My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013754
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14800
>
2600 - Land Use Program
>
PA-1900208
>
SU0013754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:29:42 PM
Creation date
12/15/2020 4:28:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013754
PE
2675
FACILITY_NAME
PA-1900208
STREET_NUMBER
14800
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20924023
ENTERED_DATE
11/12/2020 12:00:00 AM
SITE_LOCATION
14800 W SCHULTE RD
RECEIVED_DATE
11/2/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PotentiallyLess Than Less Than <br /> Significant Significant with Significant No <br /> g Mitigation g <br /> Impact Incorporated Impact Impact <br /> A. Energy. <br /> Would the project: <br /> a) Result in a potentially significant environmental <br /> impact due to wasteful, inefficient, or unnecessary ❑ <br /> consumption of energy, or wasteful use of energy X❑ <br /> resources, during project construction or operation? <br /> b) Conflict with or obstruct a state or local plan for ❑ <br /> renewable energy or energy efficiency? X <br /> Impact Discussion: <br /> a) Potentially Significant Impact. Project construction and operations would involve activities that would require the use <br /> of energy, including electricity and petroleum. Further analysis is required to determine whether the Project could <br /> potentially result in any adverse effects related to energy consumption. Therefore, these issues will be analyzed in the <br /> Draft EIR. <br /> b) Potentially Significant Impact. Project construction and operations would involve activities that would require the use <br /> of energy, including electricity and petroleum. Further analysis is required to determine whether the Project could <br /> potentially result in any conflict with or obstruct state or local plans for renewable energy or energy efficiency. <br /> Therefore, these issues will be analyzed in the Draft EIR. <br /> Enter oroiect#s. —Initial Study 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.