Laserfiche WebLink
BORING LOG NO. SB3 Page 1 of 1 <br /> PROJECT: Mike Sandhu CLIENT: Sandhu Brothers Farms <br /> Tracy, Ca <br /> SITE: 23577 S. Mountain House Parkway <br /> Tracy, CA <br /> (D0 LOCATION See Exhibit A-2 U) w <br /> wz 0- <br /> J v O <br /> U Latitude:37.4441'Longitude:-121.3222° _ Q w o <br /> IL d W a 0 d <br /> Lu <br /> C7 Q m Q <br /> DEPTH O <br /> WELL GRADED SAND WITH SILT(SW-SM),red brown to gray brown,90%sand, 10%silt <br /> 5.0 5 <br /> WELL GRADED SAND(SW),gray brown,85%sand, 10%silt,5%gravel <br /> N <br /> A <br /> 80°7.0 <br /> SAND WITH SILT(SM),dark brown,80%sand, 15%silt,5%gravel <br /> UJ 8.5 <br /> Q WELL GRADED SAND(SW),brown, 100%sand <br /> 0 <br /> 0 <br /> 1 <br /> CD <br /> u; <br /> 0 <br /> z <br /> a <br /> z Xo:°13.5 <br /> SILT WITH SAND(ML),brown,80%silt,20%sand <br /> v 14.5 <br /> r <br /> rn_ <br /> SILTY CLAY(CL-ML),tannish brown,90%clay, 10%silt <br /> 15— <br /> z z <br /> Z <br /> ui <br /> >J <br /> 0 <br /> Z <br /> 0 <br /> J <br /> H <br /> Q <br /> O 20.0 <br /> 2 <br /> Boring Terminated at 20 Feet <br /> 0 <br /> W <br /> a <br /> z <br /> T <br /> W <br /> 0 <br /> 2 <br /> 0 <br /> LL <br /> 0 <br /> LU <br /> Stratification lines are appropmate.In-situ,the transition may be gradual. Hammer Type: Automatic <br /> Q <br /> IL <br /> LU <br /> Advancement Method: See Exhibit A-3 for description of field procedures. Notes: <br /> 0 <br /> 6"Hollow Stem Auger <br /> Q See Appendix B for description of laboratory <br /> > procedures and additional data(if any). <br /> F- <br /> z0 <br /> Abandonment Method: See Appendix C for explanation of symbols and <br /> U) Boring backfilled with cement-bentonite grout upon abbreviations. <br /> completion. Elevation estimated by google earth <br /> O <br /> J WATER LEVEL OBSERVATIONS <br /> z Boring Started:11-26-2019 Boring Completed:11-26-2019 <br /> m <br /> Irerracon Drill Rig:D-50 Driller:Robert <br /> 902 Industrial Way <br /> ? Lodi,CA Project No.:NA197074 Exhibit: A-3 <br />