My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082985_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14800
>
2600 - Land Use Program
>
SR0082985_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:04:15 AM
Creation date
12/21/2020 3:02:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0082985
PE
2602
STREET_NUMBER
14800
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20924023
ENTERED_DATE
12/8/2020 12:00:00 AM
SITE_LOCATION
14800 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.4 – Energy <br />Draft Environmental Impact Report February 2021 <br />14800 W. Schulte Road Logistics Center 4.4-14 <br />Table 4.4-2. Construction Equipment Diesel Demand <br />Phase <br />Pieces of <br />Equipmenta Equipment CO2 (MT)a Kilograms of CO2 per Gallonb Gallons <br />Site Preparation 7 18.39 10.21 1,801.14 <br />Grading 8 89.92 10.21 8,806.72 <br />Architectural Coating 1 8.17 10.21 800.24 <br />Paving 6 21.03 10.21 2,059.64 <br />Building Construction 9 174.91 10.21 17,131.61 <br />Total 30,599.33 <br />Sources: <br />a Appendix B <br />b The Climate Registry 2020. <br />Notes: CO2 = carbon dioxide; MT = metric ton <br />Calculations for total worker, vendor, and hauler fuel consumption are provided in Table 4.4-3, Construction Worker <br />Vehicle Gasoline Demand, and Table 4.4-4, Construction Vendor Truck Diesel Demand. <br />Table 4.4-3. Construction Worker Vehicle Gasoline Demand <br />Phase Trips Vehicle CO2 (MT)a Kilograms of CO2 per Gallonb Gallons <br />Site Preparation 198 1.04 8.78 117.98 <br />Grading 660 3.45 8.78 393.26 <br />Architectural Coating 1,920 9.69 8.78 1,103.33 <br />Paving 336 1.70 8.78 193.09 <br />Building Construction 15,100 77.82 8.78 8,863.78 <br />Total 10,671.44 <br />Sources: <br />a Appendix B <br />b The Climate Registry 2020. <br />Notes: CO2 = carbon dioxide; MT = metric ton <br />Table 4.4-4. Construction Vendor Truck Diesel Demand <br />Phase Trips Vehicle CO2 (MT)a Kilograms of CO2 per Gallonb Gallons <br />Site Preparation 66 0.81 10.21 79.68 <br />Grading 198 2.44 10.21 239.03 <br />Architectural Coating 512 6.25 10.21 612.31 <br />Paving 84 1.03 10.21 100.39 <br />Building Construction 3,020 37.08 10.21 3,631.56 <br />Total 4,662.97 <br />Sources: <br />a Appendix B <br />b The Climate Registry 2020. <br />Notes: CO2 = carbon dioxide; MT = metric ton <br />As shown in Tables 4.4-2 through 4.4-4, the Project is estimated to consume 45,934 gallons of petroleum during <br />the construction phase. For disclosure, by comparison, approximately 28.7 billion gallons of petroleum are <br />consumed in California annually (EIA 2020d). Also, for disclosure, countywide total petroleum use by vehicles is <br />expected to be 370 million gallons per year in 2022 (CARB 2020). The Project would be required to comply with
The URL can be used to link to this page
Your browser does not support the video tag.