My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1978-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
640
>
4400 - Solid Waste Program
>
PR0504220
>
CORRESPONDENCE_1978-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 12:36:09 PM
Creation date
12/24/2020 4:28:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1978-2017
RECORD_ID
PR0504220
PE
4430
FACILITY_ID
FA0006127
FACILITY_NAME
WINDELER RANCH GLASS DISPOSAL
STREET_NUMBER
640
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
23903009
CURRENT_STATUS
01
SITE_LOCATION
640 W MOSSDALE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(�MOIRC;M 13. MA -A 33 CIVIL LNGINEF.B... <br />TER.rmioNt: 478.7797 .9722 SAN PASQUAL WAY, STOCKMN, cAj,Ii.'01kNJA 952141 <br />AUGUST 12, 1977 <br />REPORT ON WINDELER RANCH -CLASS DISP05AL SITE <br />The Windeler Ranch Class Disposal Site is used for the disposal <br />of waste glass or "cullet" and related solid wastes resulting from the <br />manufacturing operations of the Libbey7bw6n5-Ford Company at their <br />Lathrop Plant. This operation is carried out in acqi6rdance with the <br />leases hold by George B. Raab and the agreement between.10F and Raabj <br />and the terms of the use permit granted for the operation. Copies <br />are enclosed. <br />Waste materials are stockpiled at the LOF'p.lent and on an <br />approximately annual basis are hauled to the disolosal site where <br />they are placed into the hole (formed by the flood of 1908 or <br />thereabouts) and are covered with 4 feat of fill dirt. Fill dirt <br />is obtained from the bottom of the hole'.by-.tra.ctortand'scraper .-or <br />dragline. <br />The hauling and disposal work are done during about a month <br />long period during the summer of the year and thi site is inactive <br />for the bulk of the year. <br />The Diperations, are from about 6 A.,PM. to 6 P. M. at the site <br />during the immmer hauling period. <br />Waste is dumped from the dump trucks and is bulldozed .into the <br />hole and later covered with earth by the bulldozer and scraper. <br />Since the only equipment on the Site requires only one operator, <br />no sanitary facilities -have been*provided. <br />Roads.to-the.site have been -paved and dust control -in -the, - <br />site area . are . provided by use of.e. water wagari when needed during <br />operations. <br />No salvaging takes place at the site and .none is or will be <br />permitted Under the presentplans for operation, - <br />No noise' odor® dust, fly, or rodent :problems, or problems <br />of any similar nature have arisen from the operation of the disposal <br />site.. <br />The estimated quantities of waste to be disposed of rillfill <br />the site by 1980. 80. <br />00039 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.