My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:42:35 PM
Creation date
1/8/2021 4:16:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure X Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87 91 <br /> Tank Manufacturer Xerxes Xerxes <br /> Tank Capacity 20,000 15,000 <br /> Test Start Time 9:00 9:30 <br /> Initial Reading 10"hg 10"hg <br /> Test End Time 11:00 10:30 <br /> Final Reading 10"hg 10"hg <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 <br /> Tightness Test Results N Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID 87 Product 91 Product 87 Tank Vent 91 Tank Vent <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 11:00 11:00 11:15 11:15 <br /> Initial Reading 5 5 5 5 <br /> Test End Time 12:00 12:00 12:15 12:15 <br /> Final Reading 5 5 5 5 <br /> Change in Reacting 0 0 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ...1 X Pass ❑ Fail N Pass ❑ Fail <br /> Pipe Run ID Vapor <br /> Pipe Manufacturer Smith <br /> Test Start Time 11:15 <br /> Initial Reading 5 <br /> Test End Time 12:15 <br /> Final Reading 5 <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 <br /> Tightness Test Results M Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.