My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:34 AM
Creation date
1/8/2021 4:14:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID 87 STP 91 Stp Diesel STP Vent box <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 42" 64" 64" 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 16" 18" 18" 12" <br /> (inches) <br /> Test Start Time 10:06 am 10:06 am 11:38 am 10:40 am <br /> Initial Reading 5.0294 4.7467 4.7871 3.1711 <br /> Test End Time 10:21 am 10:21 am 11:53 am 10:55 am <br /> Final Reading 5.0292 4.7466 4.7879 3.1709 <br /> Change in Reading 0.0002 0.0001 0.0008 0.0002 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Sump/UDC ID UDC 1/2 UDC 3/4 UDC 5/6 UDC 7/8 <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 31" 31" 31" 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 16" 16" 16" 16" <br /> (inches) <br /> Test Start Time 1:48 pm 1:48 pm 1:48 pm 1:48 pm <br /> Initial Reading 4.2945 1.9168 4.7297 6.4240 <br /> Test End Time 2:03 pm 2:03 pm 2:03 pm 2:03 pm <br /> Final Reading 4.2949 1.9171 4.7298 6.4242 <br /> Change in Reading 0.0004 0.0003 0.0001 0.0002 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.