Laserfiche WebLink
--- ......... . . .__.. .— ------- _...__ <br /> ---------- <br /> REVISIONS BY <br /> A <br /> `_ _l <br /> 01 , 0 GENERAL RE NIE E_ME�N C ` 0wm _,_0 I:� C�AVAT_ION 0`�aT1 1 AC F'II__I..__ M�, TE f�I ,��_ C� . C� T �I� I 6 � �F�I� U1��I� �_ <br /> Z <br /> ONX--SITE ANK - ACCEPTANCE: TANK INSTALLATION CONTRACTOR HOLE SI E�._ APPROVED MATERIALS: "TE ORO" WII_I._ FURNISH THE FOLLOWING HARDWARES UNLESS <br /> IS RESPONSIBLE FOR INSPECTING THE TANKS [--OR DAMAGE UPON RECEIPT OTHERWISE SPECIFIED BY THE COMPANY REPRESENTATIVE. �'!� <br /> AT' THE JOB SITE:::. ANY VISIBLE DAMAGE: IS TO BE: NOTED ON THE:. ST-ABLE SOIL. HOLE IS IO BE LARGE ENOUGH TO ALLOW "PEA GRAVEL" <br /> FI[_I_ ASSEMBLY -- PROD(JC T" ADAPTER R DUST CAP AND <br /> Ag <br /> DELIVERY F FCEIC� IF NCS VI51131_.F DAMAGE" _TANKS SNOUI....D BE 4"' MINIMUM BETWEEN TANKS AND 18"' MINIMUM BETWEEN <br /> RECEIVED WI TFI "SUBJECT TO DAMAGE: FOUND DURING F RE--- TANK SIDE ANC? END CAPS AND TETE WALL. OF THE TANKS <br /> A CLEAN, NATURALLY ROUNDED AGGREGATE: WITH ANGULAR NAMEPLATE: HOLDER <br /> PARTICLE SIZE 1/8" MINIMUM AND 3/4..: -. ...._ . <br /> MAXIMUM, NO <br /> _ -----------------__INSTALLAT1ON TEST" WRITTEN ON THEFREI FREIGHT BILL, H O _E. PARTICLE SHALL A THROUGH A 8 SIEVE. MUST MEET INSIA_LATION CONTRACTOR IS RESPONSIBLE FOR OFF _OADlNC PRODUCT : <br /> ASUREMENT DEVISE <br /> ASTM C-33 PARA. 9.1 FOR QUALITY AND SOUNDNESS, TANK GAUGE ...._ ._____._____ <br /> -TH : TANKS FROM THE TRUCKS. HOLE DEPTH: HOLEMUST BE DEEP ENOUGH TO ALLOW A MINIMUM __. <br /> OF 12" DEEP BED OF SPECIFIED MATERIAL UNDER THE TANKS. .......... <br /> THE -TANK INSTALLATION CONTRACTOR ACCEPTS FUI.._E_ RESPONSIBILITY STONE_ OR GRAVEL CRUSHING VAPOR ADAPTER, DUST C'AP AND NAME PEA]-[-. HOLDER <br /> R <br /> _ <br /> . RECOVERY <br /> - - Y FIASEm 1 .. <br /> FOR PROPER HANDLING AND INSTALLATION OF THE UNDERGROUND -TANKS THE TANK BURIAL DEPTH IS TO BE MEASURES) AT THE REMOTE" WASHED STONE OR GRAVEL CRUSHING WITH ANGULAR PARTICLE <br /> PUMP OPENING, THE CALCULATION MUST- CONSIDER PIPE AND PIPING AND `�'I-#ALL INSUE�E:. C,ORRE_Cs-E WORKMANSHIP, PRACTICES C -� - SiZfa: 1/8" MINIMUM AND '1/2" MAXIMUM. NO PARTICLE Sf-IAE_L PASS REMOTE PUMP (SUBMERSIBLE) WITH RELAY CONTROL BOX � _.__-.___............__ _...__... <br /> AND CONSTR(JCTION PROCEDURES ARE FOLLOWED DURING THE HANDLING BURIAL. DEPTH AT AND LENGTH OF RUN TO ]-FTE" PUMP THROUGH A #S SIEVE, MUST MEET ASTM C-33 PARAGRAPH 9.1 <br /> AND INSTALLATION OF TFIE: 'TANKS AND PIPING PER MFR'S, SPEC"S. YARD SLOPE, ANE:.) TANK MANI_EOE_E: DIMENSIONS), FOR QUALITY AND SOUNDNESS. FILL BOXES - SEE PLAN <br /> CONTRACTOR IS TO FURNISH THE COMPANY REPRESENTATIVE VENT VALVE ASSEMBLIES � <br /> LEAS FIN-G: THE TANK CONTRACTOR IS RESPONSIBLE:: FOR ALL LABOR, NOTE;_ IF UNEXPECTED WATER IS ENCOUNTERED, IMMEDIATELY _ <br /> MATERIAL AND EQUIPMENT [REQUIRED TO CONDUCT RIE FOLLOWING CON-FACT _. ._ P - - : - - - ]IMMEDIATELY <br /> _ _ _. MEETS <br /> CPtIET � 1 IkiL_ C��T �0I\IY FE_['[RE_. E_.CJ ETRE FOR [:aI( EC; TIC?fJ <br /> WRIT <br /> EVIDENCE THAT [CIF BACK FILL MATERIAL MFF TS <br /> THE APPROVED MATERIALS SPECIFICATIONS, UPON REQUEST" ALL PRODUCT _TAGS FOR IDENTIFICATION <br /> TIES TS: a � <br /> BF['-CFE ANY MATERIAL IS PLACED �� <br /> BErE=C)RE: Ct MT'L..F:TING THE EXCAVATION SUBMERGED FILL TUBES <br /> 1,. VERIFY TANK PRE--INSTALLATION BRINE LEVEL 0 DE-IVE:RY BACK FILL MATERIAL, NOT MEETING THE APPROVED MATERIALS <br /> m <br /> 2. <br /> <. ALLATION BRINE VERIFICATION. <br /> BEDDING:� � <br /> TANK AFTER IN F EDDINa��:.__. A 12 MINIMUM BED OF BACK FILL MATERIAL IS TO �PECIFICATIONS, OR IF CONTRACTOR DOES NOT FURNISH THF <br /> � 3. INTERNAL MFA S(JREME:NTS, BE PLACED IN THE F�1OLC::, SMOOTHED AND LEVELED 1�0 THE F=ILE.. END PRIOR REQUIRED EVIDENCE THAT MATERIAL. MEETS TNF:: APPROVED SUBMERGED _. _ ,I <br /> TO SETTING -THE TANK. SPECIFICATIONS, WILL BE CONSIDERED ALTERNATE MATERIAL. _T�TPOIN _ T6" E _ <br /> FILL BOTTOM END IS TO SLANT C J 45 "WHI-_N <br /> FTF LOWEST T OF Tl--IE SLANT CUT WILL BE a MAXIMUM FROM <br /> DOCUMENTS.UMEmN TSI_ DRAWINGS AND SPECIFICATIONS ARE:: COOPERATIVE. , <br /> -1-1-IE BOTTOM OF THE TANK. THE HIGHEST POINT OF THE SLANT CUT IS <br /> EXECUTE WORK INDICATED IN ONE: AS IF INDICATED IN BOTIL II,_NSTALLAT:ICON--.--OFA---APPROVED MATERIALS: MATERIAL MUST BE: DRY AND <br /> SPECIFIED, a .as1C .T I_ -- DO NOT PLACE. FRP TANKS ON CONCRETE:. SLAB, EXCEPT IN A "WE:-T" [TOE En INSI�ALLLATION, TO BE 10' MAXIMUM FROM TFIE BOTTOM OF TII[_mm TANK, <br /> WORK NOT DETAILED OR S E�:CIFIED, BUT REQUIRED TO COMPLETE TIMCIF.F�S„ BEAMS OR CRADE._FS OR GROUT THF TANKS IN WET <br /> CNE: INSTAI.._LATION MUST BE BROUGHT TO THE ATTENTION OF THE _ THE C' MAXIMUM DIMENSION IS MOST CRITICAL DUE -CO AIR <br /> CEMENT. TANK, TIED DOWN OR NOT, MUST NEVER BE PREPARE T-HF TANK BE-TIS FIER BEDDING PROCEDURE. SET THE TANKS <br /> COMPANY REPRESENTATIVE PRIOR TO IT'S PERFORMANCE ORMANCE AND _ POI_.LUTION RULES. <br /> SHALL. FTE:: [-HE SAME QUALITY AND TYPE: AS WORK DETAILED OR L.EwFT ON THE BED WITHOUT BACK FILL TO THET. TOP OF THE TANK ON THE BED WITH THE PROPER LEVEL. PLACES A 12" LIFT OF PACK FILf_. <br /> IF' THERE IS ANY CHANCE OF WATER, 12'" OR MORE ABOVE -1-1-IE EVENLY AROUND THE TANKS. ORIENT' EF1E SL.AN T CUT SUCH THAT INCOMING PRODUCT IS E�IREI IED F <br /> SPECIFIED. CONTRACTOR SE-IAL.L VERIFY ALL DIMENSIONS AND mm M , <br /> TANKS BOTTOM, IN THE HOLE. _ -TOWARD VAPOR RETURN. <br /> CONDITIONS ON THE SITE AND REPORT AT ONCE (PRIOR TOPUSH BACK FILL COMPLETELY UNDERNEATH _TF1E TANK AND UNDER THE C� , <br /> ij <br /> START OF WORK) ANY DISCREPANCIES FOUND BETWEEN DRAWINGS. y END GAPS. THIS IS THE MOST IMPOR-FAN F PART OF THE BACK FILT_ <br /> SPECIFICATIONS AND SITE CONDITIONS, UNDER NO F,-1C�LE.. SI--iC)F�.I_NG/SIDE:_SLOPING:_ NO PERSON SHALL ENTER 1 EnR A TANK .�"_m < <br /> __ _ �u PROCESS. (PROCEDURE CAN BE DONE FROM INF.. BANK OR ADJACENT � z Ln <br /> HOLE BELOW THE: FIVE FOOT DEEP LEVEL UNLESS THE WALLS ARE: m <br /> CIRCUMSTANCES, SHALL THE WORK IN QUESTION BE STARTED IF � THE TANK TOP, IF A MAN I``a IN THE HOI_.E TO "WORK" THE BACK FILL._, <br /> A DISCREPANCY IS DISCOVERED AFTER THE AWARD OF -ITE SHORED OR SIDE SLOPED AS PRESCRIBED BY CURRENT- OSHA THE HOLE MUST BE SHORED OR SIDE SLOPED. NO EXCEPTIONS, 07. F-)I P I N G YS_�E_,M 0 0 (0 <br /> CONTRACT, TERMS OF TF9F CAONTRAtT APPLY TC) THIS WORK. REGUi.._AIIONS. NQ._EXCEf?11�}N�= STATE REmQUIREMENrS THAILh <br /> c ARE MORE RESTRICTIVE THAN COMPANY SPECIFICATIONS ARE FO PLACE: THE SECOND 12'" LIFT OF BACK FILL EVENLY AROUND THE TANKS. ___ �� rxa <br /> I <br /> CONTRACT-OR TOR S[-TALI__ KEEP A COMPLETE SET t:JF DRAWING. AND _ _ SPECIFIED � �" � <br /> SBE: ADHERED TO AS TF]OUGH IN COMPANY AGAIN, REPEAT THE "WORKING OF BACK FILL UNDER THE TANK AND SHALL_ BE PER PLANS AND INSTALLED PER ALL MANUFACTURER'S d I �- � <br /> SPE:CIFTCATIONS E=CSR THE WORK ON Tmf-9E JOB SITE AT ALL - <br /> SPE:.:CIFICATIONS, 1-1-AE CONTRACTOR IS RESPONSIBLE FOR ANY UNDER -THE END CAPS. CONTINUE TO BACK FILL EVENLY AROUND THE TANKS RECOMMENDATIONS AND STA TF. AND LOCAL CODES. I_�_1 Z, m <br /> TIMES DURING THE PERFORMANCE OF WORIK. r <br /> DESIGN, MATERIALS, EQUIPMENT, PERMITS, ETC. FOR SHORING, � UP TO INE_ TOP OF THE' TANKS. ) � � �� � <br /> OR SIDE SLOPING A HOLE. CONTFACTOR MAY ELECT' TO SHORE BACK FILL TO al1B GRADE AFTER PIC INC ANE) TESTING ETC... I r <br /> F- _f E C I TIC_N` ;___ ALL- CONTRACTORS[ORS aEIAE_E_ PROTECT- ADJOINING ANY TANK HOLE A1_ HIS SOLE OPTION. COMPLETED. _ _, _ < `� �<' � <br /> PROPERTY, EARTHWORK, TREES, ETC, FROM DAMAGE. AND SHALL l � � r �� __j � <br /> GIVE: PROPER WRITTEN NOTICE OF PROPOSED WORK 10 ADJOINING � � 08. 0 �I TANK BLAS. LSE <br /> PROPERTY OWNERS OF TENANTS IF TNEm WORK MAY IN ANY WAY" <br /> COMPANY ANY REF RESENNTATIVE: IS TO SPECIFY TO 1 EM1i[: CONTRACTOR <br /> TF�ACTOF; ALTERNATE: MATERIALS: ANY BACK FµIEmL_ MATERIAL. NOT MEETING T[IF. C5 < �� <br /> INTERFERE WITH TETE NORMAL OPERATION OF THE-:,IR BUSINESS OR ANY TANK hIOI_E THE COMPANY DEEMS (`a NECESSARY It} .�[IORE. SPECIFICATION OF APPROVED MATERIAE_. APPROVAL OF THE: COMPANY C/� i (6 <br /> ENJOYMENT OF' THEIR PROPERTY. SF-TOULD ANY' DAMAGE OCCUR I EF'RESENTATIVE IS NEEDED PRIOR TO USING ALTERNATE MATERIALS CONCRETE TANK SLAB WILL. BE ET" MINIMUM THICKNESS, SHOWN IN c c� <0 <br /> a e - (USE OF CERTAIN MATE=F�IAE_.S WILL REQUIRE THE:_ COMPANY TO OBTAIN _ _ �nz <br /> DUE. -10 THIS WORK, -Th-IE CONTRACTOR SHALL MAKE: REPAIRS AS ( � APPROVAL <br /> - Y DETAILS, REINFORCED PER DETAILS, WI TN A 45d MITER ON ALL z Ln 0 imp <br /> - WRITTEN AF T ROVAL CHET. TANK MANUFACTURER TO PRESERVE THE TANK <br /> REQUIRED -TO THE SATISFACTION OF., THE.. COMPANY CORNERS. TANK SLAB SHALL EXTEND A MINIMUM OF 24BEYOND < ��° �t _ <br /> WARRANT)"). THEA. -TANK HOLE: MUST BE SHORED OF SIDE SLOPED A S -- c-< <br /> REPRESENTATIVE.rA-EIVE.:. PRO IEC T COMPLETED WORK FROM DAMAGE UNTIL <br /> _ TEST <br /> .. _ PROJECTED LIMIT OF THE COVERED TANKS. SLAB IS TO BE A -�-� �� �� <br /> IT IS ACCEPTED BY LLFETF: COMPANY REPRESENTATIVE. <br /> 04. 0E 1_ N _�.-) N OF _ TANKS^ _ MEN WILL HAVE TO EmN TE F� CO COMPACT ANL? TEST TI-IE BACKFILL., UNIFORM THICKNES a, COLOR 1-O MATCH EXISTING CONCRETE, <br /> ALL ALTERNATE MATERIAL MUST BE: COMPACTED -TO A MINIMUM Of= <br /> SUPERVISION_---- ` . m N�: __C C , ,F E IN6 aEl 1:a ALL CONTRACTOR'S ARE ALL TANK MANWAY ARE TO BE <br /> LIFTING MOVING: WHEN LIf= TING OR MOVING ANY FRP TANK 9O RELATIVE DENSITY (ASTM [_7 1357 -TCT). CONTRACTOR IS TO FURNISH RAISED 2" ABOVE ADJACENT SLAB GRADES WITH A 40" MINIMUM <br /> RESPONSIBLE FOR PROGRESS, EXECUTION AND QUALITY OF THEIR SUB ALVWAY..` USE PROPERLY SIZED EQUIPMENT AND LIFT BY -THE THE: COMPANY REPRESENTATIVE WITH A CERTIF=ICATION OF COMPACTION 7 m <br /> >� TRANSITION. PERIMETER FILL BOXES ON TANK SLAB (SAMPLE WELLS <br /> CONTRACTOR'S WORK AND SHALE_ COORDINATE:: AND EXPEDITE LIFTING LUG(S), PER MANUFACTORIES RECOMMENDATIONS. FROM A REGISTERED SOIL, ENGINEER. <br /> OR MONITORS) AETk=: TO BE RAISED 1" ABOVE GRADE WITH A DESIRED <br /> PROCUREMENT OF MATERIALS AND PERFORMANCE OF' WORK OF 18" TRANSITION. BOTTOM OF TT-1E SLAB IS IC7 BE THICKENED TO THE <br /> RESPECTIVE TRADES AND SUES Ct NIRA(µ TORS. ITiE COMPANY REPRESENTATIVE IS RESPONSIBLE. FOR PROVIDING THE �°T � °WTp `E <br /> NEVER ROLL OR USE CABLES OR CHAINS AROUND ANY FRP TANK. - - BOTTOM OF THE FILL BOXT_.S - 12 MAXIMUM. <br /> CONTRACTOR IS -TO HAVE:: THE SAME; QUALIFIED RESPONSIBLE SET ON SMOOTH GROUND, FREE. OF ROCKS AND FOREIGN OBJECTS EXACT INSTALLATION SPECIFICATION FOR ALTERNATE: MATERIALS - �fiwy' 4-� ' QiW�, <br /> SEE UNDERGROUND TANK AND PIPING INSTALLATION MANI..TAL FOR �M - ��E=�<;r <br /> REPRESENTATIVE, WF--IO UNDERSTANDS AND SPEAKS ENGLISH ,� . � . <br /> _ _ _ _ <br /> SPECIFICATIONS ON INSTALLATION OF � � �� G. <br /> �� :2 <br /> SLAB I� TO MATCH EXISTING COLOR (BRAND NEW SITE PREFER I C) BE <br /> FL_L.)EN T[_Y, ON EkEE. JOB AT ALL -TIMES, INCLUDING fHE_. TIME;_ C - - - _ - IN NATIJ[ AI_ COLOR) AND TEXTURE:D WITH ANON- SKID SURFACE. <br /> ( ETI C Al, (3 (I <br /> CHOKING: TANKS ARE TO CSF CHOKED UNTIL READY FOR <br /> - INSTALLATION. IF WINDY CONDITIONS EXIST OR ARE EXPECTED, ;_. c <br /> FOR ESTABLISHING AND MAINTAINING ALL LINES, LEVELS AND WOOD FLOAT, STEEL �T��RO'JVFI_, �FF1EN BRUSH WI-1-1-1 BROOM � .„ �� ,T;IE <br /> STONE AND GRAVEL_ CRUSHING �w �` <br /> TIE TANKS DOWN USING MINIMUM 1/2 INCH NYLON OR HEMP ROPE - c ' <br /> GRADES SHOWN ON THE FLAN. OR C)-TF-iE�RWISl� [REQUIRED, .SAND <br /> PERPENDICULAR TO EHE L..E_NC'�TH OF 'THE- -TANKS.) <br /> OVER EACH TANK AND TIL_ IO STAKES OF ADf_QIJATF. SIRE_ IO SAND WITFT WATER COMPACTION <br /> ALI_, CONTRACTORS ARE TO MAINTAIN THE SITE IN AN - ALL MANWAY I__IE)S MUST" BE PRIMED. <br /> PREVENT_ MOVFMEN I OF' THE TANKS. ' n �, r <br /> ACCESSIBLE CONDITION FOR OTTiEF� TRADES AND CON T[�A( TORS. CONTROLLED DENSITY FILL_ (CDFm) <br /> ACCEPTABLE_CHOKING MATERIALS ARE: USED TIRES OR RUBBER <br /> SAE ETY _ ALL CON TRAC IORS SHALL PERFORM THE WORK IN ACCORD- <br /> BLOCKS � <br /> . ROCKS, WOOD AND OTHER RIGID MATERIALS ARE <br /> ANCE=: WITH SAFE PRACTICES, -CAKING ALL REASONABLE PRECAUTIONS UNACCEPTABLE CHOCKING. � C� I N I� I:_C _I_.f �N �j /�__I E _��__E ) N <br /> TO PROTECT _[HE FACILITY AND ADJACENT FACILITIES, <br /> WORKMEN AND "THE PUBLIC AND PROPERTY, WHERE REASONABI. Y OPENINGS: TANK OPENINGS ARE TO REMAIN CLOSED BUT 05 2 DRY Y E--1 E__E� CONDITION - - - --- - ------- <br /> NECESSARY, BARRIERS, GUARDS, 'TEMPORARY BRIDGES" LIGHTS AND VENTED AT ALL TIMES EXCEPT DURING THE:: I-EST. ---------------_-------- <br /> WATCHMEN SHALL BE USED. WF-IILEV: ON THE PREMISES OF. ]'HE COMPANY SHALL BE SCHEDULED PERFORMED PER ALL LOCAL AND STATE <br /> OR ITS AFFILIATES, ALL OF TETE COMPANY'S SAFETY RULES SHALL DAMAGE=-:__ IF TANK IS DAMAGED, DO NOT ATTEMPT REPAIRS. � REQUIREMENTS. MUST COMPLY WITH PIECING TEST REQUIREMENTS SPECIFIED IN <br /> CONTACT COMPANY REPRFSE.NFATIVE FOR REPAIRS OR TANKS WITHOUT BACK FILL TO ,SUB GRADE MUST BE BALLASTED IF <br /> BE STRICTLY OBSERVED; IN PAR-I-ICULAR, NO SMOKING SHALL _ _ - m __ -., ry � CITY OF I._OCKE::f=ORLI REVISED LJNC�E:_Rt�F�OUNL� STORAGE TANK (l,1ST) AND <br /> REPLACEMENT, PER MANUFACTURER'S APPROVALS, 1_NERF IS ANY t;l-TANTE THAT SURFACE OR SUBSURFACE WATER <br /> BE ALLOWED ON COMPANY PROPERTY WHEN GASOLINE_ IS PRESENT WILL ENTER TFIE TANK HOLE TO A DEPTH OF 23" OR GREATER PIPING PERMANENT CLOSURE: REQUIREMENTS". <br /> ON THE SITE. CONTRACTOR SHALL NOT PERFORM OR PERMIT ABOVE THE BOTTOM OF THE TANKS. CAUTION -- DO NOT CONTRACTOR TO MAINTAIN A MONITORING EOG BOOK FOR THEIR INSTALLED <br /> ANY ACT' ON -THE PREMISES OF T1E COMPANY OR IT'S BALLAST TANKS UN1- L. BACK -ILL IS 1�O T1 ETOP OF TANKS® EQUIPMENT AND TESTING. EXAMPLE. GAUGES, ANNLLARS, ETC <br /> AF_FIT_IATEES WHICH INVOLVES A FIRE OR EXPLOSION HAZARD, EXCEPT IN WET HOLE PROCEDURES. Ya"O VACUUM MONITORING TUBING SHOULD BE EXTEND LONG ENOUGFI FOR <br /> INCLUDING WELDING, TORCH CUT-TING AND DISPOSAL OF DEBRIS TESTING PURPOSES AND NOT BEING OBSTRUCTED BY ANY OF THE 46 <br /> BY BURNING WITHOUT PRIOR WRITTEN CONSENT OF THE COMPANY, 05. 0 INS] AI__E_._A FION OF E ANKS COMPONENTS. � <br /> La_�^�._.._NOT_ SANDBLAST, CUT OR ENTER TANK: ON THE SITE, UNLESS u <br /> M Ga <br /> APPROVED BY AI_.[_ AFFECTED AGENCIES AND "TE_SORO" <br /> [W__TITNC_. SETT TANKS ON PREPARED BED AND TILT 3" MAX. TOWARD TO <br /> PRODUCT FILL SL.,1MP AS REQUIRED BY TESORO REPRESENTATIVE. CONSULT LnMANU <br /> IF YOU FIND FREE. RODUC,T ON ]-HE WATER i_ABLE, IN HARE? MANUFACTURER FOR APPROVAL. <br /> a �_ � I I <br /> I, OR W <br /> SOLID POCKS WHEREVER, �` c� cca <br /> AFEGUARD_._.THE SITE AND cv <br /> IMMEDIATELY CONT-ACI TETE. COMPANY REPRESENTATIVE FO[y � ' <br /> _3 o ,� <br /> ASSI`;TANCE. a Q F_... Lli <br /> z <br /> DO NOT LEAVE.: SITE UNATTENDED UNTIL RELEASED BY THEp,> ., Ll,J <br /> �a <br /> COMPANY REPRESENTATIVE. NOTIFY THE FIRE DEPARI-MENT IF � � � <br /> ANY PO`�SIBILI TY OF. IGNITION. ALL FREE PRODUCT WILL BE: �� � °'Cam c� <br /> CEJ E- 0 <br /> REMOVED FROM THE SITE AT THE DIRECTION OF THE COMPANY0) r <br /> REPRESENTATIVE. <br /> __`° a-- V) raw: ra_ < <br /> IF CONTAMINATED SOIL IS ENCOUNTERED, IMMEDIATELY CONTACT- <br /> THE COMPANY REPRESENTATIVE.. FOR ASSISTANCE. CONTRACTOR SHALL <br /> COMPLY WITH ALL CURRENT NEPA AND LOCAL REGULATIONS, MATERIA[_ DRAWN <br /> SI-IALL BE: HANDLED PER ALL STATE & LOCAL REQUIREMENTS AND ALL ER <br /> _,....._._.,.._...........Fr,TEc;aFT - <br /> ACTION SHALL BET. COORDINATED WITH THE TE SORO" REPRESENTATIVE, <br /> _._.....__ _ _._........_ <br /> 02a 0 REMOVAL OF EXISTING 'TANKS SHT. TITLE <br /> _._..__ PIPING <br /> & TANK NOTES <br /> ')OB NUMBER <br /> SEE SHEET TK1--D FOR REMOVAL OF OLD TANKS <br /> SHEET <br /> 1" K <br /> 1 I <br /> E <br /> m................ <br /> x'. <br /> --------------- ----------------- ........... ........... .......... ................ ............................................---__ ---_---------------------------------------- <br /> i <br />