My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1977-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
25100
>
4400 - Solid Waste Program
>
PR0504216
>
CORRESPONDENCE_1977-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 11:03:20 AM
Creation date
12/24/2020 9:19:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1977-2017
RECORD_ID
PR0504216
PE
4430
FACILITY_ID
FA0006125
FACILITY_NAME
ESCALON CITY DUMP
STREET_NUMBER
25100
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
24709015
CURRENT_STATUS
01
SITE_LOCATION
25100 E RIVER RD
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
authority to upgrade or downgrade PPE in a timely manner to respond to changing site <br /> conditions and to protect worker health and safety. Routine evaluation of the PPE <br /> program is conducted as identified in Section 6.7 below. <br /> rTt6 b t ►ctit► Lu IfCritariaP ' � Pd< cwngades <br /> Level of PPE Action Required Action Required <br /> Level/Criteria for Modification for Level/Criteria for Modification for <br /> PPE Upgrade Action PPE Downgrade Action <br /> Level/Criteria Level/Criteria <br /> Additional dB levels > 85 Additional hearing dB levels < 85 Basic foam ear <br /> hearing protection (muffs or plugs <br /> protection covers) <br /> Work Mission Duration <br /> Patrick Riggs identifies task-specific work duration based on the following: <br /> •e° physiological requirements of the task <br /> •e° PPE level for the task <br /> ambient temperature and humidity <br /> •s° respiratory protection capacity (air supply or cartridge change requirements) <br /> ❖ chemical protective clothing capacity (permeation rate of on-site materials), and <br /> ❖ acclimatization of the work force to site and task conditions. <br /> Patrick Riggs communicates the task-specific work duration during daily pre-entry <br /> briefings. Work duration is consistent with the requirements outlined in Chapter 8, Heat <br /> Stress and the respiratory protection capacity for the assigned PPE. Work duration is <br /> re-evaluated throughout the day in response to changes in working conditions. <br /> 6.3 Training <br /> Employees receive general training regarding proper selection, use and inspection of <br /> PPE during initial HAZWOPER training (or equivalent) and subsequent refresher <br /> training. Site-specific PPE requirements, including task specific PPE, ensemble <br /> components, cartridge/canister service times, and inspection procedures are <br /> communicated as identified in Chapter 4, Training. Chapter 12, Standard Operating <br /> Procedures, may include additional information regarding PPE training requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.