Laserfiche WebLink
3 <br /> 0 <br /> C <br /> rn <br /> tri 0 A. GENERAL NOTES 3. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE OR MASONRY. HANGING FROM METAL <br /> 0 -o 1. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY DECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORDS OF BAR JOISTS. WHERE <br /> 0 0 CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO ALL SECTIONS OF DIVISION 15000. INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT (DUCTWORK OR PIPING) THE CONTRACTOR SHALL <br /> En2. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT <br /> °�' REVIEW THE DRAWINGS FOR ALL DIVISIONS OF WORK PRIOR TO BEGINNING WORK AND IS RESPONSIBLE INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. <br /> 0 <br /> FOR THE COORDINATION OF HIS/HER WORK AND THE WORK OF HIS/HER SUBCONTRACTORS WITH ALL 4. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF <br /> U) DIVISIONS OF WORK TO AVOID INTERFERENCE AND CONFLICTS. IT IS THIS CONTRACTOR'S INSULATION. INSTALL 6" LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE <br /> oRESPONSIBILITY TO PROVIDE HIS/HER SUBCONTRACTORS WITH COMPLETE SETS OF BID DOCUMENTS. PIPE INSULATION. PROVIDE HIGH DENSITY INSULATION INSERT BETWEEN THE SADDLE AND THE PIPE. <br /> o E 3. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF HIS/HER 5. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED. <br /> U WORK AND THE WORK OF HIS/HER SUBCONTRACTORS TO COMPLY WITH THE SCHEDULE. <br /> 4. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS <br /> L AFFECTING THE WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANY I. DIRT AND DUST CONTROL <br /> E v <br /> PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID. 1. SCREEN OFF ALL AREAS WHERE CONSTRUCTION IS TO TAKE PLACE FROM THE AREAS TO REMAIN <br /> ^ C SUBMITTAL OF A BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY INHABITED. INHABITED AREAS SHALL REMAIN DUST AND DEBRIS FREE DURING CONSTRUCTION. <br /> X MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS 2. CLEAN ANY AREAS OUTSIDE DESIGNATED CONSTRUCTION AREA WHICH MAY HAVE BECOME SOILED DUE <br /> °; 3 SHALL BE INCLUDED. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF HIS/HER TO CONSTRUCTION. <br /> RESPONSIBILITY IN PERFORMANCE OF WORK <br /> 0 J. EQUIPMENT, PIPING AND INSTALLATION <br /> B. GENERAL REQUIREMENTS: 1. REFER TO PLANS FOR SCHEDULES OF EQUIPMENT AND FIXTURES. AMERICAN STANDARD, KOHLER AND <br /> a 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, CRANE ARE CONSIDERED ACCEPTABLE AS EQUALS. <br /> o E TRANSPORTATION, AND FACILITIES NECESSARY TO PROVIDE A COMPLETE HVAC, PLUMBING, FIRE 2. MAINTAIN A MINIMUM CLEARANCE OF 6" BETWEEN PLUMBING PIPING AND EQUIPMENT AND ALL <br /> 0- ° PROTECTION SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS AND AS FIRE/SMOKE RATED WALLS. <br /> -0 L REQUIRED BY JOB CONDITIONS. ALL WORK NECESSARY AND NOT SPECIFICALLY NOTED TO BE 3. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. INSTALL UNITS <br /> C <br /> o PROVIDED BY OTHERS SHALL BE PROVIDED BY THIS CONTRACTOR. LEVEL AND PLUMB, FIRMLY ANCHORED IN LOCATIONS INDICATED. <br /> ° <br /> U) 0 2. ALL WORK SHALL BE PERFORMED IN A NEAT, PROFESSIONAL MANNER USING GOOD CONSTRUCTION 4. POTABLE WATER PIPING SHALL BE AS FOLLOWS: <br /> a) <br /> -0 PRACTICES. a. BELOW GRADE: TYPE 'K', ANNEALED TYPE TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES AND <br /> E o 3. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS AND EQUIPMENT, INCLUDING ALL SMALLER. BRAZE ALL JOINTS. sTrsEo=r+�=,_ sTn,E,DF cuiFc,ftraLn <br /> fin rn COMPONENTS THEREOF, SHALL BE NEW, TESTED, LISTED AND SIZED IN CONFORMITY WITH b. ALL OTHER: TYPE 'L' DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95-5 WATER HEATING SYSTEMS GENERAL INFORMATION WATER HEATING SYSTEM GENERAL INFORMATION <br /> 0, <br /> REQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT. TIN-ANTIMONY SOLDER. r a aRcv-lam =c .L.ey�sie t =rEnrr_alr.ai=a_n E•=rFe i�_=_�1 e:afvaces=; w,L_0FLIJASNERGYCOU <br /> 4. ALL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, 5. PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED. cERrF1 �rE CF COMPLIiIJCE NRCC-PLB C11 E CERTFICATE OF COMPLIANCE NRCC-PLB-01-E <br /> GNICH <br /> a) 2:1 MAINTAINING AND REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT 6. FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO SUBMITTING BID AND NOTIFY ENGINEER IF Water Heating System General Information ;Page i of 2:1 water Heating system_eneral Information {Pale?a=z <br /> °' a) SERVICE ACCESS TO ALL EQUIPMENT. CONDITIONS ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTOR a�,.a.r.r.- r =_• �, , , � .� , "11GS'rG.YusrrtiteAvr-Man'e[a.CA 33i '"` p' d 02,r1A72024 /ARCHITECTURE <br /> 1W5'A.e-miteAve-11Aen:eru,U91,337 C2f1Af2G-0 <br /> 0 5. FIELD MEASURE AND VERIFY REQUIREMENTS FOR EXACT DIMENSION'S. OFFSETS AND ADDITIONAL SHALL VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE-IN AS FOLLOWS: D I 0 <br /> 0 0- ELBOWS REQUIRED TO SUIT SITE CONDITIONS ARE CONSIDERED PART OF THE SCOPE. c. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE. DOCUMENT.ATIa;NAUTHOR'SDECLARATIONSraTEMENT <br /> A G�ErdER�LINFC7RMATIONJSYSTEMIAFORMATIO`k, <br /> d. TEST WATER PRESSURE TO INSURE MINIMUM PSI MATCHES MOST DEMANDING EQUIPMENT i_ Ice tlf, I a]t915{e tlf lCa]e of{UTA ar Ce dC•CL Ten]atlor S aCCLr2Ce anc tomple <br /> `� 00 01 :ate-Heatar s':stem Name: Tanklees Watei Ilew'er eau.-. .+I L �._L• I W..... x Lu-. clrx-c 11 k. L <br /> C. CODES SUPPLIED. J D�nellCase <br /> U o 02. ':;ate-Heaie.r S•.stem Ccnfiguratio�.n: Central5ystern t„I,Iw.�rr.r lr. n■tr <br /> a) 1. ALL WORK SHALL COMPLY WITH 2019 CALIFORNIA PLUMBING PLUMBING CODE ORDINANCES AND OTHER 7. INSULATE ALL HOT AND COLD WATER PIPING WITH 1" THICK (K=0.23 @ 75-F) FIBERGLASS PIPE to eLnrpsawr■ <br /> necrir� t}2fi4f}a2u <br /> STATE, COUNTY, CITY AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES, INSULATION WITH AN ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD AND SMOKE 03 %iter Healer S;stem type: Dal re�tK IIa''r4'aLLY <br /> 0 Mdtar LEAD MER;.Lralfl.6m ldm[11_■:i:,,.f u__vILAU.1: <br /> E ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THIS CONTRACTOR SHALL DEVELOPED RATING. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 04 Building l`,pe: NcrlrrriJenLijl J 796h1erusCcurt <br /> 0 INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS 8. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORIES WITH TRUEBRO MODEL 102W 05 Total Number ofl.t;aterHeaters in Systems: 2 Ferl'unrVO630M, fi36.349.1Er_{I <br /> CONTRACTOR SHALL INCLUDE IN THE BID ANY CHANGES REQUIRED BY CODES AND IF THESE CHANGES "HANDI LAV GUARD" INSULATION KIT OR EQUAL. 05 Central 011W Distribution Type: Darwnd 3e•.i1LUIaAiun J RESPONSaBLE PER50N'SDECLARATION STATEMENT 1001 SE SANDY BLVD, SUITE 100 <br /> a) O ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER 9. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING 07 Dwellin=Unit DHW Distribution Type: NA Icerti4y-he falo •ineuneer> ral^f Of pe JLry,rode tFel:w:oftF�eState,ofe:.rfo-r'a: PORTLAND, OR 97214 <br /> `0 CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED TO THE AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN 1. Thein=ar atia��rv'decort"';ctrti �xeo-fcamp'ance's:uea"drarre�t- V. 503.552.9079 <br /> 2. 1 am elir,3 e uncer I)Mzior 3 of:ne Blaine.and Profe-.suns Cade to accept responsibility for the building cesion or sy.lem des:gr <br /> 0 -o CONTRACTOR. OF 5 FEET. B.WATER HEATER INFORMATION id"t*Fedonthis(em. cateofCompliance:xsponsibledes'grerl. F. 503.241.7055 <br /> 0 10.FLUSH STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES. Eadtwater heater t}Ip•erequires aseparateform 3. The energy features andpeformancespeci=lcat'ons.ma-.e•ials,components,a�ndmanLfacwr"clevicesforthea,ildin6des�ra- WWW.GNICHARCH.COM <br /> Q) -, D. LICENSES, PERMITS AND INSPECTION FEES 11.TEST ENTIRE PLUMBING SYSTEM IN ACCORDANCE WITH 2019 CALIFORNIA PLUMBING CODE. 01 water Heater Tv : ns!antanLtu:Lsr{;e {.x. J system design iden-,Aedonthis Certi'ca:eofCom pliarcecorfarmoothe requirement-.o"Title24,Part iand Part 6OFthe <br /> C 1. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS AND FEES 12.PROVIDE WATER METER AND REMOTE READER PER LOCAL UTILITIES REQUIREMENT, IF APPLICABLE. 02 Fuel Gas _1 iCaliforniaCodeofRegL'ation:. <br /> E J 4. The building deign fea:umsor system deign feature idert Fed or this Cer--i=lcate of Compliance are consistent with the 02.1 4.2020 <br /> o REQUIRED OR RELATED TO DIVISION 15000 WORK. 13.CONDENSATE DRAIN: PROVIDE POLYVINYL CHLORINE (PVC) SCHEDULE 40 PLASTIC PIPE (TYPE (DWV) IN 03 Manufacture Name: Rinnei informationprovidedorotherapoliczbecam oliarcedoc4-ants,worksheet.�Icuations-plansandspecificationssubmitted to <br /> 0 <br /> Q_ <br /> 2. FURNISH TO THE (OWNER)ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT CONFORMANCE WITH STANDARD ASTM D2665. 04 M1ode'.Number: RURlrj'!IN theenforcementagencyfor aparar•alwitl-tE s auildine x-mltapn'cadon. 1,1 <br /> C Uj 5. I Nillensure-hat a completed sgned copy cf tF isceri=icate of Compliance shall be made available with the building perm RIs} ROFE <br /> COMPLETION OF PROJECT. 14.VALVES: PROVIDE BALL VALVE NIBCO SERIES 585-70 FOR SHUT-OFF. 05 Numbe-of Identical water Heaters: 2 <br /> V) - issued for the bLildir:gnd:amade available to the erf� mn <br /> cecrt aEecy for allapp'.�cable inspections.I understandthat acarno eted <br /> � L <br /> 15.WATER SUPPLY VALVES: PROVIDE BALL VALVES NIBCO SERIES 585-70 FOR SHUT-OFF W/ COLOR CODED 06 Installed'Watef Heate''System Efficiency: 96 signed copy ofthis{'ertHcate of Compfiance,is require to be included with the dacLmentationthe builder provides to tFe buildir_e <br /> -0 E. GUARANTEE HANDLES: RED=HOT, BLUE=COLD, WHITE=FILTERED WATER. <br /> 07 Required Minimum Efn"cieno':: 95'� owreratoccanaicy. <br /> 0) a) rStaV-.t _tr D.s*l r4.nt. w r­s .Cvsiarwr lA`AY1Y1■: <br /> C -0 1. THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HIS/HER 16.PROVIDE ACCESS PANELS WHERE REQUIRED FOR OPERATION, MAINTENANCE AND BALANCING OR 06 standby Loss Percent or Standby Loss-o-3 C Dmell Cne <br /> o ° CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS/HER OWN EXPENSE, ANY DEFECTIVE PLUMBING EQUIPMENT. 04 .,,x. .=,■IIrL. W8031 � <br /> Rated Input: 194!.171 max EuSinxelinu a2l1dJ2D20 <br /> 6 WORK, MATERIAL OR EQUIPMENT DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF 17.PROVIDE WATER HAMMER ARRESTORS AT EACH BRANCH LINE. * J, <br /> 10 Pilot E -=. Addf■a.: Lurw: <br /> C � Enc-g,- 796 M ecus C_ru' h128D3i <br /> - L <br /> ACCEPTANCE (IN WRITING) OF THE INSTALLATION. EXTENDED WARRANTIES ARE AS SPECIFIED WITH 18.FOR WATER PIPING USE COLOR CODED PEX PIPING IN WALLS TRANSITION TO COPPER AND 90 DEGREE <br /> O 11 '.`1rte-Hea�erTank-StorageVolume: �Ltvl�utN3u: f+r. <br /> E INDIVIDUAL EQUIPMENT. OUT OF WALL- RED=HOT, BLUE=COLD, WHITE=FILTERED WATER. Frn'onN�IG30: 636.349-1i+0 '"r1,gNIG P, <br /> L_ -0 2. THE HOT WATER HEATERS SHALL BE FURNISHED WITH A 5 YEAR HEAT EXCHANGER WARRANTY. 1t Exterior Insulation an Water Heater 9"C`' F <br /> M ° H. GAS PIPING 13 'volume of Supplemental fitorage. � CALIFd� <br /> 0 F. PHASING REQUIREMENTS (IF APPLICABLE) 1. FURNISH AND INSTALL A COMPLETE GAS PIPING SYSTEM. 14 Internal Insulation on Supplemental saorae <br /> 0 1. THIS CONTRACTOR SHALL INCLUDE IN THE BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE 2. GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A-53, WITH MALLEABLE THREADED FITTINGS is Exteriorwsulatian on Supplemental S:.rage _ <br /> OPERATING PORTION OF THE BUILDING'S (HVAC, PLUMBING AND SPRINKLER)SERVICES IN OPERATION. FOR 2"AND SMALLER, AND WITH WELDED JOINTS FOR 2-1/2"AND LARGER. <br /> 0- CONTRACTOR MUST SCHEDULE IN WRITING ONE WEEK PRIOR TO ANY SHUT DOWN OF (THE HVAC, 3. FURNISH AND INSTALL A GAS COCK, DIRT LEG, AND UNION CONNECTION AT EACH PIECE OF EQUIPMENT. C.PLUME6ING COMPLIANCE FORMS WORKSHEETS <br /> 0 0 PLUMBING OR FIRE PROTECTION) SYSTEMS 4. PITCH PIPING AT A UNIFORM GRADE OF 1/4" IN 15 FEET UPWARD IN DIRECTION OF FLOW. SUPPORT (chick box if worksheet is included:) <br /> o 2. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING PIPING EVERY 5 FEET, AS DETAILED ON DRAWINGS, OR BY STANDARD INDUSTRY PRACTICE, WHICHEVER Fur derolaointrmr-onsanthias-0c;f hsordaNErmrgyr iocSir-kl zrdscDm iVzi.1[i L`rns,rcnxrrerrw?G13.hb,nres;ec.rcl,4icn:+cl <br /> WORK AND THE RENOVATION WORK. COORDINATE WITH THE OTHER CONTRACTORS ANY EXISTING IS MORE STRINGENT. Q <br /> 0 <br /> Q EQUIPMENT REQUIRED TO BE LEFT INTACT. THIS CONTRACTOR SHALL INCLUDE AND WILL BE HELD 5. GAS PIPING EXPOSED ON ROOF SHALL BE PAINTED WITH RUST-INHIBITING PAINT. C, Nt Farm/wartsheet x itle O <br /> 0 RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING (FIRE PROTECTION SYSTEMS, PLUMBING FIXTURES, 6. GAS PIPING INSTALLED IN RETURN AIR PLENUMS SHALL BE SLEEVED AND VENTED OR WELDED IN = NRCC-PLB-01-E certificate of compliance,Declaration,Required on lansforall submittals. <br /> 0 o PIPING SYSTEMS, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS). AND ASSOCIATED ROOF ACCORDANCE WITH THE LOCAL GAS COMPANY, LOCAL CODE AND APPLICABLE NFPA 54 CODES. - rJa.{-PJB-01-E ertificate aflnstallation.Required on plans all submittals_ O <br /> 0 <br /> E o- CURBS OR RAILS NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. 7. TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE REQUIREMENTS OF THE LOCAL GAS C_., NIRCi-PLB-02-E certificate offnstallation,required on central systems in high-rise residentia kN <br /> m <br /> -0 a) CONTRACTOR SHALL VERIFY ALL PRESUMED ABANDONED (EQUIPMENT, PIPES, DUCTWORK AND COMPANY, LOCAL CODES AND APPLICABLE NFPA CODES. hotel:motel appl kation. O <br /> C L Certificate of-nsrtallation,required on single dwelling unit systems in high-rise Q <br /> 0 0 EQUIPMENT) PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED. ALL 8. CONTACT AND COORDINATE GAS SERVICE, METER AND REGULATOR REQUIREMENTS WITH THE LOCAL NRC4-P_E,-C=-E <br /> EXTRANEOUS ITEMS IN THE SPACE, ASSOCIATED WITH THE SPACE, OR ON THE ROOF NOT APPLICABLE GAS COMPANY PRIOR TO BID. INCLUDE INSTALLATION COST OF GAS METER AND REGULATOR IN BID. residential,hotel motel application. <br /> C C certificate oflnstallation,required on HEn erifiea ce:-itrals:ste-lr In high-rise rnrn <br /> 0 TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH _ rJRCI-PLE-2=-H residential,hotel.+motel applicaticri. VJ <br /> a) U EXISTING SURROUNDINGS. EXISTING ABANDONED (PIPES, DUCTS OR EQUIPMENT) IN THE FLOOR, I. LABELS/PIPE MARKERS certificate ofln5tallation,requiredon HERSverified single dwelling unit systems in high- � <br /> _0 J NRCI•PLB-22-H <br /> EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR 1. FURNISH AND INSTALL PIPE IDENTIFICATION MARKERS EVERY 5 FEET ON ALL PIPES INSTALLED UNDER rise residential betel/motel application. <br /> WITHIN THE FLOOR OR WALL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY THIS CONTRACT. MARKERS SHALL BE A MINIMUM OF 1-1/2" X 8" AND IDENTIFIED IN ACCORDANCE WITH NRC1-STH-OL-E certificateoflnstallation required on any solarwwer heating0 � <br /> o CODES, ABANDONED (PIPING AND/OR DUCTWORK) MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE BACKGROUND AND LETTER COLORS ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE <br /> C THE EXTENT OF DEMOLITION PRIOR TO BID AND INCLUDE IN BID PROPOSAL. (ANSI). MARKERS SHALL BE MANUFACTURED BY CHAMPION AMERICA INC., BRADY, SETON, OR EQUAL. M <br /> C 2. PIPING SHALL BE IDENTIFIED AS FOLLOWS: CONDENSATE, REFRIGERANT LIQUID, REFRIGERANT CA,6uitdingEnergy EfficientyStandards-2016Nonresidentl31 Comp'iance August 2013 00 V) <br /> Fn CCI Building Energy Efficiency standards-2016 Nonresidential Compliance Augwst 2015 0 <br /> G. SLEEVE SUCTION, AND DIRECTIONAL ARROWS. ALL IDENTIFICATIONS MUST BE VISIBLE AT EQUIPMENT. <br /> 1. THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE 3. VALVES SHALL BE TAGGED IN ACCORDANCE TO VALVE OPERATION SCHEMATIC. J <br /> 0 INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH ITS RESPECTIVE FLOOR, WALL OR PARTITION 4. LABEL ALL FILTERED SUPPLY STOPS. / LL J <br /> (n LL_ AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH16 CI Q <br /> M SHALL EXTEND 2"ABOVE THE FLOOR. J. STEEL FRAMING FOR SUPPORT ` 0 <br /> o i <br /> _ T 2. CONTRACTOR SHALL COORDINATE ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY 1. PROVIDE ALL NECESSARY STEEL FRAMING REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED r 1 N 0_ <br /> 0 <br /> FLOORS OR WALLS. OR IMPLIED ON THE DRAWINGS. ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE AT THIS v z 4- <br /> o 3. ALL SLEEVES AND OPENINGS THROUGH FIRE-RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALED CONTRACTOR'S EXPENSE 1 <br /> rn <br /> C WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN O N <br /> THEIR FIRE RATING.SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE K. SYSTEM START-UP <br /> 0 = STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY 1. THIS CONTRACTOR SHALL INCLUDE AS A BASE, 2-HOURS OF START-UP TIME PLUS AN ADDITIONAL Q ('7 4- <br /> ° `0 PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL 2-HOURS OF START-UP TIME PER HVAC UNIT SHOWN ON DRAWINGS. M O <br /> E -0 BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. 0 � 1 L0 <br /> C <br /> Q O� <br /> � >, H. HANGERS L. FINAL INSPECTIONS U 00Q <br /> 1. PROVIDE HANGERS AND SUPPORTS FOR ALL PIPING, DUCTWORK, AND EQUIPMENT IN ACCORDANCE 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, THE ENGINEER SHALL BE NOTIFIED (IN U 0 L o, <br /> _0 WITH SMACNA, MSS, ASME, AND ASHRAE STANDARDS. WRITING) TO INSPECT THE FINISHED INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE i 0 J O U <br /> 0 3 2. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C-CLAMPS WITH PLANS, SPECIFICATIONS AND CODES. THE INSTALLING CONTRACTOR SHALL BE RESPONSIBLE TO BRING m > i <br /> o 2) RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. ALL ITEMS REPORTED BY THE ENGINEER INTO COMPLIANCE . U > >� X <br /> 0 > 0 <br /> 0 Lo <br /> o _v) L O 0 <br /> C O O Q <br /> a) <br /> o <br /> ISSUED FOR PERMIT: <br /> o � <br /> 02. 14.20 <br /> .F <br /> O U <br /> � a) <br /> > O <br /> U <br /> U <br /> V) REV: DATE: DESCRIPTION: <br /> 0 <br /> U_ <br /> � CL <br /> O <br /> O C <br /> O <br /> -p g' <br /> a) Yn <br /> 0 k <br /> U 37 <br /> SHEET NAME: <br /> O <br /> O O <br /> O <br /> PLUMBING GENERAL <br /> NOTES <br /> U5 <br /> o , <br /> M <br /> M <br /> E <br /> Cm4SE SHEET NUMBER: <br /> , R EngineeringInc.� � P6 . 0 <br /> 796 Merus Court T 636.349.1600 <br /> 0 <br /> St.Louis,MO 63026 F 636.349.1730 <br /> F- <br /> O 2019 DB Franchising USA, LLC <br />