My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:34 AM
Creation date
1/8/2021 4:14:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
View images
View plain text
Sn WJ o n Q I I I Environmental Health Department <br /> — COU NTY <br /> i <br /> i) Overfill prevention verification : Measurement of drop tubes to verify 95% tank volume <br /> shut off. Verification of flapper functionality. Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection , <br /> j) Sensor functionality: Functionality of the monitoring system must be verified to ensure that <br /> monitoring has been restored to meet the requirements of Title 23 California Code of <br /> Regulations and the Health & Safety Code. If it is determined that a cold start is necessary , <br /> a copy of the alarm history shall be printed prior to performing the "cold start" of the Veeder <br /> Root system and made available at the time of EHD inspection . <br /> k) Verification of the dispenser footprints contained by the UDCs ; any potential leaks from <br /> piping and fuel filters must drain directly into UDCs . <br /> 1) Visual inspection of the piping within the dispensers <br /> m) Leak detector test: Leak detectors must monitored lines volumes shall be appropriate for <br /> the make and model of the installed leak detectors , and shall be verified at the time of <br /> piping installation . <br /> Please be aware that the facility cannot receive fuel or operate the UST system prior to the <br /> EHD inspection and approval. <br /> 4 , Any individual performing the work of a service technician must meet the following <br /> qualifications: <br /> a . Possess or be employed by a person who possesses one of several permissible valid , <br /> current contractor's licenses issued by the Contractors State License Board (may be <br /> issued to the installation company) , or a Tank Tester's license issued to the individual by <br /> the State Water Board , and <br /> b , Possess or work under the direct and personal supervision of an individual physically <br /> present at the work site who possesses a valid , current California UST Service Technician <br /> certificate issued by the International Code Council ( ICC) , and <br /> c. Possesses a valid , current certificate of training from the manufacturer(s) of the <br /> component(s) being tested , repaired , or serviced . <br /> I <br /> 5 . Individuals installing underground storage tank system components must possess or work <br /> under the direct and personal supervision of an individual physically present at the work site <br /> who possesses all of the following : <br /> a . A valid , current contractor's license issued by the Contractors State License Board , and <br /> b , A valid , current UST Installation/Retrofitting certificate issued by the International Code <br /> Council ( ICC) , and <br /> c, A valid , current certificate of training from the manufacturer(s) of the component(s) being <br /> installed . <br /> 6 . The tank owner or operator shall log into the California Environmental Reporting System <br /> (CERS) at http ://cers . calepa . cg agy/ and ensure all UST information is current. <br /> 7. All components must be certified by an independent testing organization and labeled as <br /> required by the organization (UL, ULC , ANSI , API , ASTM , etc.) . See California Code of <br /> Regulations (CCR) Title 23 , Chapter 16, Table B for a complete list. <br /> 8. Permit expires 180 days from the date of approval . If an extension to the expiration date is <br /> required , a written request must be submitted to this office prior to the expiration date . <br /> I <br /> I <br /> i <br /> 2 of 3 <br /> 1868 E. Hazelton Avenue Stockton , California 95205 1 T 209 468-3420 I F 209 464-0138 1 www.sjcehd .com <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).