My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1105
>
1600 - Food Program
>
PR0546379
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 8:23:17 AM
Creation date
12/31/2020 1:11:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0546379
PE
1613
FACILITY_ID
FA0026285
FACILITY_NAME
DUTCH BROS COFFEE
STREET_NUMBER
1105
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1105 W YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> ° <br /> COVER <br /> ami FINISHED ADJUSTING FOR WALL CONST. FLASHING SHALL BE FORMED TO CHIPPED CONCRETE WITH A POSITIVE SLOPE <br /> U 0 FLOOR COLLAR SEE ARCH. DWGS. TO CLAMP DEVICE. PROVIDE NON- SHRINK SPOUT UNDER FLASHING AS <br /> E <br /> REQUIRED TO FACILITATE POSITIVE SLOPE (ANY FLASHING MATERIALS OTHER <br /> � . d MAY EXTEND AS CLEANOUT PLUG THAN LEAD IS UNACCEPTABLE. MINIMUM WIDTH OF FLASHING SHALL BE 24"). <br /> o WASTE OR VENT <br /> ° • 0 • <br /> SCREW <br /> ADJUSTABLE <br /> c o FINISH FLOOR <br /> ° � CLEANOUT TEE STRAINER SLOPE TO DRAIN <br /> CLEANOUT PLUG RISER 11"AFF TO COUNTER ° c <br /> AND BODY. POLISHED S.S. <br /> ° E ACCESS COVER <br /> o 'E SEE SPECS. <br /> 1/8 BEND FULL 4 < <br /> A SIZE, 4" MAX. <br /> W A A - v �a� -o- <br /> °, c <br /> CAST IRON <br /> ° FLOOR DRAIN <br /> E v PLUG IF END WASTE LINE <br /> OF LINE WITH LENGTH TOSURE SEAL <br /> X (nFLOW .a SUIT CORE DRILL 10"0 TRAP GUARD <br /> °1 o A m AND 4"0 HOLES <br /> o d c d <br /> C THREADED OR CAULK <br /> U 2 CONCRETE v 1/8 BEND AT OUTLET <br /> 0 ENCASEMENT A END OF LINE OUTLET <br /> :3o FLOW A CLEANOUT <br /> o E <br /> a o NOTE: <br /> WASTE LINE <br /> ° CLEANOUT COVER FLUSH WITH TILE OR FLUSH NOTE: THE GENERAL CONTRACTOR SHALL PROVIDE A ONE PIECE WATER <br /> ° WITH CONCRETE FLOOR IN AREA WITH NO TILE. a a CONCRETE PROOF MEMBRANE FLOOR AND BASE IN THE TOILET ROOM(S). <br /> to ° — ENCASEMENT FLOOR <br /> O R DRAIN W TRAP GUARD <br /> E o FLOOR CLEAN — OUT DETAILWA —CEA OUT DETAIL <br /> SCALE: NTS SCALE: NTS SCALE: NTS <br /> ° M <br /> GNICH <br /> a) :1 FLASHING SHALL BE FORMED TO CHIPPED CONCRETE WITH A POSITIVE SLOPE <br /> ° L TO CLAMP DEVICE. PROVIDE NON- SHRINK SPOUT UNDER FLASHING AS <br /> ARCHITECTURE <br /> o REQUIRED TO FACILITATE POSITIVE SLOPE (ANY FLASHING MATERIALS OTHER ) SPECIFICATION fSUBMITTAL S T U D O <br /> o a THAN LEAD IS UNACCEPTABLE. MINIMUM WIDTH OF FLASHING SHALL BE 24"). <br /> o <br /> ° ADJUSTABLE <br /> r; NOTE: STRAINER FINISH FLOOR G <br /> ALL EXPOSED PIPING SHALL 1 2" CW SLOPE TO DRAIN , <br /> � � / ° SO 50 GPM Grease Interceptor for Indoor � Outdoor Use <br /> ° BE CHROME PLATED TO TRAP <br /> Y 'L PRIMER <br /> o _ -- <br /> o RESTROOM \ d• o- v ___- 1001 SE SANDY BLVD, SUITE 100 <br /> L_ LAVATORY o- v moo_ ,a_ <br /> PORTLAND, OR 97214 <br /> \ TRAP PRIMER WITH CAST IRON V. 503.552.9079 <br /> STOP VALVE (SA crn] ' <br /> o ° � ' F. 503.241.7055 <br /> C CHROME FINISH PPP# FLOOR DRAIN <br /> ° PR01-ULP500 WITH <br /> TURN TRAP 41 PRIMER DU-4 CORE DRILL 10"0 WWW.GNICHARCH.COM <br /> C DRAIN LINE AND 4"0 HOLES <br /> °I INTO WALL COLD WATER (�' � _ ____ ---_ = III 02.14.2020 <br /> THREADED OR CAULK - _-- - _ OFE <br /> o TYPE 'K' COPPER OUTLET -_ I y II II f <br /> vi KEEP MINIMU TUBING - NO JOINTSPR SSS <br /> BELOW FLOOR OUTLET II yyS I I II �Q +��LL O <br /> C' ° FLOOR DRAIN WITH <br /> ° TRAP PRIMER 1/2' NOTE: THE GENERAL CONTRACTOR SHALL PROVIDE A ONE PIECE WATERr----- j8Q3 m <br /> 1 <br /> CONNECTION PROOF MEMBRANE FLOOR AND BASE IN THE TOILET ROOM(S). <br /> ° TRAP PRIMER PIPING DETAIL FLOOR DRAIN W /TRAP PRIMER II �� I ' -SII 9ANIC -10- <br /> 0 <br /> � I I �_ �I <br /> L_ o SCALE: NTS SCALE: NTS �- ��` I I CALIF <br /> - -28=-_ <br /> U <br /> TURN FLASHING DOWN -- -� <br /> 1" INTO VENT STACK <br /> >, >, TraB urwt is Ei#811 ordnGwdiu�s arEA112-14 3 ir�rrroltlr�r�arnraLmd <br /> ° EXTRA DEEP ACCESS HEAVY-DUTY SECURED ;:,mdnowmrtmiwehvartnrnrawrsn <br /> � U <br /> � COVER <br /> oSHEET METAL GASKETED ABS U B I-7A L Q <br /> o (U FLASHING, SURFAC CLEANOUT PLUG <br /> O <br /> ° Q) MOP W/ Standard Options <br /> o ROOFING Z ••A ." Ir ati+6rlt:inCls}c}rjCatiltiGBr ❑PLI4M-Eat- ?2'(SO mrr5� ❑C�4k� H20 laexi rated p ko®le Cost iron O <br /> E ° MATERIAL fnatnillmitiewaba-.+ lb_-Iow =L <br /> 9' plain curt fitting cower 16,000 Ib�L <br /> Gapftl _ O <br /> At mmrnemanecompngejni m <br /> } Q <br /> ° ° N SLAB °+]idt,i a _ t j :fig US. <br /> . plain end fitting ❑PM PWmpout fort V) <br /> C ° CONCRET ANCHOR FLANGES Ias Capacity:. - <br /> rFi-EAIrM 3"x 2'(75 mrra x 50 rrrri) ❑111f1:High Weneir Anchor 161- <br /> 0 ROOFING liquid Capacity:,52 gal. FPT fitting FIS Cutllilmn <br /> U <br /> Weight-- L.s <br /> _C _j SIZE---- ❑rin-me- :4'x3-(lo mma715mm) ❑SP24 s 23-Tiekleutriter <br /> J ACCESS COVER WITH CLEANOUT G°anmecL4ns:4-(139 mm�piltri•�entl <br /> -o Cawrr:L�teci gcrsiwoter tight composite FPT fitting ❑LR24 523- ?13-56101Cut riser <br /> O <br /> Q VENT PIPE READIED COUNTERSUNK -o,iL-,;._,_}}M•�dr{rt� <br /> 0 U) CLEANOUT PLUG <br /> C: OVER Approval M <br /> ° C CLEANOUT vV V) <br /> to siyhUturc.. *S e_: CCJMPF Iny <br /> O <br /> Sp�Cifying Ent]rnecr: Engirlesring 1r'ri I L J <br /> a � COUNTERSUNK SCREW <br /> m SANITARY STACK 0 <br /> SCIER <br /> M^[pE�LHUf�l��Bt1Ef3: CISCWpT1�?N:50GPfnmllr�lriylerCy'criselntierCe +to n` <br /> W H V Ci- 4J VJ <br /> :3 LIFETIME GJARANTEED z 4- <br /> 0 -° . : PJ4AT#.4025-D1T-UI [}V4Mi 6Y:8. rar [?J4TE Byf3[!T9 NEV ECS <br /> � SLEEVE OOF CONSTRUCTION PIPE SIZE <br /> U AS REQUIRED CLEANOUT TEE & ACCESS COVER O n, <br /> •0 - Page 9 of A W Q (`7 4— <br /> L VENT STACK NOTE: N M O <br /> FIRE RESISTANT PACKING 1E -0 . INSTALL CLEAN OUTS SO BOTTOM IS AT LEAST 7"ABOVE Q �_ Lo � M <br /> o "3M" OR EQUAL FINISHED FLOOR. G R E A c S E INTERCEPTOR U Q 01 <br /> VENT TO ROOF DETA L CLEAN — OUT DETAILS U o 0 Co Q <br /> ° -° SCALE: NTS `�' U <br /> o � SCALE: NTS SCALE: NTS m U <br /> O <br /> o 06 x0 <br /> O } LO <br /> O i m 3 <br /> 41 SHUT OFF VALV EXISTING HWR PIPE <br /> FULL PORT BALL VALVES <br /> Q <br /> o AIR RELIEF VALVE <br /> ISSUED FOR PERMIT: <br /> o BY PLUMBING CONTRACTOR <br /> STRAINER BY GAS COMPANY(VERIFY) <br /> DRAIN LINE <br /> D PRESSURE TEST COCK EXTERIOR BUILDING WALL. 02. 4.20 <br /> C: FLOOR GRATE TO BE GAS METER OF CFH GAS PIPE UP PENETRATE WALL <br /> FLUSH WITH D NEW INLINE HWR PUMP, AS NOTED. CAPACITY SHOWN G ROUTE PIPING ABOVE CEILING <br /> ° FINISHED FLOOR VERIFY PROPER PUMP ROTATION. ON PLANS SIZE BL SHOWN ON PLAN. <br /> ° MOUNT FLUSH PIPE IN- USE BLACK STEEL PIPE. <br /> FROM GAS SUPPLY WITH FINISHED CREASER ANCHOR RISER TO WALL AT <br /> V, FLOOR TEN FOOT INTERVALS USING REV: DATE: DESCRIPTION: <br /> OFFSET RISER PIPE CLAMPS. <br /> AIR GAP IN) BYPASS VALVES <br /> 1/2 m PIPE INCREASER AND UNION <br /> •a C (2 MIN) � <br /> o TO TRA SWING CHECK VALVE STRAINER PROVIDE 6"LONG DIRT <br /> 0 o PRIMER PAVEMGRADEENT LEG AT BOTTOM OF RISER. <br /> TO APPLIANCE 111 FLOOR <br /> - G <br /> PRESSURE REGULATOR TO REDUCE PRESSURE TO 14"WC. <br /> ' FULL PORT BALL VALVES SHEET NAME: <br /> TYPICAL SHUT-OFF VALVE <br /> oVERIFY REQUIREMENTS FOR METERING AND PIPING WITH GAS COMPANY. <br /> DIRT LEG EXISTING HWR PIPE INSTALL OTHER UTILITIES MINIMUM TEN FEET FROM GAS LINE. PLUMBING <br /> a CONTRACTOR SHALL PAY ALL GAS COMPANY FEES FOR INSTALLATION. PLUMBING DETAILS AND <br /> USE WELDED OR SCREWED PIPE AND FITTINGS PER PLUMBING SPECS. GENERAL PLAN <br /> viGAS COMPANY SHALL EXCAVATE, BACKFILL,AND REPAIR ANY PAVING <br /> 0 HUB OUTLET OR SOD FOR GAS SERVICE LINE INSTALLATION FROM MAIN TO BUILDING. <br /> m <br /> E <br /> SHEET NUMBER: <br /> , R <br /> o m sGAS APPLIANCE CONNECTION FLOOR SINK DETAIL H W RECIRCULATION SATON PUMP DETAIL GAS CONNECTION DETAILEngineeringInc. <br /> P5 . 0 <br /> C SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS 796 Merus Court T 636.349.1600 <br /> St.Louis,MO 63026 F 636.349.1730 <br /> 0 2019 DB Franchising USA, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.