My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1977-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
25100
>
4400 - Solid Waste Program
>
PR0504216
>
CORRESPONDENCE_1977-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 11:03:20 AM
Creation date
12/24/2020 9:19:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1977-2017
RECORD_ID
PR0504216
PE
4430
FACILITY_ID
FA0006125
FACILITY_NAME
ESCALON CITY DUMP
STREET_NUMBER
25100
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
24709015
CURRENT_STATUS
01
SITE_LOCATION
25100 E RIVER RD
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Escalon <br /> Site Health and Safety Plan <br /> site; coordinating emergency response functions with the Site Safety and Health Officer <br /> (SSHO), and integrating site emergency response plans with the disaster, fire, and/or <br /> emergency response plans of local, state, and federal organizations and agencies. <br /> The qualified alternate Emergency Response Coordinator (ERC) for this site is <br /> F We"'Ic'-ft'i <br /> ............................................. <br /> The qualified second alternate Emergency Response Coordinator (ERC) for this site is <br /> g'**a****n,*,:: <br /> att or <br /> .................................................... <br /> Site Supervisor <br /> The Site Supervisor for this site is Patrick Riggs responsible for field operations and <br /> reports to the Project Manager (PM). The Site Supervisor ensures the implementation <br /> of the HASP requirements and procedures in the field. The specific responsibilities of <br /> the Site Supervisor are: <br /> Executing the work plan and schedule as detailed by the PM; coordination with the Site <br /> Safety and Health Officer (SSHO) on safety and health; ensuring site work compliance <br /> with the requirements of this HASP. <br /> Patrick Riggs will be acting as both Site Supervisor and Emergency Response <br /> Coordinator. <br /> Site Workers <br /> Site workers are responsible for complying with this HASP, using the proper PPE, <br /> reporting unsafe acts and conditions, and following the lines of authority established for <br /> this project site. <br /> Decontamination Manager <br /> The Decontamination Manager for this site isCassidy o annoni <br /> .............................................................................. <br /> The Decontamination Manager is responsible for decontamination procedures, <br /> equipment, and supplies. The specific responsibilities of the Decontamination Manager <br /> are: <br /> Setting up decontamination lines and the solutions appropriate for the type of <br /> contamination on site; controlling the decontamination of all equipment, personnel and <br /> samples from the contaminated areas; assisting in disposal of contaminated clothing <br /> and materials; ensuring all required equipment is available and in working order; and <br /> providing for collection, storage and disposal of waste. <br /> Chapter 1 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.