Laserfiche WebLink
BORING LOG NO. SB2 Page 1 of 1 <br /> PROJECT: Mike Sandhu CLIENT: Sandhu Brothers Farms <br /> Tracy, Ca <br /> SITE: 23577 S. Mountain House Parkway <br /> Tracy, CA <br /> (D0 LOCATION See Exhibit A-2 U) w <br /> wz a <br /> U_ O <br /> U Latitude:37.4443°Longitude:-121.3225° _ Q w o <br /> IL d W Jd <br /> Lu <br /> a <br /> C7 Q m Q <br /> DEPTH O <br /> SILT WITH SAND(MLS,light tan,80%silt,20%sand <br /> .�5.0 5 <br /> N <br /> O <br /> M <br /> 'a <br /> 0 <br /> W <br /> UJ <br /> LEAN CLAY WITH SAND(CLQ,brownish gray,90%sand, 10%clay <br /> UuJ <br /> p '10.0 <br /> 10- <br /> Lu <br /> O <br /> z <br /> a <br /> WELL GRADED GRAVEL WITH SILT(SW-SM),dark gray to light gray,95%sand,5%gravel <br /> p <br /> 15.0 <br /> m 1 <br /> zZ <br /> >J <br /> O <br /> Z <br /> 0 <br /> ° WELL GRADED SAND(SW),brown to gray,90%sand, 10%gravel <br /> Boring Terminated at 20 Feet 2 <br /> O <br /> W <br /> a <br /> z <br /> T <br /> W <br /> O <br /> 2 <br /> O <br /> LL <br /> 0 <br /> LU <br /> Stratification lines are appropmate.In-situ,the transition may be gradual. Hammer Type: Automatic <br /> Q <br /> IL <br /> LU <br /> Advancement Method: See Exhibit A-3 for description of field procedures. Notes: <br /> 0 <br /> 6"Hollow Stem Auger <br /> Q See Appendix B for description of laboratory <br /> > procedures and additional data(if any). <br /> F- <br /> z0 <br /> Abandonment Method: See Appendix C for explanation of symbols and <br /> U) Boring backfilled with cement-bentonite grout upon abbreviations. <br /> completion. Elevation estimated by google earth <br /> O <br /> WATER LEVEL OBSERVATIONS <br /> z Boring Started:11-26-2019 Boring Completed:11-26-2019 <br /> O <br /> Irerracon Drill Rig:D-50 Driller:Robert <br /> m <br /> 902 Industrial Way <br /> ? Lodi,CA Project No.:NA197074 Exhibit: A-2 <br />