My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013804
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TEEPEE
>
2300
>
2600 - Land Use Program
>
PA-2000184
>
SU0013804
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 8:54:01 AM
Creation date
12/10/2020 8:20:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013804
PE
2631
FACILITY_NAME
PA-2000184
STREET_NUMBER
2300
Direction
N
STREET_NAME
TEEPEE
STREET_TYPE
DR
City
STOCKTON
Zip
95205-
APN
13208011
ENTERED_DATE
12/1/2020 12:00:00 AM
SITE_LOCATION
2300 N TEEPEE DR
RECEIVED_DATE
11/30/2021 12:00:00 AM
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21SJCOG, Inc. I. Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs. If ITMMs are not signed within six months, the applicant must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This is the effective date of the ITMMs. 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must: a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered (the bond should be valid for no longer than a 6 month period); or b. Pay the appropriate S.IMSCP fee for the entirety of the project acreage being covered; or c. Dedicate land in-lieu offees, either as conservation easements or fee title; or d. Purchase approved mitigation bank credits. 4. Within 6 months from the effective date of the ITMMs or issuance of a building perm it, whichever occurs first, the project applicant must: a. Pay the appropriate S.IMSCP for the entirety of the project acreage being covered; or b. Dedicate land in-lieu of fees, either as conservation easements or fee title; or c. Purchase approved mitigation bank credits. Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. ■ Receive your Certificate of Payment and release the required permit It should be noted that if this project has any potential impacts to waters of the United States [pursuant to Section 404 Clean Water Act], it would require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 days. It may be prudent to obtain a preliminary wetlands map from a qualified consultant. If waters of the United States are confirmed on the project site, the Corps and the Regional Water Quality Control Board (RWQCB) would have regulatory authority over those mapped areas [pursuant to Section 404 and 401 of the Clean Water Act respectively] and permits would be required from each of these resource agencies prior to grading the project site. If you have any questions, please call (209) 235-0600.
The URL can be used to link to this page
Your browser does not support the video tag.