--- ......... . . .__.. .— ------- _...__
<br /> ----------
<br /> REVISIONS BY
<br /> A
<br /> `_ _l
<br /> 01 , 0 GENERAL RE NIE E_ME�N C ` 0wm _,_0 I:� C�AVAT_ION 0`�aT1 1 AC F'II__I..__ M�, TE f�I ,��_ C� . C� T �I� I 6 � �F�I� U1��I� �_
<br /> Z
<br /> ONX--SITE ANK - ACCEPTANCE: TANK INSTALLATION CONTRACTOR HOLE SI E�._ APPROVED MATERIALS: "TE ORO" WII_I._ FURNISH THE FOLLOWING HARDWARES UNLESS
<br /> IS RESPONSIBLE FOR INSPECTING THE TANKS [--OR DAMAGE UPON RECEIPT OTHERWISE SPECIFIED BY THE COMPANY REPRESENTATIVE. �'!�
<br /> AT' THE JOB SITE:::. ANY VISIBLE DAMAGE: IS TO BE: NOTED ON THE:. ST-ABLE SOIL. HOLE IS IO BE LARGE ENOUGH TO ALLOW "PEA GRAVEL"
<br /> FI[_I_ ASSEMBLY -- PROD(JC T" ADAPTER R DUST CAP AND
<br /> Ag
<br /> DELIVERY F FCEIC� IF NCS VI51131_.F DAMAGE" _TANKS SNOUI....D BE 4"' MINIMUM BETWEEN TANKS AND 18"' MINIMUM BETWEEN
<br /> RECEIVED WI TFI "SUBJECT TO DAMAGE: FOUND DURING F RE--- TANK SIDE ANC? END CAPS AND TETE WALL. OF THE TANKS
<br /> A CLEAN, NATURALLY ROUNDED AGGREGATE: WITH ANGULAR NAMEPLATE: HOLDER
<br /> PARTICLE SIZE 1/8" MINIMUM AND 3/4..: -. ...._ .
<br /> MAXIMUM, NO
<br /> _ -----------------__INSTALLAT1ON TEST" WRITTEN ON THEFREI FREIGHT BILL, H O _E. PARTICLE SHALL A THROUGH A 8 SIEVE. MUST MEET INSIA_LATION CONTRACTOR IS RESPONSIBLE FOR OFF _OADlNC PRODUCT :
<br /> ASUREMENT DEVISE
<br /> ASTM C-33 PARA. 9.1 FOR QUALITY AND SOUNDNESS, TANK GAUGE ...._ ._____._____
<br /> -TH : TANKS FROM THE TRUCKS. HOLE DEPTH: HOLEMUST BE DEEP ENOUGH TO ALLOW A MINIMUM __.
<br /> OF 12" DEEP BED OF SPECIFIED MATERIAL UNDER THE TANKS. ..........
<br /> THE -TANK INSTALLATION CONTRACTOR ACCEPTS FUI.._E_ RESPONSIBILITY STONE_ OR GRAVEL CRUSHING VAPOR ADAPTER, DUST C'AP AND NAME PEA]-[-. HOLDER
<br /> R
<br /> _
<br /> . RECOVERY
<br /> - - Y FIASEm 1 ..
<br /> FOR PROPER HANDLING AND INSTALLATION OF THE UNDERGROUND -TANKS THE TANK BURIAL DEPTH IS TO BE MEASURES) AT THE REMOTE" WASHED STONE OR GRAVEL CRUSHING WITH ANGULAR PARTICLE
<br /> PUMP OPENING, THE CALCULATION MUST- CONSIDER PIPE AND PIPING AND `�'I-#ALL INSUE�E:. C,ORRE_Cs-E WORKMANSHIP, PRACTICES C -� - SiZfa: 1/8" MINIMUM AND '1/2" MAXIMUM. NO PARTICLE Sf-IAE_L PASS REMOTE PUMP (SUBMERSIBLE) WITH RELAY CONTROL BOX � _.__-.___............__ _...__...
<br /> AND CONSTR(JCTION PROCEDURES ARE FOLLOWED DURING THE HANDLING BURIAL. DEPTH AT AND LENGTH OF RUN TO ]-FTE" PUMP THROUGH A #S SIEVE, MUST MEET ASTM C-33 PARAGRAPH 9.1
<br /> AND INSTALLATION OF TFIE: 'TANKS AND PIPING PER MFR'S, SPEC"S. YARD SLOPE, ANE:.) TANK MANI_EOE_E: DIMENSIONS), FOR QUALITY AND SOUNDNESS. FILL BOXES - SEE PLAN
<br /> CONTRACTOR IS TO FURNISH THE COMPANY REPRESENTATIVE VENT VALVE ASSEMBLIES �
<br /> LEAS FIN-G: THE TANK CONTRACTOR IS RESPONSIBLE:: FOR ALL LABOR, NOTE;_ IF UNEXPECTED WATER IS ENCOUNTERED, IMMEDIATELY _
<br /> MATERIAL AND EQUIPMENT [REQUIRED TO CONDUCT RIE FOLLOWING CON-FACT _. ._ P - - : - - - ]IMMEDIATELY
<br /> _ _ _. MEETS
<br /> CPtIET � 1 IkiL_ C��T �0I\IY FE_['[RE_. E_.CJ ETRE FOR [:aI( EC; TIC?fJ
<br /> WRIT
<br /> EVIDENCE THAT [CIF BACK FILL MATERIAL MFF TS
<br /> THE APPROVED MATERIALS SPECIFICATIONS, UPON REQUEST" ALL PRODUCT _TAGS FOR IDENTIFICATION
<br /> TIES TS: a �
<br /> BF['-CFE ANY MATERIAL IS PLACED ��
<br /> BErE=C)RE: Ct MT'L..F:TING THE EXCAVATION SUBMERGED FILL TUBES
<br /> 1,. VERIFY TANK PRE--INSTALLATION BRINE LEVEL 0 DE-IVE:RY BACK FILL MATERIAL, NOT MEETING THE APPROVED MATERIALS
<br /> m
<br /> 2.
<br /> <. ALLATION BRINE VERIFICATION.
<br /> BEDDING:� �
<br /> TANK AFTER IN F EDDINa��:.__. A 12 MINIMUM BED OF BACK FILL MATERIAL IS TO �PECIFICATIONS, OR IF CONTRACTOR DOES NOT FURNISH THF
<br /> � 3. INTERNAL MFA S(JREME:NTS, BE PLACED IN THE F�1OLC::, SMOOTHED AND LEVELED 1�0 THE F=ILE.. END PRIOR REQUIRED EVIDENCE THAT MATERIAL. MEETS TNF:: APPROVED SUBMERGED _. _ ,I
<br /> TO SETTING -THE TANK. SPECIFICATIONS, WILL BE CONSIDERED ALTERNATE MATERIAL. _T�TPOIN _ T6" E _
<br /> FILL BOTTOM END IS TO SLANT C J 45 "WHI-_N
<br /> FTF LOWEST T OF Tl--IE SLANT CUT WILL BE a MAXIMUM FROM
<br /> DOCUMENTS.UMEmN TSI_ DRAWINGS AND SPECIFICATIONS ARE:: COOPERATIVE. ,
<br /> -1-1-IE BOTTOM OF THE TANK. THE HIGHEST POINT OF THE SLANT CUT IS
<br /> EXECUTE WORK INDICATED IN ONE: AS IF INDICATED IN BOTIL II,_NSTALLAT:ICON--.--OFA---APPROVED MATERIALS: MATERIAL MUST BE: DRY AND
<br /> SPECIFIED, a .as1C .T I_ -- DO NOT PLACE. FRP TANKS ON CONCRETE:. SLAB, EXCEPT IN A "WE:-T" [TOE En INSI�ALLLATION, TO BE 10' MAXIMUM FROM TFIE BOTTOM OF TII[_mm TANK,
<br /> WORK NOT DETAILED OR S E�:CIFIED, BUT REQUIRED TO COMPLETE TIMCIF.F�S„ BEAMS OR CRADE._FS OR GROUT THF TANKS IN WET
<br /> CNE: INSTAI.._LATION MUST BE BROUGHT TO THE ATTENTION OF THE _ THE C' MAXIMUM DIMENSION IS MOST CRITICAL DUE -CO AIR
<br /> CEMENT. TANK, TIED DOWN OR NOT, MUST NEVER BE PREPARE T-HF TANK BE-TIS FIER BEDDING PROCEDURE. SET THE TANKS
<br /> COMPANY REPRESENTATIVE PRIOR TO IT'S PERFORMANCE ORMANCE AND _ POI_.LUTION RULES.
<br /> SHALL. FTE:: [-HE SAME QUALITY AND TYPE: AS WORK DETAILED OR L.EwFT ON THE BED WITHOUT BACK FILL TO THET. TOP OF THE TANK ON THE BED WITH THE PROPER LEVEL. PLACES A 12" LIFT OF PACK FILf_.
<br /> IF' THERE IS ANY CHANCE OF WATER, 12'" OR MORE ABOVE -1-1-IE EVENLY AROUND THE TANKS. ORIENT' EF1E SL.AN T CUT SUCH THAT INCOMING PRODUCT IS E�IREI IED F
<br /> SPECIFIED. CONTRACTOR SE-IAL.L VERIFY ALL DIMENSIONS AND mm M ,
<br /> TANKS BOTTOM, IN THE HOLE. _ -TOWARD VAPOR RETURN.
<br /> CONDITIONS ON THE SITE AND REPORT AT ONCE (PRIOR TOPUSH BACK FILL COMPLETELY UNDERNEATH _TF1E TANK AND UNDER THE C� ,
<br /> ij
<br /> START OF WORK) ANY DISCREPANCIES FOUND BETWEEN DRAWINGS. y END GAPS. THIS IS THE MOST IMPOR-FAN F PART OF THE BACK FILT_
<br /> SPECIFICATIONS AND SITE CONDITIONS, UNDER NO F,-1C�LE.. SI--iC)F�.I_NG/SIDE:_SLOPING:_ NO PERSON SHALL ENTER 1 EnR A TANK .�"_m <
<br /> __ _ �u PROCESS. (PROCEDURE CAN BE DONE FROM INF.. BANK OR ADJACENT � z Ln
<br /> HOLE BELOW THE: FIVE FOOT DEEP LEVEL UNLESS THE WALLS ARE: m
<br /> CIRCUMSTANCES, SHALL THE WORK IN QUESTION BE STARTED IF � THE TANK TOP, IF A MAN I``a IN THE HOI_.E TO "WORK" THE BACK FILL._,
<br /> A DISCREPANCY IS DISCOVERED AFTER THE AWARD OF -ITE SHORED OR SIDE SLOPED AS PRESCRIBED BY CURRENT- OSHA THE HOLE MUST BE SHORED OR SIDE SLOPED. NO EXCEPTIONS, 07. F-)I P I N G YS_�E_,M 0 0 (0
<br /> CONTRACT, TERMS OF TF9F CAONTRAtT APPLY TC) THIS WORK. REGUi.._AIIONS. NQ._EXCEf?11�}N�= STATE REmQUIREMENrS THAILh
<br /> c ARE MORE RESTRICTIVE THAN COMPANY SPECIFICATIONS ARE FO PLACE: THE SECOND 12'" LIFT OF BACK FILL EVENLY AROUND THE TANKS. ___ �� rxa
<br /> I
<br /> CONTRACT-OR TOR S[-TALI__ KEEP A COMPLETE SET t:JF DRAWING. AND _ _ SPECIFIED � �" �
<br /> SBE: ADHERED TO AS TF]OUGH IN COMPANY AGAIN, REPEAT THE "WORKING OF BACK FILL UNDER THE TANK AND SHALL_ BE PER PLANS AND INSTALLED PER ALL MANUFACTURER'S d I �- �
<br /> SPE:CIFTCATIONS E=CSR THE WORK ON Tmf-9E JOB SITE AT ALL -
<br /> SPE:.:CIFICATIONS, 1-1-AE CONTRACTOR IS RESPONSIBLE FOR ANY UNDER -THE END CAPS. CONTINUE TO BACK FILL EVENLY AROUND THE TANKS RECOMMENDATIONS AND STA TF. AND LOCAL CODES. I_�_1 Z, m
<br /> TIMES DURING THE PERFORMANCE OF WORIK. r
<br /> DESIGN, MATERIALS, EQUIPMENT, PERMITS, ETC. FOR SHORING, � UP TO INE_ TOP OF THE' TANKS. ) � � �� �
<br /> OR SIDE SLOPING A HOLE. CONTFACTOR MAY ELECT' TO SHORE BACK FILL TO al1B GRADE AFTER PIC INC ANE) TESTING ETC... I r
<br /> F- _f E C I TIC_N` ;___ ALL- CONTRACTORS[ORS aEIAE_E_ PROTECT- ADJOINING ANY TANK HOLE A1_ HIS SOLE OPTION. COMPLETED. _ _, _ < `� �<' �
<br /> PROPERTY, EARTHWORK, TREES, ETC, FROM DAMAGE. AND SHALL l � � r �� __j �
<br /> GIVE: PROPER WRITTEN NOTICE OF PROPOSED WORK 10 ADJOINING � � 08. 0 �I TANK BLAS. LSE
<br /> PROPERTY OWNERS OF TENANTS IF TNEm WORK MAY IN ANY WAY"
<br /> COMPANY ANY REF RESENNTATIVE: IS TO SPECIFY TO 1 EM1i[: CONTRACTOR
<br /> TF�ACTOF; ALTERNATE: MATERIALS: ANY BACK FµIEmL_ MATERIAL. NOT MEETING T[IF. C5 < ��
<br /> INTERFERE WITH TETE NORMAL OPERATION OF THE-:,IR BUSINESS OR ANY TANK hIOI_E THE COMPANY DEEMS (`a NECESSARY It} .�[IORE. SPECIFICATION OF APPROVED MATERIAE_. APPROVAL OF THE: COMPANY C/� i (6
<br /> ENJOYMENT OF' THEIR PROPERTY. SF-TOULD ANY' DAMAGE OCCUR I EF'RESENTATIVE IS NEEDED PRIOR TO USING ALTERNATE MATERIALS CONCRETE TANK SLAB WILL. BE ET" MINIMUM THICKNESS, SHOWN IN c c� <0
<br /> a e - (USE OF CERTAIN MATE=F�IAE_.S WILL REQUIRE THE:_ COMPANY TO OBTAIN _ _ �nz
<br /> DUE. -10 THIS WORK, -Th-IE CONTRACTOR SHALL MAKE: REPAIRS AS ( � APPROVAL
<br /> - Y DETAILS, REINFORCED PER DETAILS, WI TN A 45d MITER ON ALL z Ln 0 imp
<br /> - WRITTEN AF T ROVAL CHET. TANK MANUFACTURER TO PRESERVE THE TANK
<br /> REQUIRED -TO THE SATISFACTION OF., THE.. COMPANY CORNERS. TANK SLAB SHALL EXTEND A MINIMUM OF 24BEYOND < ��° �t _
<br /> WARRANT)"). THEA. -TANK HOLE: MUST BE SHORED OF SIDE SLOPED A S -- c-<
<br /> REPRESENTATIVE.rA-EIVE.:. PRO IEC T COMPLETED WORK FROM DAMAGE UNTIL
<br /> _ TEST
<br /> .. _ PROJECTED LIMIT OF THE COVERED TANKS. SLAB IS TO BE A -�-� �� ��
<br /> IT IS ACCEPTED BY LLFETF: COMPANY REPRESENTATIVE.
<br /> 04. 0E 1_ N _�.-) N OF _ TANKS^ _ MEN WILL HAVE TO EmN TE F� CO COMPACT ANL? TEST TI-IE BACKFILL., UNIFORM THICKNES a, COLOR 1-O MATCH EXISTING CONCRETE,
<br /> ALL ALTERNATE MATERIAL MUST BE: COMPACTED -TO A MINIMUM Of=
<br /> SUPERVISION_---- ` . m N�: __C C , ,F E IN6 aEl 1:a ALL CONTRACTOR'S ARE ALL TANK MANWAY ARE TO BE
<br /> LIFTING MOVING: WHEN LIf= TING OR MOVING ANY FRP TANK 9O RELATIVE DENSITY (ASTM [_7 1357 -TCT). CONTRACTOR IS TO FURNISH RAISED 2" ABOVE ADJACENT SLAB GRADES WITH A 40" MINIMUM
<br /> RESPONSIBLE FOR PROGRESS, EXECUTION AND QUALITY OF THEIR SUB ALVWAY..` USE PROPERLY SIZED EQUIPMENT AND LIFT BY -THE THE: COMPANY REPRESENTATIVE WITH A CERTIF=ICATION OF COMPACTION 7 m
<br /> >� TRANSITION. PERIMETER FILL BOXES ON TANK SLAB (SAMPLE WELLS
<br /> CONTRACTOR'S WORK AND SHALE_ COORDINATE:: AND EXPEDITE LIFTING LUG(S), PER MANUFACTORIES RECOMMENDATIONS. FROM A REGISTERED SOIL, ENGINEER.
<br /> OR MONITORS) AETk=: TO BE RAISED 1" ABOVE GRADE WITH A DESIRED
<br /> PROCUREMENT OF MATERIALS AND PERFORMANCE OF' WORK OF 18" TRANSITION. BOTTOM OF TT-1E SLAB IS IC7 BE THICKENED TO THE
<br /> RESPECTIVE TRADES AND SUES Ct NIRA(µ TORS. ITiE COMPANY REPRESENTATIVE IS RESPONSIBLE. FOR PROVIDING THE �°T � °WTp `E
<br /> NEVER ROLL OR USE CABLES OR CHAINS AROUND ANY FRP TANK. - - BOTTOM OF THE FILL BOXT_.S - 12 MAXIMUM.
<br /> CONTRACTOR IS -TO HAVE:: THE SAME; QUALIFIED RESPONSIBLE SET ON SMOOTH GROUND, FREE. OF ROCKS AND FOREIGN OBJECTS EXACT INSTALLATION SPECIFICATION FOR ALTERNATE: MATERIALS - �fiwy' 4-� ' QiW�,
<br /> SEE UNDERGROUND TANK AND PIPING INSTALLATION MANI..TAL FOR �M - ��E=�<;r
<br /> REPRESENTATIVE, WF--IO UNDERSTANDS AND SPEAKS ENGLISH ,� . � .
<br /> _ _ _ _
<br /> SPECIFICATIONS ON INSTALLATION OF � � �� G.
<br /> �� :2
<br /> SLAB I� TO MATCH EXISTING COLOR (BRAND NEW SITE PREFER I C) BE
<br /> FL_L.)EN T[_Y, ON EkEE. JOB AT ALL -TIMES, INCLUDING fHE_. TIME;_ C - - - _ - IN NATIJ[ AI_ COLOR) AND TEXTURE:D WITH ANON- SKID SURFACE.
<br /> ( ETI C Al, (3 (I
<br /> CHOKING: TANKS ARE TO CSF CHOKED UNTIL READY FOR
<br /> - INSTALLATION. IF WINDY CONDITIONS EXIST OR ARE EXPECTED, ;_. c
<br /> FOR ESTABLISHING AND MAINTAINING ALL LINES, LEVELS AND WOOD FLOAT, STEEL �T��RO'JVFI_, �FF1EN BRUSH WI-1-1-1 BROOM � .„ �� ,T;IE
<br /> STONE AND GRAVEL_ CRUSHING �w �`
<br /> TIE TANKS DOWN USING MINIMUM 1/2 INCH NYLON OR HEMP ROPE - c '
<br /> GRADES SHOWN ON THE FLAN. OR C)-TF-iE�RWISl� [REQUIRED, .SAND
<br /> PERPENDICULAR TO EHE L..E_NC'�TH OF 'THE- -TANKS.)
<br /> OVER EACH TANK AND TIL_ IO STAKES OF ADf_QIJATF. SIRE_ IO SAND WITFT WATER COMPACTION
<br /> ALI_, CONTRACTORS ARE TO MAINTAIN THE SITE IN AN - ALL MANWAY I__IE)S MUST" BE PRIMED.
<br /> PREVENT_ MOVFMEN I OF' THE TANKS. ' n �, r
<br /> ACCESSIBLE CONDITION FOR OTTiEF� TRADES AND CON T[�A( TORS. CONTROLLED DENSITY FILL_ (CDFm)
<br /> ACCEPTABLE_CHOKING MATERIALS ARE: USED TIRES OR RUBBER
<br /> SAE ETY _ ALL CON TRAC IORS SHALL PERFORM THE WORK IN ACCORD-
<br /> BLOCKS �
<br /> . ROCKS, WOOD AND OTHER RIGID MATERIALS ARE
<br /> ANCE=: WITH SAFE PRACTICES, -CAKING ALL REASONABLE PRECAUTIONS UNACCEPTABLE CHOCKING. � C� I N I� I:_C _I_.f �N �j /�__I E _��__E ) N
<br /> TO PROTECT _[HE FACILITY AND ADJACENT FACILITIES,
<br /> WORKMEN AND "THE PUBLIC AND PROPERTY, WHERE REASONABI. Y OPENINGS: TANK OPENINGS ARE TO REMAIN CLOSED BUT 05 2 DRY Y E--1 E__E� CONDITION - - - --- - -------
<br /> NECESSARY, BARRIERS, GUARDS, 'TEMPORARY BRIDGES" LIGHTS AND VENTED AT ALL TIMES EXCEPT DURING THE:: I-EST. ---------------_--------
<br /> WATCHMEN SHALL BE USED. WF-IILEV: ON THE PREMISES OF. ]'HE COMPANY SHALL BE SCHEDULED PERFORMED PER ALL LOCAL AND STATE
<br /> OR ITS AFFILIATES, ALL OF TETE COMPANY'S SAFETY RULES SHALL DAMAGE=-:__ IF TANK IS DAMAGED, DO NOT ATTEMPT REPAIRS. � REQUIREMENTS. MUST COMPLY WITH PIECING TEST REQUIREMENTS SPECIFIED IN
<br /> CONTACT COMPANY REPRFSE.NFATIVE FOR REPAIRS OR TANKS WITHOUT BACK FILL TO ,SUB GRADE MUST BE BALLASTED IF
<br /> BE STRICTLY OBSERVED; IN PAR-I-ICULAR, NO SMOKING SHALL _ _ - m __ -., ry � CITY OF I._OCKE::f=ORLI REVISED LJNC�E:_Rt�F�OUNL� STORAGE TANK (l,1ST) AND
<br /> REPLACEMENT, PER MANUFACTURER'S APPROVALS, 1_NERF IS ANY t;l-TANTE THAT SURFACE OR SUBSURFACE WATER
<br /> BE ALLOWED ON COMPANY PROPERTY WHEN GASOLINE_ IS PRESENT WILL ENTER TFIE TANK HOLE TO A DEPTH OF 23" OR GREATER PIPING PERMANENT CLOSURE: REQUIREMENTS".
<br /> ON THE SITE. CONTRACTOR SHALL NOT PERFORM OR PERMIT ABOVE THE BOTTOM OF THE TANKS. CAUTION -- DO NOT CONTRACTOR TO MAINTAIN A MONITORING EOG BOOK FOR THEIR INSTALLED
<br /> ANY ACT' ON -THE PREMISES OF T1E COMPANY OR IT'S BALLAST TANKS UN1- L. BACK -ILL IS 1�O T1 ETOP OF TANKS® EQUIPMENT AND TESTING. EXAMPLE. GAUGES, ANNLLARS, ETC
<br /> AF_FIT_IATEES WHICH INVOLVES A FIRE OR EXPLOSION HAZARD, EXCEPT IN WET HOLE PROCEDURES. Ya"O VACUUM MONITORING TUBING SHOULD BE EXTEND LONG ENOUGFI FOR
<br /> INCLUDING WELDING, TORCH CUT-TING AND DISPOSAL OF DEBRIS TESTING PURPOSES AND NOT BEING OBSTRUCTED BY ANY OF THE 46
<br /> BY BURNING WITHOUT PRIOR WRITTEN CONSENT OF THE COMPANY, 05. 0 INS] AI__E_._A FION OF E ANKS COMPONENTS. �
<br /> La_�^�._.._NOT_ SANDBLAST, CUT OR ENTER TANK: ON THE SITE, UNLESS u
<br /> M Ga
<br /> APPROVED BY AI_.[_ AFFECTED AGENCIES AND "TE_SORO"
<br /> [W__TITNC_. SETT TANKS ON PREPARED BED AND TILT 3" MAX. TOWARD TO
<br /> PRODUCT FILL SL.,1MP AS REQUIRED BY TESORO REPRESENTATIVE. CONSULT LnMANU
<br /> IF YOU FIND FREE. RODUC,T ON ]-HE WATER i_ABLE, IN HARE? MANUFACTURER FOR APPROVAL.
<br /> a �_ � I I
<br /> I, OR W
<br /> SOLID POCKS WHEREVER, �` c� cca
<br /> AFEGUARD_._.THE SITE AND cv
<br /> IMMEDIATELY CONT-ACI TETE. COMPANY REPRESENTATIVE FO[y � '
<br /> _3 o ,�
<br /> ASSI`;TANCE. a Q F_... Lli
<br /> z
<br /> DO NOT LEAVE.: SITE UNATTENDED UNTIL RELEASED BY THEp,> ., Ll,J
<br /> �a
<br /> COMPANY REPRESENTATIVE. NOTIFY THE FIRE DEPARI-MENT IF � � �
<br /> ANY PO`�SIBILI TY OF. IGNITION. ALL FREE PRODUCT WILL BE: �� � °'Cam c�
<br /> CEJ E- 0
<br /> REMOVED FROM THE SITE AT THE DIRECTION OF THE COMPANY0) r
<br /> REPRESENTATIVE.
<br /> __`° a-- V) raw: ra_ <
<br /> IF CONTAMINATED SOIL IS ENCOUNTERED, IMMEDIATELY CONTACT-
<br /> THE COMPANY REPRESENTATIVE.. FOR ASSISTANCE. CONTRACTOR SHALL
<br /> COMPLY WITH ALL CURRENT NEPA AND LOCAL REGULATIONS, MATERIA[_ DRAWN
<br /> SI-IALL BE: HANDLED PER ALL STATE & LOCAL REQUIREMENTS AND ALL ER
<br /> _,....._._.,.._...........Fr,TEc;aFT -
<br /> ACTION SHALL BET. COORDINATED WITH THE TE SORO" REPRESENTATIVE,
<br /> _._.....__ _ _._........_
<br /> 02a 0 REMOVAL OF EXISTING 'TANKS SHT. TITLE
<br /> _._..__ PIPING
<br /> & TANK NOTES
<br /> ')OB NUMBER
<br /> SEE SHEET TK1--D FOR REMOVAL OF OLD TANKS
<br /> SHEET
<br /> 1" K
<br /> 1 I
<br /> E
<br /> m................
<br /> x'.
<br /> --------------- ----------------- ........... ........... .......... ................ ............................................---__ ---_----------------------------------------
<br /> i
<br />
|