Laserfiche WebLink
..... ..... <br /> � REV. PER SAN JOAQUIN COUNTY <br /> �q\ ENVIRONMENTAL HEALTH DEPT, <br /> i03 12 2012 ER'. <br /> ...BEV AN JC3A I UC <br /> ENVIRONMENTAL. HEALTH DEPT. <br /> 0P/29/201ER <br /> Y� TTTTATfA,A f7 « <br /> L13 'AR()&:M6TAE. HEA,DDIPT. <br /> t1Tt,`a�E�`ACIA? E.Tt <br /> E_NE I`� AL NC <br /> 1. FOR ALL TANK, PIPING, & SUMP TESTING AND MONITORING SEE, REQUIRED -TESTING <br /> NO-FES. <br /> A-\2. BACK FILL MAY BE SAND, PEA GRAVEL, 3/4" ROUNDED AGGREGATE IN ACCORDANCE WITH <br /> ALL., MANUFACTURER'S, CURRENT INSTALLATION INSTRUCTIONS. <br /> 3. THE DESIGN, ASSEMBLY AND TESTING OF THE PIPING SYSTEM SHALL, BE PER <br /> MANUFACTURER'S RECOMMENDATIONS AND IN CONFORMANCE WITH -TINE.. APPLICABLE <br /> SECTION OF' ANSI--31 AMERICAN NATIONAL. STANDARD CODE FOR PRESSURE PIPING, AND <br /> NEPA 30 FLAMMABLE AND COMBUSTIBLE LIQUID CODE: OR AS REQUIRED BY THE SAN <br /> JOAQUIN COUNTY FIRE DEPARTMENT, 1 <br /> 4, ALL ASSOCIATED PIPING SHALL BE PROTECTED FROM CORROSION. __.--___._._, <br /> ! 5. TANK SLABS SHALL EXTEND A MINIMUM OF TWO FEET BEYOND ALL EDGES OF THE <br /> TANK. <br /> 6. ALL_ VAPOR, VENT & PRODUCT PIPING SI-PALL.. BE INSTALLED @ 1/4" MINIMUM PER <br /> FOOT AND SLOPE BACK TO THE TANK. <br /> 7, ALL MANHOLES SHALL_ BE LIQUID TIGHT, SECURABLE, & TRAFFIC RATED AND 1" OR 2" <br /> MINIMUM ABOVE GROUND. <br /> B, ALL. TANKS ARE METHANOL COMPATIBLE. <br /> 9. ALL PIPING SYSTEMS ARE PRESSURED. <br /> 10• ALL DISPENSING DEVICES SHAL...L BE U.L. LISTED, <br /> 11• THE DISPENSERS SHALL_ BE NOT CLOSER THAN 10 FEET FROM ANY 13UII-DING AND AT <br /> LEAST 20 FEET' FROM ANY SOURCE OF LGNITTON. <br /> 12. NO TANKS OR PIPING SFTALL. BE CONCEALED PRIOR TO SAN JOAQUIN COUNTY FIRE <br /> DEPARTMENT APPROVAL, <br /> 13, ALL TEST GAUGES SHALL BE PROVIDED BY TETE INSTALLER, THE GAUGES SHALL. BE. <br /> CALIBRATED IN 1/2 PSI INCREMENTS, MONITOR AND LOG IT WHEN IT IS UNDER PRESSURE, <br /> 14. TFiE SAN JOAQUIN COUNTY FIRE DEPARTMENT WILL INSPEC F/APPROVE FINAL OCCUPANCY <br /> SIGN—OFF. ELD PIPING TEST & PRODUCT TANKS, ALf_ REQUIREMENTS SHALL BE <br /> COMPLETED PRIOR TO FINAL_ OCCUPANCY CLEARANCE, THE FIRE DEPARTMENT SHALL BE: Z �� ca <br /> < m <br /> GIVEN AT LEAST 48 HOURS MINIMUM NOTICE PRIOR TO ALL INSPECTIONS. Ln <br /> 72 <br /> 15. TURBINE SHUTDOWN IS REQUIRED ON ALL TANK ANNULAR AND PIPING SUMP SENSORS. <br /> F UIRE,D FOR DISPENSER CONTAINMENT SENSOR. <br /> L�.1 0ccs <br /> TURBINE SHUTDOWN IS REQUIRED <br /> c.D <br /> ® TIVATE MIEN TANK GAUGE DETECTS AN OVERFILL_ <br /> . , <br /> I N OF OVELF 'TL,TLa OF EACH TANK'S CAPACITY. M <br /> 1 L OVERFILL ALARM SHALL, AC <br /> CONDIT O <br /> 17. NO DISPENSING DEVICE SHALL. BE. LOCATED SUCH THAT THE NOZZLE, WHEN THE HOSE 0 0 <br /> L4. <br /> IS FULLY EXTENDED, WILL NOT REACH WITHIN FIVE FEET OF THE BUILDING OPENINGS. <br /> � <br /> CD 0 <br /> (GEC SEC. ?203.1.*&} (� �... c <br /> 1E3. NO SMOKING" SIGNS ST~TALI_ BE POSTED PER CFC SE.C;.22()S.CT.1. -j Iji� M <br /> ! <br /> < c) 0 <br /> � <br /> 19. SIGNS PROHIBITING SMOKING, PROHIBITING DISPENSING OF= FUEL_ INTO UNAPPROVED <br /> �Q <br /> RF UIRING ENGINES TO BE STOPPED DURING FUELINGSIGN SHALL <br /> CONTAINERS, AND <br /> NSPICUOUSLY POSTED WITHIN SIGHT OF EACH DISPENSER (CFC 2205.6) z <br /> ol <br /> BF: GO c7 <br /> n 0 Ld <br /> 20. A 2--A:20-8:C FIRE EXTINGUISHER INSTALLED WI THIN 75 FEET OF ANY PUMP, <br /> i DISPENSER, OR FILL PIPE OPENING, (CFC SEC.2205.5) 1 00< <br /> <. OVERHEAD TYPE DISPENSERS � as o rL <br /> 21. A LISTED HOSE NOZZL_F. VALVE. .,+FIAL.L BE PROVIDED, O _ � �� <br /> rL <br /> SHALL BE AUTOMATIC CLOSING WITH A A LATCH OPEN DEVICE. SELF SERVICE <br /> DISPENSERS SHALL BE EQUIPPED WITH: <br /> 1. AN INTEGRAL LATCH OPEN DEVICE: <br /> 2. A VAPOR RECOVERY NOZZLE INCORPORATING AN INSERTION <br /> INTERLOCK DEVICE THAT CAUSES SHUT DOWN UPON DISCONNECTION FROM FILL PIPE <br /> 3, A NOZZLE DESIGNED 'TO BE RETAINED IN THE:; FILL PIPE. DURING FILLING OPERATION <br /> 22. AN APPROVED EMERGENCY SHUTOFF IMPACT VALVE, INCORPORATING A FUSIBLE LINK TO <br /> CLOSE AUTOMATICALLY IN THE EVENT OF SEVERE IMPACT OR FIRE EXPOSURE, SHALL BE <br /> RIGIDLY MOUNTED AND CONNECTED BY A UNION IN THE DISPENSING SUPPLY LINE AT THE <br /> BASE OF' EACH DISPENSER. THE SHEAR SECTION OF THE VALVE SHALL_ BE MOUNTED <br /> FLUSH WITH THE SURFACE UPON WHICH THE, DISPENSER IS MOUNTED. (CFC 2205,2.1.3) <br /> 23, A FIBER LINER SHALL BE PLACED BETWEEN THE TANK(S) AND THE EXCAVATION TO <br /> PREVENT INFILTRATION OF NATIVE SOIL IN <br /> BACK FILL. MATERIAL. IF REQUIRED BY <br /> SOILS REPORT OR LOCAL CONDITION, <br /> 24. INSTALLATION AND TESTING SHALL MEET ALI_ OF THE REQUIREMENTS OF CCR SEC. 2635. <br /> 25. ALL METAL IN DIRECT CONTACT WIT}-{ BACK FILL._ MATERIAL. SHALL. BE PROTECTED <br /> AGAINST CORROSION. <br /> 26UNDER NO CIRCUMSTANCES SHALL ANY EQUIPMEN T SUBSTITUTIONS TAKE PLACE <br /> WITHOUT A WRITTEN REQUEST TO THE. SAN JO <br /> AQLJIN COUNTY ENVIRONMENT HEALTH <br /> DEPARTMENT AND WRITTEN APPROVAL_ GRANTED. <br /> t <br /> 27. UNDER NO CIRCUMSTANCES WILL NEW TANKS BE: INSTALLED UNTIL THE CONFORMATION <br /> THAT NO AUTHORIZED RELEASE. (TANK) HAS OCCURRED FROM EXISTING FUEL_ SYSTEMS. <br /> ANY CONTAMINATION PRESENT MIDST BE EXCAVATED TO NON DETECTABLE. LEVELS. IF <br /> THIS CANNOT BE ACHIEVED WRITTEN PERMISSION FROM THE SAN JOAQUIN COUNTY <br /> ENVIRONMENT HEALTH DEPARTMENT MUST BE GRANTED PRIOR TO iNSTAL.t_AT'ION OF NEW <br /> TANKS WITHIN THE EXISTING EXCAVATION. THIS PERMISSION IS CONDITIONAL_ UPON THE Cl � <br /> DEMONSTRATED ABILITY IT MITIGATE THE SITE WITH THE NEW TANKS INSTALLED. <br /> 0) <br /> 28, ELD TO BE PERFORMED ON DRY TANK. THE METHOD USED BY THE TANK TESTING <br /> COMPANY MUST BE LISTED ON THE CALIFORNIA WATER RESOURCES CONTROL BOARD'S In <br /> LIST OF LEAK DETECTION EQUIPMENT AND METHODS FOR UNDERGROUND STORAGE — I,._� � � � <br /> TANKS, TEST MUST BE PERFORMED BY A CALIFORNIA LICENSED TANK FESTER FOR THE cid � 0) w <br /> SPECIFIC IFIL METHOD UTILIZED. TI iF LEST,RESULTS TS MUST FT <br /> SENT fIRF C 1 L Y ,TO TF TE <br /> _, t LCA I (D C t <br /> OFFICE OF -THE SPN JOAQUIN COUNTY ENVIRONMENT FiFAL_TLi DEPARTLE NT,? FROM THE Lmm c�1 � <br /> TESTING COMPANY"EiCar rii� ' P_...iiFiCyN:. _. - a. c� <br /> C2p x I"_ Y <br /> 2.9, A TANK MONITORING SYSTEM CERTIFIED TO MEET THE REQUIREMENTS OF A TANK � � � A � 0 <br /> INTEGRITY TEST(� 1AL_I_ N(�f f E SUBSTITUTED FOR THE ABOVE TEST, <br /> _., _� <br /> Q) 0 <br /> 2 <br /> BEFORE ABANDONING ANY MONITORING WELLS A �;EPERATE WELL PERMIT MUST FIRST <br /> � <br /> :.30. Ltj <br /> BE OBTAINED FROM THE CITY OF LOCKEFORD PERMITS CENTER. � � c C. U) <br /> 0 0 0 <br /> 31, PER 2010 CFC SECTION 2205 CLASS 1 AND 11 LIQUIDS SHALL BE TRANSFERRED FROM � 0_. < <br /> TANKS BY MEANS OF' FIXED PUMPS DESIGNED AND EQUIPPED "TO ALLOW CONTROL <br /> FLOW AND TO PREVENT LEAKAGE OR ACCIDENTAL_. DISCHARGE, THEREFORE. LIQUID <br /> SPILLS SHALL BE CONTAINED BY DISPENSER PUMPS AND A '1/2" DOOR SILL_ SHALL BE <br /> PROVIDED TO DISPENSER PREVENT LIQUID FLOW INTO BUILDINGS, ALSO AN ATTENDANT <br /> SHALL GIVE IMMEDIATE ATTENTION AND THE STATE REQUIRED EMERGENCY RESPONSE" <br /> PLAN, (ON FILE AT THE. STATION AT ALL TIMES.) <br /> DRAWN <br /> ER <br /> 32. A 2" MINIMUM CLEARANCE SHALL BE MAINTAINED„ BOTH HORIZONTALLY AND <br /> CHECKEDVERTICALLY, BETWEEN FLEXIBLE AND FIBERGLASS PIPING. <br /> DATE: <br /> 33, SEE SHEET TK2. 2 FOR ADDITIONAL._ NOTES. <br /> 01/16/2012 <br /> 34. ELD TEST(S) T-O BE PERFORMED TO TANKS AND PIPING, PRIOR TO BACK FILL_ ELD PRE <br /> TEST IS RECOMMENDED. (TESORO WILL. ONLY BE RESPONSIBLE FOR TETE FINAL_ ELD SI-Ir. TITLE <br /> "„ GENERAL <br /> ITST) <br /> . <br /> NOTES <br /> 4, <br /> $MEET <br /> �ti F3� <br /> Cy <br /> i ° <br /> ..... <br /> .......... .. <br /> ------ __--_ ____________ m__________ ___ ___ _- __ _____._____ _ ___ ______ ____ ____ _______ __ _ ___ _ m„_____ ________ __ ___ ___________ _____ _ ______ <br /> ---------- ....... ------------- <br />