KS 66204 <br /> N2 NICHIHA STONE VENEER "NICHIHA" KURASTONE, DESERT www.brrarch.com <br /> Tel:913-262-9095 <br /> Fax:913-262-9044 <br /> © EXTERIOR LIGHTING RE: ELECTRICAL <br /> UJ <br /> NOTES: uwi � N Z LL'z �� � <br /> 1. PREPARE ALL SURFACES TO BE PAINTED AS PER MANUFACTURERS w o 0 U Uj 2 W o w o <br /> RECOMMENDATIONS. W_ p W W 0W !0 z z <br /> � CC�FZt'li WWdW2Up p <br /> QF—ln�F�d'OU�W Hp <br /> 2. PAINT NEW DOOR AND WINDOW FRAMES TO MATCH NEW SCHEME. oo W W a_i°W a o D O m <br /> COORDINATE WITH LOVE'S PROJECT MANAGER. LL <br /> 3. PAINT NEW TRIM, DOWNSPOUTS,AND GUTTER TO MATCH NEW Z ¢LL o a ¢w z 5,6 o v o <br /> SCHEME. COORDINATE WITH LOVE'S PROJECT MANAGER. 0 (,w a N °o o W 0,0 o a <br /> Q <br /> Z-0-of N o 0)Wp mi <br /> H. z Z a <br /> J aaaXZmZ�HH 2 w XC7¢w N< <br /> EXISTING FINISHES AND MATERIALS TO REMAIN SHOWN GREY, UNLESS NOTED °z w o W W o 0 0 o= <br /> OTHERWISE. c!1 r�00==iaZ)oWaaraa° <br /> NEW FINISHES AND MATERIALS SHOWN DARK <br /> CONSULTANT LOGO <br /> Q <br /> _ I _ <br /> B OVERFLOW `� B < OVERFLOW <br /> a Q Q <br /> A N SCUPPER A I SCUPPER <br /> A <br /> PANAFLEX PANAFLEX 7T <br /> BACKLITE FASCIA -------------------- BACKLITE FASCIA PANAFLEX <br /> ---- BACKLITE FASCIA �----------------- - W <br /> OZ <br /> • OO <br /> � Q <br /> U) U <br /> a0 <br /> LU <br /> A � d Y <br /> w <br /> O O A D = LU <br /> A A <br /> U) LU <br /> / J <br /> co w <br /> O <br /> OA N2 N o <br /> H <br /> N2 N2 0 <br /> � z <br /> 7 UO <br /> N1 N1 O Z z 00 <br /> N1N1 O � d Q <br /> 17O o <br /> N <br /> N <br /> O <br /> 5-A132 4-A132 N <br /> M <br /> (0 <br /> L7�0` 7__LE T T T T <br /> W <br /> I I I m <br /> I I I <br /> ----------------------------------- - ------------------------------------------ EQ EQ ----------------------- <br /> r - -- 4------------------ Z <br /> I I <br /> -----------------------------------L---------------------------------------------- ---1------------------ I----------------------- m0 <br /> NORTH ELEVATION NORTH ELEVATION ISSUE BLOCK <br /> NO. DATE DESCRIPTION <br /> 5 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" <br /> +s <br /> rri <br /> N <br /> N <br /> I <br /> Cn <br /> z <br /> O <br /> g CHECKED BY: PDB <br /> w _ <br /> w B B l i r i DRAWN BY: NC <br /> ch Q Q a <br /> O A r7 A DOCUMENT DATE: 09/01/20 <br /> w A PROTO TYPE: REMODEL <br /> w <br /> -- ------------ <br /> w PANAFLEX -------------- --- PANAFLEX PROTO CYCLE: 2020 QUARTER 1 <br /> BACKLITE ASCIA PANAFLEX <br /> FD <br /> BACKLITE FASCIA BACKLITE FASCIA <br /> Q <br /> I <br /> PROFESSIONAL SEAL <br /> 0 <br /> A <br /> Q) _ <br /> Q — A A <br /> EJD <br /> c� <br /> Q <br /> r <br /> J MAa M �► <br /> MEYER <br /> o ADJACENT * 440 <br /> N COOLER BOX 12021 <br /> ° N N1 N1 <br /> C � <br /> 0 <br /> N I I I I I I I I I II 4-A132 <br /> w <br /> Li <br /> Q <br /> U <br /> I c <br /> 0 <br /> QchLn <br /> r<-------��---- EQ EQ <br /> Q I -------------------------------- -- ------------ 1 ----------- EXTERIOR <br /> N O I I I L-------1------------------------------------------------------- ELEVATIONS <br /> I <br /> Q) <br /> o > <br /> N 0 <br /> O o <br /> ID WEST ELEVATION EAST ELEVATI ON SOUTH ELEVATION SHEET: <br /> 3--, &SCALE: 1/4" = 1'-0" 2 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A201 <br /> cn <br /> z <br /> Copyright Notice: Fvs tlawing was preparetl for use on a spedfic site contemporaneously with <br /> BRR Original printed on recycled paper its issue date and it is not suitable for use on a different project site or at a later time.use of this <br /> tlrawing for reference o ample on another project requires the services of r project <br /> rojtis not <br /> arch7tec[s and engineerse Reproduction of this drawing for reuse on another project is not <br />
The URL can be used to link to this page
Your browser does not support the video tag.