Laserfiche WebLink
leanHarbor5 <br /> January 19, 2021 Page 3 of 7 <br /> Clean Harbors Quote #3660360 <br /> QUOTE CONDITIONS <br /> findings, NDT data with applicable data tables including location and remaining thickness of any <br /> recordable internal metal loss and photographs. This tank is considered to be a "New Tank System". <br /> Certification in accordance with Title 22 66265.192(a) and (h) will be provided as part of the report. <br /> This certification will be signed and stamped by a Registered Civil Engineer in California. NOTE: A <br /> PDF copy of the final report are to be submitted to Kraft Heinz Company within fifteen (15) <br /> business days of the last day on-site for their review. Once approved, then a hard copy will be <br /> submitted. <br /> PERSONNEL <br /> The crew shall consist of an Inspector certified per API Standard 653 / STI Adjunct / NDT <br /> technician(UT Level II). <br /> TANK PREPARATION <br /> 1) The surfaces or welds to be inspected by visual or ultrasonic examinations should be free from <br /> scale, rust, dirt, oil, grease, or other extraneous materials, which may interfere or limit them. <br /> 2) General assessment of safe access around this tank will be made by the crew supervisor prior to <br /> performing any work thereon. <br /> 3) Appropriate safety evaluations and lock and tag outs completed, including confined space <br /> procedures in accordance with 29 CFR 1910.146 and OSHA. <br /> COST OF SERVICES <br /> We are pleased to conduct this verification and engineering evaluation for compliance with DTSC <br /> regulations for the following lump sum price: <br /> Please provide a Purchase Order or Work Authorization Number when scheduling work. <br /> This proposal is valid for 2021. <br /> Our payment terms are net 30 days. <br /> Clean Harbors shall be entitled to Change Orders and compensation for additional costs incurred as a <br /> result of any variation or delay including but not limited to; work-stoppages, delays or scope <br /> changes, including any changes as a result of action of Customer or COVID-19. <br /> The exceptions to this price include: <br /> 1) Customer required delays, which may include the following: <br /> A. Tank preparation; or <br /> B. Safety or Site-Specific training lasting longer than 1/2 hour/permitting/security delays <br /> C. Delays due to availability or access to restricted areas. <br /> 2) Expanded scope of work per customer request. <br /> 3) Clean Harbors is not responsible for damage resulting in the testing of valves or mechanical <br /> connections. <br /> 4) Work extending to weekend or holiday at customer request. <br /> 5) Additional mobilizations. <br /> 6) Excessive corrosion. <br /> Clean Harbors provides no warranties, express or implied, of merchantability, fitness for service, <br /> purpose or otherwise. In no event shall Clean Harbors be liable for any indirect, incidental, <br /> 0"People and Technology Creating a Safer, Cleaner Environment" <br />