Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for El Dorado Gas & Mart as of December 24, 2020. <br /> Open violations from May 28, 2020 inspection <br /> Violation#210-No employee present that were trained in the operation and maintenance of the UST system <br /> by a DO. <br /> OBSERVATION:The designated operator employee training for Nabeel Navead was not current. <br /> REGULATION GUIDANCE:The designated operator shall train facility employees in the proper operation and <br /> maintenance of the UST system at least once every 12 months. The training shall be conducted before the <br /> individual performs the duties of a facility employees.The training shall include, but is not limited to: <br /> 1.Operation of the UST system in a manner consistent with the facility's best management practices <br /> 2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br /> 3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br /> 4. Name of the contact person(s)for emergencies and monitoring equipment alarms <br /> initial training shall also include a site-specific practical demonstration that provides both sharing information and <br /> evaluating knowledge for responding to emergencies, leak detection, monitoring alarms,spills and overfills. At least <br /> one of the facility employees present during operating hours shall have current training. <br /> CORRECTIVE ACTION: Ensure that employees have been trained by the designated operator, maintain the list on <br /> site,and submit a copy of the training records to the EHD_ <br /> ❑ This violation was corrected This violation will be corrected by(date): 3Z1/2021 <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: The station is current shut down for <br /> in early March 2021 <br /> Violation#304-Failure to construct,operate,and maintain primary containment as product-tight. <br /> OBSERVATION: Little amounts of liquid was found in UDC 3/4,indicating a leak in the primary containment. <br /> REGULATION GUIDANCE:All primary containment for the UST system must be product tight_ <br /> CORRECTIVE ACTION: Immediately have a properly licensed,trained,and certified contractor repair or replace the <br /> failed component(s), under permit and inspection of the EHD if necessary. <br /> ❑ This violation was corrected IX This violation will be corrected by(date): 3/1/2021 <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: Repairs to the UST leaks will be initiated <br /> once we have new disipensers and monitoring system installed. In the meanwhile the FIST <br /> has been emptied <br /> Page 8 of 8 <br />