Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
WFS, Inc. <br /> Management Team. The Station Safety Coordinator's role is to ensure corporate- <br /> approved site safety and security programs are proactively and effectively maintained at <br /> the operational level. <br /> In late January 2021 when I became aware of the outstanding need to respond to <br /> SJCEHD's 9/18/2019 hazardous waste generator inspection of the WFS-Stockton <br /> Station, the following actions were initiated: <br /> 1. Retained the services of Ms. Maureen Daggett and Environmental Compliance Services <br /> (ECM Services) to assist WFS representatives with identification of applicable <br /> corrective action and/or response for each of the 14 findings of non-compliance <br /> summarized in the 9/18/2019 inspection report. Ms. Daggett has over 30 years of <br /> experience in providing comprehensive environmental regulatory compliance support <br /> services to California's industrial and commercial communities. As of February 24, <br /> 2021, the following Return to Compliance actions have been completed or are in- <br /> process: <br /> a. Conducted a site inspection and operational review to identify current site <br /> conditions, including waste generating activities; <br /> b. Based on the site inspection and operational review, identified and profiled <br /> RCRA,Non-RCRA and universal waste streams currently generated at the WFS <br /> Stockton Station; and <br /> c. In the process of developing a predictive regulated waste management program <br /> that provides for waste-specific practices to minimize the generation of the <br /> regulated wastes, as well as proper handling, storage, and shipping/disposal <br /> requirements for each identified regulated waste; and <br /> 2. Effective immediately, assigned all WFS-Stockton regulated waste management <br /> responsibilities to the Station Safety Coordinator. The Station Safety Coordinator will <br /> serve as the facility's point-of-contact and will be responsible for monitoring all waste <br /> generating activity, including recordkeeping, to ensure that only pre-approved regulated <br /> wastes are generated at the Stockton Station, and in accordance with each approved <br /> waste stream's generation, handling, storage, and shipping/disposal requirements. <br /> As you may recall from your site inspection, the Stockton Station operates in a fairly <br /> basic facility. In early 2020, the Stockton Metropolitan Airport Authority began the <br /> design and permitting process for the construction of a new 10-acre air cargo facility at <br /> 4723 B. Street in Stockton, that incorporates WFS-Stockton Station's current footprint. <br /> Construction of the new 60,000 sq. ft warehouse facility began in August 2020, with a <br /> scheduled completion date of April 30, 2021. <br /> Bldg.151 East Hangar Road,Suite 361 <br /> JFK International Airport Jamaica,NY 11430 USA WFSl.:(718)244-0900 Fax:(718)244-1404 V V <br /> www.wfs.aero <br /> Worldwide Flight Services <br />