<br /> 1. FOR ALL TANK, PIPING, & SUMP TESTING AND MONITORING SEE, REQUIRED -TESTING
<br /> NO-FES.
<br /> A-\2. BACK FILL MAY BE SAND, PEA GRAVEL, 3/4" ROUNDED AGGREGATE IN ACCORDANCE WITH
<br /> ALL., MANUFACTURER'S, CURRENT INSTALLATION INSTRUCTIONS.
<br /> 3. THE DESIGN, ASSEMBLY AND TESTING OF THE PIPING SYSTEM SHALL, BE PER
<br /> MANUFACTURER'S RECOMMENDATIONS AND IN CONFORMANCE WITH -TINE.. APPLICABLE
<br /> SECTION OF' ANSI--31 AMERICAN NATIONAL. STANDARD CODE FOR PRESSURE PIPING, AND
<br /> NEPA 30 FLAMMABLE AND COMBUSTIBLE LIQUID CODE: OR AS REQUIRED BY THE SAN
<br /> JOAQUIN COUNTY FIRE DEPARTMENT, 1
<br /> 4, ALL ASSOCIATED PIPING SHALL BE PROTECTED FROM CORROSION. __.--___._._,
<br /> ! 5. TANK SLABS SHALL EXTEND A MINIMUM OF TWO FEET BEYOND ALL EDGES OF THE
<br /> TANK.
<br /> 6. ALL_ VAPOR, VENT & PRODUCT PIPING SI-PALL.. BE INSTALLED @ 1/4" MINIMUM PER
<br /> FOOT AND SLOPE BACK TO THE TANK.
<br /> 7, ALL MANHOLES SHALL_ BE LIQUID TIGHT, SECURABLE, & TRAFFIC RATED AND 1" OR 2"
<br /> MINIMUM ABOVE GROUND.
<br /> B, ALL. TANKS ARE METHANOL COMPATIBLE.
<br /> 9. ALL PIPING SYSTEMS ARE PRESSURED.
<br /> 10• ALL DISPENSING DEVICES SHAL...L BE U.L. LISTED,
<br /> 11• THE DISPENSERS SHALL_ BE NOT CLOSER THAN 10 FEET FROM ANY 13UII-DING AND AT
<br /> LEAST 20 FEET' FROM ANY SOURCE OF LGNITTON.
<br /> 12. NO TANKS OR PIPING SFTALL. BE CONCEALED PRIOR TO SAN JOAQUIN COUNTY FIRE
<br /> DEPARTMENT APPROVAL,
<br /> 13, ALL TEST GAUGES SHALL BE PROVIDED BY TETE INSTALLER, THE GAUGES SHALL. BE.
<br /> CALIBRATED IN 1/2 PSI INCREMENTS, MONITOR AND LOG IT WHEN IT IS UNDER PRESSURE,
<br /> 14. TFiE SAN JOAQUIN COUNTY FIRE DEPARTMENT WILL INSPEC F/APPROVE FINAL OCCUPANCY
<br /> SIGN—OFF. ELD PIPING TEST & PRODUCT TANKS, ALf_ REQUIREMENTS SHALL BE
<br /> COMPLETED PRIOR TO FINAL_ OCCUPANCY CLEARANCE, THE FIRE DEPARTMENT SHALL BE: Z �� ca
<br /> < m
<br /> GIVEN AT LEAST 48 HOURS MINIMUM NOTICE PRIOR TO ALL INSPECTIONS. Ln
<br /> 72
<br /> 15. TURBINE SHUTDOWN IS REQUIRED ON ALL TANK ANNULAR AND PIPING SUMP SENSORS.
<br /> F UIRE,D FOR DISPENSER CONTAINMENT SENSOR.
<br /> L�.1 0ccs
<br /> TURBINE SHUTDOWN IS REQUIRED
<br /> c.D
<br /> ® TIVATE MIEN TANK GAUGE DETECTS AN OVERFILL_
<br /> . ,
<br /> I N OF OVELF 'TL,TLa OF EACH TANK'S CAPACITY. M
<br /> 1 L OVERFILL ALARM SHALL, AC
<br /> CONDIT O
<br /> 17. NO DISPENSING DEVICE SHALL. BE. LOCATED SUCH THAT THE NOZZLE, WHEN THE HOSE 0 0
<br /> L4.
<br /> IS FULLY EXTENDED, WILL NOT REACH WITHIN FIVE FEET OF THE BUILDING OPENINGS.
<br /> �
<br /> CD 0
<br /> (GEC SEC. ?203.1.*&} (� �... c
<br /> 1E3. NO SMOKING" SIGNS ST~TALI_ BE POSTED PER CFC SE.C;.22()S.CT.1. -j Iji� M
<br /> !
<br /> < c) 0
<br /> �
<br /> 19. SIGNS PROHIBITING SMOKING, PROHIBITING DISPENSING OF= FUEL_ INTO UNAPPROVED
<br /> �Q
<br /> RF UIRING ENGINES TO BE STOPPED DURING FUELINGSIGN SHALL
<br /> CONTAINERS, AND
<br /> NSPICUOUSLY POSTED WITHIN SIGHT OF EACH DISPENSER (CFC 2205.6) z
<br /> ol
<br /> BF: GO c7
<br /> n 0 Ld
<br /> 20. A 2--A:20-8:C FIRE EXTINGUISHER INSTALLED WI THIN 75 FEET OF ANY PUMP,
<br /> i DISPENSER, OR FILL PIPE OPENING, (CFC SEC.2205.5) 1 00<
<br /> <. OVERHEAD TYPE DISPENSERS � as o rL
<br /> 21. A LISTED HOSE NOZZL_F. VALVE. .,+FIAL.L BE PROVIDED, O _ � ��
<br /> rL
<br /> SHALL BE AUTOMATIC CLOSING WITH A A LATCH OPEN DEVICE. SELF SERVICE
<br /> DISPENSERS SHALL BE EQUIPPED WITH:
<br /> 1. AN INTEGRAL LATCH OPEN DEVICE:
<br /> 2. A VAPOR RECOVERY NOZZLE INCORPORATING AN INSERTION
<br /> INTERLOCK DEVICE THAT CAUSES SHUT DOWN UPON DISCONNECTION FROM FILL PIPE
<br /> 3, A NOZZLE DESIGNED 'TO BE RETAINED IN THE:; FILL PIPE. DURING FILLING OPERATION
<br /> 22. AN APPROVED EMERGENCY SHUTOFF IMPACT VALVE, INCORPORATING A FUSIBLE LINK TO
<br /> CLOSE AUTOMATICALLY IN THE EVENT OF SEVERE IMPACT OR FIRE EXPOSURE, SHALL BE
<br /> RIGIDLY MOUNTED AND CONNECTED BY A UNION IN THE DISPENSING SUPPLY LINE AT THE
<br /> BASE OF' EACH DISPENSER. THE SHEAR SECTION OF THE VALVE SHALL_ BE MOUNTED
<br /> FLUSH WITH THE SURFACE UPON WHICH THE, DISPENSER IS MOUNTED. (CFC 2205,2.1.3)
<br /> 23, A FIBER LINER SHALL BE PLACED BETWEEN THE TANK(S) AND THE EXCAVATION TO
<br /> PREVENT INFILTRATION OF NATIVE SOIL IN
<br /> BACK FILL. MATERIAL. IF REQUIRED BY
<br /> SOILS REPORT OR LOCAL CONDITION,
<br /> 24. INSTALLATION AND TESTING SHALL MEET ALI_ OF THE REQUIREMENTS OF CCR SEC. 2635.
<br /> 25. ALL METAL IN DIRECT CONTACT WIT}-{ BACK FILL._ MATERIAL. SHALL. BE PROTECTED
<br /> AGAINST CORROSION.
<br /> 26UNDER NO CIRCUMSTANCES SHALL ANY EQUIPMEN T SUBSTITUTIONS TAKE PLACE
<br /> WITHOUT A WRITTEN REQUEST TO THE. SAN JO
<br /> AQLJIN COUNTY ENVIRONMENT HEALTH
<br /> DEPARTMENT AND WRITTEN APPROVAL_ GRANTED.
<br /> t
<br /> 27. UNDER NO CIRCUMSTANCES WILL NEW TANKS BE: INSTALLED UNTIL THE CONFORMATION
<br /> THAT NO AUTHORIZED RELEASE. (TANK) HAS OCCURRED FROM EXISTING FUEL_ SYSTEMS.
<br /> ANY CONTAMINATION PRESENT MIDST BE EXCAVATED TO NON DETECTABLE. LEVELS. IF
<br /> THIS CANNOT BE ACHIEVED WRITTEN PERMISSION FROM THE SAN JOAQUIN COUNTY
<br /> ENVIRONMENT HEALTH DEPARTMENT MUST BE GRANTED PRIOR TO iNSTAL.t_AT'ION OF NEW
<br /> TANKS WITHIN THE EXISTING EXCAVATION. THIS PERMISSION IS CONDITIONAL_ UPON THE Cl �
<br /> DEMONSTRATED ABILITY IT MITIGATE THE SITE WITH THE NEW TANKS INSTALLED.
<br /> 0)
<br /> 28, ELD TO BE PERFORMED ON DRY TANK. THE METHOD USED BY THE TANK TESTING
<br /> COMPANY MUST BE LISTED ON THE CALIFORNIA WATER RESOURCES CONTROL BOARD'S In
<br /> LIST OF LEAK DETECTION EQUIPMENT AND METHODS FOR UNDERGROUND STORAGE — I,._� � � �
<br /> TANKS, TEST MUST BE PERFORMED BY A CALIFORNIA LICENSED TANK FESTER FOR THE cid � 0) w
<br /> SPECIFIC IFIL METHOD UTILIZED. TI iF LEST,RESULTS TS MUST FT
<br /> SENT fIRF C 1 L Y ,TO TF TE
<br /> _, t LCA I (D C t
<br /> OFFICE OF -THE SPN JOAQUIN COUNTY ENVIRONMENT FiFAL_TLi DEPARTLE NT,? FROM THE Lmm c�1 �
<br /> TESTING COMPANY"EiCar rii� ' P_...iiFiCyN:. _. - a. c�
<br /> C2p x I"_ Y
<br /> 2.9, A TANK MONITORING SYSTEM CERTIFIED TO MEET THE REQUIREMENTS OF A TANK � � � A � 0
<br /> INTEGRITY TEST(� 1AL_I_ N(�f f E SUBSTITUTED FOR THE ABOVE TEST,
<br /> _., _�
<br /> Q) 0
<br /> 2
<br /> BEFORE ABANDONING ANY MONITORING WELLS A �;EPERATE WELL PERMIT MUST FIRST
<br /> �
<br /> :.30. Ltj
<br /> BE OBTAINED FROM THE CITY OF LOCKEFORD PERMITS CENTER. � � c C. U)
<br /> 0 0 0
<br /> 31, PER 2010 CFC SECTION 2205 CLASS 1 AND 11 LIQUIDS SHALL BE TRANSFERRED FROM � 0_. <
<br /> TANKS BY MEANS OF' FIXED PUMPS DESIGNED AND EQUIPPED "TO ALLOW CONTROL
<br /> FLOW AND TO PREVENT LEAKAGE OR ACCIDENTAL_. DISCHARGE, THEREFORE. LIQUID
<br /> SPILLS SHALL BE CONTAINED BY DISPENSER PUMPS AND A '1/2" DOOR SILL_ SHALL BE
<br /> PROVIDED TO DISPENSER PREVENT LIQUID FLOW INTO BUILDINGS, ALSO AN ATTENDANT
<br /> SHALL GIVE IMMEDIATE ATTENTION AND THE STATE REQUIRED EMERGENCY RESPONSE"
<br /> PLAN, (ON FILE AT THE. STATION AT ALL TIMES.)
<br /> DRAWN
<br /> ER
<br /> 32. A 2" MINIMUM CLEARANCE SHALL BE MAINTAINED„ BOTH HORIZONTALLY AND
<br /> CHECKEDVERTICALLY, BETWEEN FLEXIBLE AND FIBERGLASS PIPING.
<br /> DATE:
<br /> 33, SEE SHEET TK2. 2 FOR ADDITIONAL._ NOTES.
<br /> 01/16/2012
<br /> 34. ELD TEST(S) T-O BE PERFORMED TO TANKS AND PIPING, PRIOR TO BACK FILL_ ELD PRE
<br /> TEST IS RECOMMENDED. (TESORO WILL. ONLY BE RESPONSIBLE FOR TETE FINAL_ ELD SI-Ir. TITLE
<br /> "„ GENERAL
<br /> ITST)
<br /> .
<br /> NOTES
<br /> 4,
<br /> $MEET
<br /> �ti F3�
<br /> Cy
<br /> i °
<br /> .....
<br /> .......... ..
<br /> ------ __--_ ____________ m__________ ___ ___ _- __ _____._____ _ ___ ______ ____ ____ _______ __ _ ___ _ m„_____ ________ __ ___ ___________ _____ _ ______
<br /> ---------- ....... -------------
<br />
|