My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1978-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
640
>
4400 - Solid Waste Program
>
PR0504220
>
CORRESPONDENCE_1978-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 12:36:09 PM
Creation date
12/24/2020 4:28:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1978-2017
RECORD_ID
PR0504220
PE
4430
FACILITY_ID
FA0006127
FACILITY_NAME
WINDELER RANCH GLASS DISPOSAL
STREET_NUMBER
640
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
23903009
CURRENT_STATUS
01
SITE_LOCATION
640 W MOSSDALE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 October 2007 <br />AGE -NC Project No. 07-1569 <br />Page 3 of 7 <br />LOCATION: <br />JOB FUNCTION: <br />LEVELS OF PROTECTION: <br />Exclusion Zone <br />Excavation Area <br />A B C D Other <br />Reduction Zone <br />Preserve samples <br />A B C D Other <br />Support Zone <br />Support functions <br />A B C D Other <br />Specific protective equipment for each level of protection used is follows: <br />Level D: <br />hard hat <br />steel -toed boots <br />half -faced respirator (if necessary) <br />gloves <br />safety glasses <br />If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br />with the involved substances and concentrations. No down -grading changes of the specified levels <br />of protection shall be made without the approval of the site safety officer and the project team leader. <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks: <br />PROJECT TEAM LEADER: <br />TASK: <br />TBD <br />Collect soil samples; direct excavation <br />FIELD CREW: <br />TASK: <br />AGE Representatives <br />As directed. <br />TBD <br />Excavating/Trenching <br />TBD <br />1 Clean equipment / helpers <br />The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br />Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.