My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013802
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26440
>
2600 - Land Use Program
>
PA-2000048
>
SU0013802
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 7:57:11 AM
Creation date
12/17/2020 5:03:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013802
PE
2631
FACILITY_NAME
PA-2000048
STREET_NUMBER
26440
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
APN
00120084
ENTERED_DATE
12/1/2020 12:00:00 AM
SITE_LOCATION
26440 N THORNTON RD
RECEIVED_DATE
10/27/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Plen Fav1eW TBHT PGEPIanRevlaw�pga.com <br /> S <br /> E/ectric Company' `a�'M'nHpHmH„1 <br /> October 28, 2022 <br /> Alisa Goulart <br /> County of San Joaquin <br /> 18'10 E Haz¢Iton Ave <br /> Stockton, CA 95205 <br /> Raf: Gas and Electric Transmission and Distribution <br /> Dear Alisa Goulart, <br /> Thank you for submitting the PA-2000048 plans for our review. PG&E will review the submitted <br /> plans in relationship to any existing Gas and Electric facilities within the project area. If the <br /> proposed project is adjacent/or within PG&E owned property and/or easements, we will b¢ <br /> working with you to ensure compatible uses and activities near our facilities. <br /> Attached you will Fnd information and requirements as it relat¢s to Gas facilities (Attachment 1) <br /> and Electric facilities (Attachment 2). Pleas¢ review these in detail, as it is critical to ensure <br /> your safety and to protect PGB�E's facilities and its existing rights. <br /> Below is additional information for your review: <br /> 1. This plan review process docs not replace the application process for PGS.E gas or <br /> ¢lactric service your project may require. For th¢sa requests, please continue to work <br /> with PGB.E Service Planning: htt '// / US/b / 'ces/buildin - _ <br /> and-renovat on/overview/overv'ew.oace. <br /> 2. If the project being submitted is part of a larger project, please include the entire scope <br /> of your project, and not just a portion of it. PG8.E's facilities are to ba incorporated within <br /> any CEQA document. PG8.E needs to verify that the CEQA document will identify any <br /> required future PGB�E s¢rvicas. <br /> 3. An engineering deposit may be required to review plans for a project depending on the <br /> size, scope, and location of the project and as it relates to any rearrangement or naw <br /> installation of PGB.E facilities. <br /> Any proposed uses within the PGS.E fee strip and/or easement, may include a California Public <br /> Utility Commission (CPUC) Stiction 851 filing. This requires the CPUC to render approval for a <br /> conveyance of rights for specific uses on PG&E's fee strip or easement. PGS.E will advise if the <br /> necessity to incorporate a CPUC Section 85tfiling is required. <br /> This letter does not constitute PGBE's consent to use any portion of its easement for any <br /> purpose not previously conveyed. PGB,E will provide a project specific response as required. <br /> Sincerely, <br /> Plan Review Team <br /> Land Management <br /> PGKcH Gas and Electric I�acili ties Page 1 <br /> Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.