Laserfiche WebLink
PotentiallyLess Than Less Than <br /> Significant Significant with Significant No <br /> g Mitigation g <br /> Impact Incorporated Impact Impact <br /> A. Energy. <br /> Would the project: <br /> a) Result in a potentially significant environmental <br /> impact due to wasteful, inefficient, or unnecessary ❑ <br /> consumption of energy, or wasteful use of energy X❑ <br /> resources, during project construction or operation? <br /> b) Conflict with or obstruct a state or local plan for ❑ <br /> renewable energy or energy efficiency? X <br /> Impact Discussion: <br /> a) Potentially Significant Impact. Project construction and operations would involve activities that would require the use <br /> of energy, including electricity and petroleum. Further analysis is required to determine whether the Project could <br /> potentially result in any adverse effects related to energy consumption. Therefore, these issues will be analyzed in the <br /> Draft EIR. <br /> b) Potentially Significant Impact. Project construction and operations would involve activities that would require the use <br /> of energy, including electricity and petroleum. Further analysis is required to determine whether the Project could <br /> potentially result in any conflict with or obstruct state or local plans for renewable energy or energy efficiency. <br /> Therefore, these issues will be analyzed in the Draft EIR. <br /> Enter oroiect#s. —Initial Study 14 <br />